Re-inspection
S.N Inspection Expected & Final
Unit Description of Remaining Work
o Date Completion Approval
Date
1 Washroom wall tiles are not ending on same level and top layer 8-Sep-2020
tiles have voids on upper part
14 Main entrance grill gate is not painted even a single coat 8-Sep-2020
7 Plaster mortar and paint spots are present on skirting and floor 8-Sep-2020
8 Washroom wall tiles top are not finish (bond is present) 8-Sep-2020
9 Main entrance grill gate is not painted even a single coat 8-Sep-2020
10 A-201 Window frames are not filled properly from inside 8-Sep-2020
4 Washroom wall tiles top are not finish (bond is present) 8-Sep-2020
6 A-402 Washroom wall tiles top are not finish (bond is present) 8-Sep-2020
9 Doors have alignment issues and door locks are not fit properly 8-Sep-2020