DATE: 27-03-2014
CROSS REF. TO
SL.NO. FEDERAL LAW REFERENCE NUMBER REQUIREMENTS / APPLICATION ELEMENT/CLAUSE NO.OF PAGE NUMBER / SUMMARY OF THE REQUIREMENT STATUS OF COMPLIANCE
LAW
Complied. All employees are provided with adequate PPE at the time
For protection of workers against dangers of Page - 137. To ensure adequate preventive equipment is
employment accident , occupational hazards given to protect the workers against the dangers of of induction and awareness on the hazards involved and its mitigation
1 Federal Law No.8 of the year 1980 which results from the use of machines and Article 91 employment accidents and occupational diseases, fire are provided training and implementation of operational control
procedures and risk management study. Mandatory PPE sign board is
other equipments hazards that may occur during work.
placed near the main entrance.
Compliance of all workforce to the instruction Page - 140. It shall be unlawful for a worker to commit any act Complied - through risk assessment training, in house training, weekly
3 Federal Law No.8 of the year 1980 and orders respecting industrial and personal Article 100 leading to non- compliance with such instruction , to the safety briefing etc and all workforce are instructed on safe use and
safety precautions misuse of the equipment provided. handling of machines / equipment
4 Federal Law No.8 of the year 1980 Induction Training Article 98 Page - 139 , The employer shall inform each worker at the Complied - HSE induction are provided for all new recruits in ABE HO
time of joining , the dangers connected with his occupation and for all site personnel at site training hall
Employer shall provide Ventilation, lighting Page - 138 . To ensure perfect cleanliness and ventilation in
6 Federal Law No.8 of the year 1980 drinking water and toilets & Cleanliness of Article 94 each workplace and shall provide each workplace with Complied. Sufficient numbers of cool drinking water facilities, sufficient
toilet facilities , rest room facilities are arranged at site.
workplace adequate lighting ,drinking water and toilets.
DISCIPLINARY RULES
Page 153 (d) , Termination of contracts of employment Complied . Monitored by HR department and controlled through the
8 Federal Law No.8 of the year 1980 Termination of Contract - Safety Violations Article 120
severance pay project and HSE department
The Determination of retentive methods and measures for the Protection of workers from the risks of work - Ministerial order no (32) of 1982
Page -388 .The Occupational risks like fire and machinery risks
Suitable training on the Hazards and risks like ,dangers of falling and relevant occupational diseases and
Comply through Tool box talks, safety induction , HSE meetings and
3 Ministerial Order No. 32 / 1982 fire and machinery risks ,dangers of falling and Article 3 other risks are explained by the Employer or Employer's
the same is carried out throughout all the projects
relevant occupational diseases and other risks representative through Tool Box Talks conducted at the all
the project site
1 ABE-HSE-F-037, Rev.00
DATE: 27-03-2014
CROSS REF. TO
SL.NO. FEDERAL LAW REFERENCE NUMBER REQUIREMENTS / APPLICATION ELEMENT/CLAUSE NO.OF PAGE NUMBER / SUMMARY OF THE REQUIREMENT STATUS OF COMPLIANCE
LAW
FIRST AID
Page no. 413.To Provide First aid kits for an employer whose Complied : project have first aid box kits , valid and updated when
5 Ministerial Order No. 32 / 1982 First Aid Box Article 4 employees are not more than fifty in one place or area of needed
radius twenty kilometers
Complied : project have first aid box kits , valid and updated through
6 Ministerial Order No. 32 / 1982 Contents of First Aid Box Article 4 (Table -3) Page 410
the first ad log sheet
The conditions of workplace includes the floor Page - 392. To ensure the conditions of workplace i.e. the
of the work room to have even surface,
sufficient space in between the machineries , floor of the workroom to have even surface, sufficient space
8 Ministerial Order No. 32 / 1982 allowing space for workers to perform work Article 7 left around machinery allowing space for workers to move On going throughout the Project
freely, passages shall be free of holes ,not with and perform duties without obstacles and allowing for
machine repairs, Passages
dumped materials, mobile ladders
