The document outlines the progress and costs for various construction projects taking place between September 2021 and October 2021. It details work done on backfilling, masonry, plastering, tiling, aluminum work, electrical, plumbing, air conditioning, and fire safety. The total cost for all projects was 19,183,794.05. Work included soil filling, brick laying on three floors, roof waterproofing, bathroom installation, painting, and electrical wiring on floors and the roof terrace. Plumbing involved water supply, sewer, and testing on three floors and the roof. Fire detection wiring and piping was also installed.
The document outlines the progress and costs for various construction projects taking place between September 2021 and October 2021. It details work done on backfilling, masonry, plastering, tiling, aluminum work, electrical, plumbing, air conditioning, and fire safety. The total cost for all projects was 19,183,794.05. Work included soil filling, brick laying on three floors, roof waterproofing, bathroom installation, painting, and electrical wiring on floors and the roof terrace. Plumbing involved water supply, sewer, and testing on three floors and the roof. Fire detection wiring and piping was also installed.
The document outlines the progress and costs for various construction projects taking place between September 2021 and October 2021. It details work done on backfilling, masonry, plastering, tiling, aluminum work, electrical, plumbing, air conditioning, and fire safety. The total cost for all projects was 19,183,794.05. Work included soil filling, brick laying on three floors, roof waterproofing, bathroom installation, painting, and electrical wiring on floors and the roof terrace. Plumbing involved water supply, sewer, and testing on three floors and the roof. Fire detection wiring and piping was also installed.