May 07, 2020

Budgetary Quotation No. - INQ/19-20/XXXXX

Mr. Paul Ward


Belgrave & Powell Limited
UK

Subject: Budgetary Techno-commercial Proposal – Cut Off Machine

Dear Sir,

This has reference to your mail with requirement specifications received on 11th Dec. 2019
and subsequent changes suggested in mail dated 23rd April 2020 and drawings shared earlier.

INDEX

 Technical inputs from customer


 Concept of machine
 Scope of Supply
 Detailing scope of supply
 Make list of items
 Exclusions
TECHNICAL INPUTS FROM CUSTOMER:

Sr. No. Description Specification


1 Application Cut Off Machine for Turbine Blades
2 Component Turbine Blades
3 Component details NA
4 Variants NA
5 Max Component Weight 500 kg
6 Max Cut Piece weight 50 kg
7 Component Table size 1000 mm X 1000 mm

Page 2
CONCEPT OF MACHINE:

1) Total Layout of System :-

(Proposed Layout of the machine)

Note: Above mentioned is the conceptual proposed layout & may vary with the actual design.

Page 3
SCOPE OF SUPPLY:

 Complete Cut Off Machine– 01 Set.


 Electricals & Controls – 01 Set

DETAILING SCOPE OF SUPPLY:

 SYSTEM DETAILS:-

 Fabricated Machine Base


 Carriage for Turbine
o Stroke of the Carriage is increased from 726 mm to 1026 mm.
 Table and Trunnion
o With a positive stop to the underside of the table in the form of a toothed ring
with a wedge operated on a hydraulic cylinder to provide a positive stop every
degree.
 Saw arrangement:-
o Cut Off Saw:- Dia 800 mm/1000 mm, 8 mm Thick
o Saw Spindle with bearing arrangement
o Drive Motor:- 150kW, 1500 RPM
o Hydraulic Cylinders for actuation
o Max height from table top to underside is increased to 1026mm
 Hydraulic Power Pack
 Conveyor for Cut pieces
 Machine guards and enclosure
 Sensors and switches
 Operator Console
 PLC Control Panel

Page 4
 MAKE LIST-ELECTRICALS & CONTROLS:

Sr. No. Description Make Unit Qty.


1 PLC Mitsubishi Nos. 01
2 HMI 7” Mitsubishi Nos. 01
3 Input module – 32 Input Mitsubishi Nos. 01
4 Output Module –32 output Mitsubishi Nos. 01
5 Necessary Switchgears Schneider Nos. 01
6 Push buttons Schneider/Teknic Nos. 01 Set
7 Transformer Sahara Nos. 01
8 Sensors Omron/Sick Nos. 01 Set.
9 Electrical Panel Rittal Nos. 01
10 Cables Lapp Set 01

 MAKE LIST-PNEUMATICS & MECHANICAL:

Sr. No. Description Make Unit Qty.


1 Pneumatics Festo Set 01
2 Hydraulic Elements Rexroth/Parker Set 01
2 Rack & Pinion Atlanta Set 01
3 Gearbox Girard Set 01
4 Drive motors for Gear box Bonfiglioli Set 01
5 Drive motor for Saw Siemens Set 01
5 Bearings, Bearing Units SKF/FAG Set 01
6 Guide Rods/Bush/Pulleys Misumi Set 01

EXCLUSIONS:

1. Pneumatic supply to the system.


2. Power supply to the system.
3. All the Civil Work, Piping for Utilities etc. required at site.

Page 5
4. Material handling equipments required for installation like crane, fork lift etc.
5. Test parts, to and fro transport and local duties if any.
6. Anything not specifically mentioned in the proposal.

Budgetary PRICE

Unit Price Total Price


Sr.No Unit Description Qty.
GBP GBP
FOB Price of Cut Off Machine with
1 1,89,000 1 Set. 1,89,000
electricals and controls
2 Packing Included
3 Installation & Commissioning Extra
Total 1,89,000

BASIC Price: GBP One Hundred Eighty Nine Thousand.

The above prices are basic & excluding applicable taxes.

Page 6
TERMS & CONDITIONS:

The Following terms & conditions are applicable for our Techno-commercial offer.

1. Price :
The above equipment complete with assembly, partial testing and proving trials on our
shop. Price quoted is FOB Mumbai, including packing. It does not include any taxes, duties
or any other levies.