Facilities for Fire preventions: entry, exit, Fire Page 393. To ensure that the necessary facilities are provided Project complied to this requirement, by establishing adequate
extinguishing equipment's, fire alarm system, for the prevention of fire and fire extinguishers appropriate
9 Ministerial Order No. 32 / 1982 Article 8 methods during the site mobilization period .Complied through Mock
warning sign and training for emergency for the type of materials ,Provision of entry , exit and ladders
response. in the workplace in order to facilitate speedy exit of workers drill plan, emergency procedure and emergency plan
Precautionary measures to protect the workers Page - 394. To ensure that the personal protection facilities
form High Risk Areas,falling,falling objects, such as protective glass,gloves,belts,uniforms,mask or other Complied within the projects through safe work practice, Job safety
10 Ministerial Order No. 32 / 1982 flying metals or sharp bodies , hot or Article 9 protective clothes suitable for the kind of work to protect analysis and educating all workforce on the risk involved within this
inflammable or explosive materials by from the dangers of falling, falling objects, flying metals or activity
providing PPE sharp bodies
Display of Safety Instructions/Signs for complied the same, with all safety warning boards installed wherever
12 Ministerial Order No. 32 / 1982 Article 14 Page 395
Machinery necessary
14 Ministerial Order No. 32 / 1982 Precautions during construction work Article 19 Page 399 (b) Complied - With CONTROL PROCEDURE, INSPECTIONS
NOTIFICATION OF INCIDENTS
MEDICAL CARE
18 Ministerial Order No. 37/2 year 1984 First Aid Box, Treatment facility and Article 2 to 7 Employment of Nurse & Treatment facilities for more than Page no. 413. Compliance : The projects have 4 trained first aiders for
Employment of Nurse 200 employees initial treatment to employees
Mid day break from 1230 hrs to 1500 hrs in the month of July On going : The project is observing the compulsory mid day breake as
19 Ministerial Resolution 410 year 2006 working in under direct sunlight Article 1 to 11 and sep. per the leagal order.
2 ABE-HSE-F-037, Rev.00
DATE: 27-03-2014
CROSS REF. TO
SL.NO. FEDERAL LAW REFERENCE NUMBER REQUIREMENTS / APPLICATION ELEMENT/CLAUSE NO.OF PAGE NUMBER / SUMMARY OF THE REQUIREMENT STATUS OF COMPLIANCE
LAW
Application for Waste Discharge Permit to Application for waste discharge permits land, and marine On going . All waste discharge has been carried out by municipality
1 Dubai Municipality Technical Guidelines Guideline no:1
sewer, Land and Marine Environment environment approved agenceis .
Provide/take rest breaks, cool drinking water, Heat Complied. All employees are provided with adequate shelter and
5 Dubai Municipality Technical Guidelines Heat Stress at Work Guideline no:7 protective clothing, Medical facilities, welfare facilities
6 Dubai Municipality Technical Guidelines Entry into Confined Spaces Guideline no:8 Permit to work system On going. Permit to work system is followed for hot work, cold works&
Confined space entry as and when required.
Provision of ELCB/ Earthing for electrical appliances. Lock On going. Monthly electrical inspection is in progress within the office
7 Dubai Municipality Technical Guidelines Electrical Safety at Work Guideline no:9
out / Tag out system- Permit to work system premises and in the site permises.
Guards of moving parts, Tight clothing, No ring or jewellery, Complied . All workforce and staffs are provided with adequate PPE
8 Dubai Municipality Technical Guidelines Guarding of Dangerous Machinery Guideline no:10 Long hair, Periodic Maintenance of machine, Trained and sufficient training on the hazards involved and its control
operator. measures through tool box talk, weekly safety meetings .
Personal Protective Equipment - Head Dubai occupational health and safety regulation require the Complied . All workforce and staffs are provided with adequate PPE at
9 Dubai Municipality Technical Guidelines Protection Guideline no:14 employer to provide necessary PPE the time of joining .
10 Dubai Municipality Technical Guidelines Personal Protective Equipment - Eye and Face Guideline no:15 Dubai occupational health and safety regulation require the Complied . All workforce and staffs are provided with adequate PPE at
Protection employer to provide necessary PPE the time of joining .
