Professional Documents
Culture Documents
1
1.1
1.2
1.3
1.4
1.5
1.6
2.1
2.2
2.3
3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
4
4.1
4.2
5
5.1
5.2
5.3
6
6.1
6.2
6.3
6.4
7
7.1
7.2
7.3
7.4
7.5
7.6
7.7
8.1
8.2
8.3
8.4
9
9.1
9.2
10
10.1
10.2
10.3
10.4
10.5
10.6
10.7
10.8
10.9
10.1
11
11.1
11.2
11.3
11.4
11.5
12
12.1
12.2
12.3
12.4
13
13.1
13.2
13.3
13.4
13.5
13.6
13.7
13.8
13.9
13.1
13.11
13.12
13.13
14
14.1
14.2
14.3
14.4
14.5
14.6
14.7
15
15.1
15.2
15.3
15.4
15.5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
የሥራ ዝርዝር
ሀ)ከመሬት በታች
የቁፋሮና የአፈር ስራ
ቤቱ የሚያርፍበትን አካባቢ አፈሩ ዉሃ ልክ እንዲመጣ በ20 ሳሜ ጥልቀት ቆፍሮ ማንሳት
b50ሳ.ሜ ጥልቀት የላይኛውን አፈር ቆርጦ ማንሳት
40 ሳሜ ስፋትና 80 ሳሜ ጥልቀት ያለው የመሰረት ጉድጓድ በጥሩ ሁኔታ መቆፈር
በግንቡና በተቆፈረው ጉድጓድና ማስንቻታ በታች የሚገኘውን ክፍት በተመረጠ ኮረት አፈር እየጠቀጠቁ መሙላት
h) kmÊT b¬C
Ãzጋjý ባlÑያ
ፊርማ
መለኪያ መጠን ነጠላ ዋጋ ጠ/ዋጋ
ሜካ 1 19.11 19.11
ሜኩ 1 121.45 121.45
ሜኩ 1 280.86 280.86
ሜኩ 1 91.13 91.13
ሜኩ 1 814.75 814.75
ሜኩ 1 153.9 153.9
ሜካ 1 206.84 206.84
1688.04
ሜኩ 1 1,958.91 1958.91
ሜኩ 1 2,200.86 2200.86
ሜኩ 1 2,614.05 2614.05
6773.82
ሜካ 1 81.45 81.45
ሜካ 1 116.64 116.64
ሜካ 1 304.89 304.89
ሜካ 1 495.71 495.71
ሜኩ 1 2,958.87 2958.87
ሜኩ 1 3,304.71 3304.71
ሜካ 1 514.74 514.74
ሜኩ 1 3,431.61 3431.61
11208.62
ሜካ 1 430.07 430.07
ሜካ 1 466.97 466.97
897.04
ሜሊ 1 63.17 63.17
ሜሊ 1 18.34 18.34
ሜካ 1 125.78 125.78
207.29
ሜካ 1 563.75 563.75
ሜካ 1 511.77 511.77
ሜካ 1 418.96 418.96
ሜካ 1 376.62 376.62
1871.1
ሚሊ 1 124.48 124.48
ሚሊ 1 89.6 89.6
ሚሊ 1 81.89 81.89
ሚሊ 1 313.72 313.72
ሜካ 1 612.27 612.27
ሜካ 1 279.86 279.86
ሜካ 0 0 0
ሜካ 1 430.45 430.45
ሜካ 1 305.84 305.84
2238.11
ሜካ 1 3,470.51 3470.51
ሜካ 1 587.93 587.93
ሜካ 1 1,790.02 1790.02
ሜካ 1 723.56 723.56
6572.02
ሜካ 1 187 187
ሜካ 1 170.23 170.23
357.23
ሜካ 1 115.99 115.99
ሜካ 1 149.67 149.67
ሜካ 1 488.97 488.97
ሚሊ 1 88.86 88.86
ሜካ 1 598.4 598.4
ሚሊ 1 75.31 75.31
ሜካ 1 551.51 551.51
ሚሊ 1 146.58 146.58
ሜካ 1 421.63 421.63
ሚሊ 1 146.49 146.49
2783.41
ሜካ 1 539.13 539.13
ሜካ 1 583.68 583.68
ሜካ 1 348.17 348.17
ሜካ 1 551.51 551.51
ሜካ 1 756.93 756.93
2779.42
ሜካ 1 81.11 81.11
ሜካ 1 88.05 88.05
ሜካ 1 124.65 124.65
ሜካ 1 121.86 121.86
415.67
ሚሊ 1 154.22 154.22
በቁጥር 1 120.97 120.97
በቁጥር 1 1044.27 1044.27
በቁጥር 1 909.27 909.27
በቁጥር 1 820.33 820.33
በቁጥር 1 3,744.27 3744.27
በቁጥር 1 121.1 121.1
6914.43
ሜካ 1 58.46 58.46
ሜካ 1 55.17 55.17
ሜካ 1 54.98 54.98
ሜካ 1 1270.43 1270.43
ሜሊ 1 325.22 325.22
1,764.26
ጠቅላላ ዋጋ
ብር 1,688.04
ብር 6,773.82
ብር 11,208.62
ብር 897.04
ብር 20,567.52
ብር 207.29
ብር 1,871.10
ብር 2,238.11
ብር 6,572.02
ብር 357.23
ብር 2,783.41
ብር 2,779.42
ብር 415.67
ብር 7,113.47
ብር 6914.43
ብር 1,764.26
ብር 33,016.41
ብር 53,583.93
