FRONT ELEVATION SIDE ELEVATION GENERAL ARRANGEMENT

Saddle
S-2 S-3 S-4 S-5 S-6 S-1
2 Main Cables.
Top Element
T-4
T-3
T-7 T-1 T-2 2 Main Cables
T-5
Saddle S
Top Element T
T-6
I-1
I-2 Intermediate Element I

I-7

I-4 I-8

I-9 Intermediate Element I

Base Element B
E
Temporary Erection Element
I-5 2500
I-7

I-8

I-9
REQUIREMENT FOR ONE TOWER :
Number
I-1
Drawing Title Drawing of unit
I-2 No required
I-4 Tower Base Element 100N 1
Tower Intermediate Element 109N 2
Tower Top Element 119N 1
300 300 400
Tower Saddle 135N 1
Tower Foundation 89N 1

I-3

B-2 B-3 B-4

HMG / Ministry of Local Development


DoLIDAR / Short SpanTrail Bridge Standard
B-5 Bridge Name:
B-1
No: Span:
B-1 Steel Drawing:
Top of Tower Foundation Temporary
Tower No. 1
Erection Element
Assembly & Layout of Tower
(Side Strut)
Height : 5.50 m , for 2 Main Cables
Width between Tower Legs = 2.50 m
2500
383 383 Date : September 30, 2002 Drawing No. 141N