2. Taxes :
a. Taxes will be applicable as prevalent on the date of dispatch, and will be at actual to your
account. These taxes are to be charged to you extra at actual as per the prevailing Govt.
norms & regulations at the time of dispatch.
b. Packing – Included.

3. Freight :
a. Freight cost will be borne by customer.

4. Transit Insurance :
a. Included.

5. Payment Terms :
a. 50% advance along with the Purchase Order.
b. 40% at Pre Dispatch Inspection at FCL
c. 10% after installation & commissioning or within 60 days after installation whichever is
earlier.

6. Delivery :
12-14 weeks after Design Approval and receipt of 50% advance.
Delivery period considered form the date of receipt of your technically and commercially
clear order along with the advance. The delivery date will be reckoned against the latest
of the above date(s).

7. Validity :
This offer will be valid for 15 days from the date of quotation. Thereafter this will be
subject to our reconfirmation.

8. Force majeure :

Page 7
The delivery indicated is subjected to the usual force majeure conditions such as plant
breakdown, strikes, riots, natural calamities, lockout, changes in government regulations
and/or other factors beyond our control.

9. Warranty :
The warranty period will be 12 months from the date dispatch against any manufacturing
defects in the equipment or parts of equipment designed & manufactured by us. In the
event of the machinery of our manufacture or any parts there of proving defective during
warranty period by reason of defect as practicable. Under all circumstances our liability
arising out of any manufacturing defects/workmanship if any, will be restricted to the
value of replacement of parts etc., and not extended to any consequential damage. Our
warranty extend to the system provided by us and does not related to any other
machinery, related equipment which may be linked to the system. Warranty above said
will not be applicable if installation, commissioning and usage instruction are not properly
adhered to as per our guidelines instructions. This warranty does not cover any bought
out items unless extended to us by our suppliers, and also standard items as motors, gear
boxes, sprockets, chains, etc. which are being procured from outside.

10.Service Contract :
Beyond 12 months warranty period a comprehensive contract could be extended by the
customer to take care of the services of the equipment.

11.Testing & Trials :


Final tests and trials of the equipment will be conducted at our end, as feasible. Customer
to arrange for their products, packing consumables etc., to facilitate the tests /trials runs.
In case, we need to arrange the same, we shall do it accordingly and the actual expenses
as per supporting details to be borne by the customer.

12.Delay in off take / installation :


In case of any delay in lifting the material after its readiness the customer should pay
within 10 days of receipt of our final invoice. If any extra ware housing cost is incurred by
us to hold the material, the same will be charged on to you. Similarly if the installation
work cannot be undertaken because your site is not ready or the upstream equipment’s
have not been commissioned, payments against final bills will be released without any
restrictions, against our undertaking to do erection and commissioning at a later date,
when the site is ready.
Any delay in payments will attract interest charges on the bills @ 2% per month or part
thereof (to be computed from the 10 days of the date of invoice).

13.Others:
a. Materials/facilities such as electricity, compressed air, lubricants, to be ensured without
extra cost to us, at your works for facilitating installation and commissioning. Labor
required for handling, shifting, erection and commissioning etc. also to be provided by
you, without extra cost to us.

Page 8
b. Grouting/foundation is envisaged for these lines systems. In case any civil works are
required, the same to be arranged by you. Electrical distribution and cabling up to the
equipment’s point to be done by you at your cost.
c. The buyer should give an undertaking in which he agrees and confirms that the design
and technical specifications of the system and/or the parts or elements of the system
shall remain at all times the property of `Forbes & Co. Ltd.’. The buyer further agrees that
at no time he shall duplicate or modify or make machine or part or component there of
same as or similar to the one supplied in the system by `Forbes & Co. Ltd.’

14.Erection, Commissioning and Trials :-


a. Customer has to give one week notice period to make necessary arrangements for
erection & commissioning.
b. Erection and commissioning will be extra. We will depute Skilled Technicians to complete
this job. All rigging and material movement will be done by you under our supervision.
c. Estimated time for installation & commissioning ~ 1~2 weeks.

We look forward to receive your valuable feedback to proceed further.

For Forbes & Co. Ltd.

Ravi Prem
Chief Operating Officer
Forbes & Company Limited,
Saki Powai road, Sangharsh Nagar,Chandivali,
Andheri(E); Mumbai – 400 072., India

Page 9