Ãrጋgጠý mhNÄþS
ፊርማ
North Wolo Urban Development,Housing&Construction Department
UNIT PRICE WITH OUT VAT FOR 4thQUARTER YEAR OF 2009 e.c
ITEM No. DESCRIPTION UNIT
SUB STRUCTURE
1 Excavation and earth work
1.1 Site clearing Removing top soil 200mm thick. M2
1.8 back Fill Around masonary Wall &Under Hard Core imported Form out side M3
1.9 back Fill Around masonary Wall &Under Hard Core Excavated Form the site M3
7 Masonary work
2.1 50cm Thick Stone Masonary Below NGL M3
2.3 One Side Dress Stone Masonary Steps bedded in Cement sand mortar(1:4) M3
3 Concrete work
3.1 C-5 Lean concrete M2
3.8 Reinforcement
a φ6mm Reinforcement bars Kg
b φ8mm Reinforcement bars Kg
SUPER STRUCTURE
4 Concrete work
4.1 C-25 Reinfoced Concrete M3
4.6 Reinforcement
a φ6mm Reinforcement bars Kg
5 Roofing Work
5.1 Corrugated steel sheet G-35 Roofing M2
6 Block Work
6.1 20cm Thick HCB Wall CLASS C M2
7 CARPENTARY&JOINERY WORK
7.1 Dia.10-12mm Equaliptus Truss Member (uper chord&lower chord) ml
9 METAL WORK
9.1 Metal Doors M2
10 PLASTERING WORK
10.1 Only 3rd coats (fine coat) Cement Plaster to internal &External wall surface on HCB M2
10.2 Only 2nd coats Cement Plaster to internal &External wall surface on HCB M2
10.3 Only 3rd coats (fine coat) Cement Plaster to Concrete surface Edges M2
10.8 Two Coats Cement Mortar Plastering& One Coat Rendering to HCB Wall M2
11 POINTING WORK
11.1 Pointing On Stone Masonary M2
14 PAINTING WORK
14.1 Apply 3Coats of Plastic Paint to Plastered Surface M2
14.6 Apply 3Coats of Sythetic Enamil Paint to Plastered Soffit& Rendered Surface M2
14.8 Apply Two Coats of Plastic Paint to Plastered Soffit& Rendered Surface M2
15.2 SDB with locable door including all acssesary with out Breakers for 6 breakers Pcs
16 Wall Work
16.1 Dia.12mm Equaliptus For POST ml
16.2 Dia.6mm Equaliptus For Horizontal Member ml
17 Sanitory Installation
17.1 1/2 inch GI pipe ML
Postgraduate Building
A-SUB STRUCTURE
B. SUPER STRUCTURE
1 Concrete work.......................................................................................... Birr
2 Block work.................................................................................................. Birr
3 Carpentry and joinery..................................................................................... Birr
4 Steel Structural & Metal Work........................................................................... Birr
5 Plastering & pointing .................................................................................... Birr