11 Dubai Municipality Technical Guidelines Personal Protective Equipment - Hearing Guideline no:16 Noise level Measuring and Audiometric testing program for On going. Ear muffs and plugs are provided to the work force. Noise
Protection employees exposed to noise levels in excess of 90 dBA monitoring will be done as and when necessary .
Personal Protective Equipment - Protective Dubai occupational health and safety regulation require the Complied . All workforce are provided with adequate PPE at the time
12 Dubai Municipality Technical Guidelines Guideline no:17
Clothing employer to provide necessary PPE of joining-.
Personal Protective Equipment - Hand Dubai occupational health and safety regulation require the Complied . All workforce and staffs are provided with adequate PPE at
13 Dubai Municipality Technical Guidelines Guideline no:18
Protection employer to provide necessary PPE the time of joining.
Dubai occupational health and safety regulation require the Complied . All workforce and staffs are provided with adequate PPE at
14 Dubai Municipality Technical Guidelines Personal Protective Equipment - Foot Protection Guideline no:19 employer to provide necessary PPE the time of joining.
Where persons are engaged in a workplace at a height more Complied . All workforce who carry out these specific operations are
Personal Protective Equipment - Fall
15 Dubai Municipality Technical Guidelines Guideline no:20 than 3 meters and the work platform is not provided, the use inducted and trained on the hazards involved within the process and
Protection / Safety Lines of safety belt is essential its also monitored .
Safe Use of Industrial Organic Solvents / MSDS Requirements, Medical examination once in a year, Fire Complied. MSDS of all hazardous materials ae available at site store
16 Dubai Municipality Technical Guidelines Guideline no:22 and with EHS department. TTB is conducted to al regarding the
Chemicals fighting equipment, signs. Labeling of chemicals hazardous chemichals useed in the project.
Application for approval to Dispose of This guideline explains the procedure and requirements of Complied. All hazardous waste has been disposed through fujairah
17 Dubai Municipality Technical Guidelines Hazardous Wastes Guideline no:26 online submission of request for disposal of waste municipality & POF approved agency only.
Requirements of safety precaution to prevent from health Complied. Blasting and painting shed is provided and blastging and
19 Dubai Municipality Technical Guidelines Paint Spray Booths Guideline no:30 painting activities are carreid out only inside the shed only. Personal
hazard and environmental nuisance
protectivre equipments are provided for the blasters and painters .
20 Dubai Municipality Technical Guidelines Safety in vehicle repair and servicing shops Guideline no :31 Requirement of local order 61/1991 No such activity at site
21 Dubai Municipality Technical Guidelines Examination and Certification of Cranes, Hoists, Lifts and Other
Guideline
Lifting Appliances Inspection and testing of lifting equipments and appliances
no:41 Complied . All lifting equipment are tested by a approved 3rd party and
once in 12 months by competent person certificates are maintained and update in the respective FORM - 037
3 ABE-HSE-F-037, Rev.00
DATE: 27-03-2014
CROSS REF. TO
SL.NO. FEDERAL LAW REFERENCE NUMBER REQUIREMENTS / APPLICATION ELEMENT/CLAUSE NO.OF PAGE NUMBER / SUMMARY OF THE REQUIREMENT STATUS OF COMPLIANCE
LAW
The guidelines specifies the minimum requirement that Complied. All hazardous waste has been disposed through fujairah
22 Dubai Municipality Technical Guidelines Guidelines for the Disposal of Used Chemical Containers. Guideline no:47
should be followed while disposing chemical containers municipality & POF approved agency only.
The guidelines specifies the minimum requirement for the Complied- Storage tanks made for the construction purpose is
23 Dubai Municipality Technical Guidelines Bunding of storage tanks Guideline no : 57
bunding of tanks provided with bund protection and trays.
The aim of a emergency plan is to ensure the safety of those Complied: A emergency plan in accordance to the HSE procedure has
24 Dubai Municipality Technical Guidelines Guideline
Development of Emergency Response Procedures for Accident no:61Dangerous
Involving Goods been formulated ,site specific potential situations are identified and
on sites, to reduce the impact of the incident mock drill are conducted to create awareness
Chapter 1. Waste water shall be recycled by DM wherever On going. Wastes are segregated within the projects and its been
1 Environment protection regulation Disposal of waste water and sludge Article 5 possible, in accordance with the condition and specification disposed by a DM approved contractor on a daily / weekly basis
stipulated.