6 Finishing Work......................................................................................... Birr
7 Painting Work...............................................................................................Birr
8 Roof Work …………………………………………………………………. Birr
9 Glazing Work …………………………………………………………………. Birr
10 Electrical Installation,.............................................................................. Birr
11 Sanitary Installation...................................................................................... Birr
12 Site work..................................................................................................... Birr
1 18.7
1 118.12
1 720.11
1 1360.21
1 197.53
1 874.42
1 1530.23
1 2448.38
1 1112.9
1 2040.31
1 3060.47
1 274.91
1 1112.9
1 1490.42
1 846.63
1 88.63
1 148.9
1 202.66
1 1682.82
1 1902.02
1 2292.84
1 78.62
1 112.99
1 297.21
1 2885.48
1 2905.07
1 2899.23
1 427.4
1 59.62
1 51.41
1 51.26
1 56.45
1 55.81
1 65.6
1 77.68
1 77.68
1 35.94
Page-02
1 3224.65
1 483.7
1 3349.93
1 502.49
1 390.08
1 59.69
1 51.47
1 51.32
1 56.51
1 55.87
1 65.66
1 77.74
1 77.74
1 249.39
1 373.42
1 473.05
1 526.27
1 621.3
1 568.08
1 480.32
1 356.3
1 242.19
1 236.58
1 340.57
1 311.72
1 271.14
1 704.48
1 133.79
1 98.91
1 78.76
1 613.79
1 87.68
1 431.98
1 431.98
1 312.05
1 1284.84
1 609.84
1 282.97
1
1 308.94
Page-03
1 89.17
1 38.7
1 65.98
1 64.21
1 67.05
1 38.7
1 92.55
1 81.22
1 822.56
1 460.26
1 276.1
1 78.98
1 52.73
1 119.8
1 108.74
1 171.14
1 129.16
1 169.4
1 221.16
1 57.91
1 54.69
1 54.49
1 147.64
1 114.63
1 486.02
1 339.29
1 548.22
1 404.15
1 582.43
1 614.84
1 612.75
1 88.08
1 91.43
1 145.32
1 66.84
1 144.21
Page-04
1 81.54
1 88.52
1 125.41
1 122.39
1 92.78
1 99.77
1 78.13
1 85.12
1 80.51
1 87.5
1 210.08
1 210.08
1 753.88
1 632.38
1 551.38
1 551.38
1 416.38
1 450.13
1 172.41
1 176.12
1 323.97
1 437.88
1 101.05
1 206.35
1 114.86
1 98.59
1 98.59
1 63.31
1 18.48
1 125.92
1 172.27
1 167.84
Page-05
1 154.22
1 144.66
1 154.69
1 153.67
1 112.47
1 98.9
1 136.72
1 128.27
1 182.28
1 327.86
1 398.74
1 469.61
1 611.36
1 973.97
1 879.26
1 1,486.33
1 1133.36
1 816.95
1 1,184.38
1 3587.14
1 862.39
1 2143.05
1 3,393.05
1 1509
1 170.68
1 124.72
1 180.44
1 261.44
1 490.94
1 15,531.40
1 22593.4
1 36,059.65
1 8777.65
1 169.28
1 223.28
1 257.03
1 124.1
213,700.64
22,948.23
635,504.66
872,153.53
404,950.08
337,191.86
149,543.10
143,370.00
53,254.58
1,443,750.00
402,262.85
13,369.34
10,777.00
3,240,000.00
28,350.00
46,800.00
6,273,618.80
7,145,772.30
1,071,865.85
821,763.82
9,039,402.00