Complied. All workforce while joining have been provided with safety
Article 38 Chapter 4 . Employer's compliance in protecting the workforce inductions , which helps them to understand the hazard and risk
involved and the measures to tackle it
Workforce compliance in following the safety rules and All work force are given induction and necessary awareness on
Article 39 following the safety rules, and the same is monitored through
regulations of the organization inspections, audits
The worker shall inform his senior if he feels the use of Complied. All workforce are given right to inform the supervisor if they
Article 42 machineries / equipment is dangerous to safety requirements find and defect in the equipment / tools issued to them. And the same
are not complete which may lead to accident. is replaced immediately
The procedures and conditions which shall be taken into Complied . Throughout the project, we provide a safe working
2 Dubai code of construction practice Occupational health and environment control Chapter 3 consideration to protect the working environment. It includes environment to all the personnel by complying with relevant safety
matters such as occupational health, medical services, procedures, standards, training, monitoring , and proper welfare
medical facilities. workplace's cleanness Page 27 facilities
The contractor shall provide at his expense, personal Complied . All personnel who are exposed to hazards and risk are
protective equipment (PPE) required for different operations provided relevant safety gears at the time of induction and they are
3 Dubai code of construction practice Personal protective equipment Chapter 4
and shall take all necessary measures to ensure that PPE are educated to use and safe guard the PPE belongings and are monitored
effectively worn by employees. Page 44 via awareness trainings and inspections
Provision of warning and informing employees of different Complied. The projects have installed adequate warning and sign
5 Dubai code of construction practice Signs , signals and barricades Chapter 6
hazards and any special precautions. Page 77 boards to educate and inform all workforce
Complied. All materials are stacked and stored in the designated area.
6 Dubai code of construction practice Material handling and storage Chaper 7 All materials shall be stored and protected against damages. Aisles and walk ways are kept clear from hazards. Appropriate safe
Page 88 measures are complied within the project.
4 ABE-HSE-F-037, Rev.00
DATE: 27-03-2014
CROSS REF. TO
SL.NO. FEDERAL LAW REFERENCE NUMBER REQUIREMENTS / APPLICATION ELEMENT/CLAUSE NO.OF PAGE NUMBER / SUMMARY OF THE REQUIREMENT STATUS OF COMPLIANCE
LAW
Complied. All employees who are operating these tools on their daily
8 Dubai code of construction practice Hand and power operated tools Chapter 14 The necessity of instructing employees, who use these tools works , are instructed on safe use and handling through safety tool box
in proper and safe us of tools. Page 182 talks and the equipment are inspected via monthly inspection check
list
TRAKHEES REQUIREMENTS
1 Work Start Cetificate of confirmity 1,2 & 3 required & NOC Trakhees Guidelines This section explain the general safety requirements is Complied Complied and on going via implementation of operational controle procedures.
2 Security Clearance for working inside Jafza Premises Trakhees Guidelines This section explain the general safety requirements is Complied Complied and on going via implementation of operational controle procedures.
5 Night Work Jafza Approval/ Permit is required for Night works Trakhees Guidelines This section explain the general safety requirements is Complied Complied and on going via implementation of operational controle procedures.
6 Radiography Jafza Permission/approval required for Performing Trakhees Guidelines This section explain the general safety requirements is Complied Complied and on going via implementation of operational controle procedures.
Radiography
5 ABE-HSE-F-037, Rev.00
MONITORING OF LEGAL AND OTHER REQUIREMENTS FOR ABUDHABI OPERATIONS
DATE: 27-03-2014
ABUDHABI MUNICIPALITIES & AGRICULTURAL DEPARTMENT
Page -18.
It specifices the categories of accident. Complied thorughout the project by following
H&S codes of practice for Accident / incident / nearmiss Reporting procedure to the authorities if any accident the procedure HSE - 004. And all project HSE
2 Section 3. Part 1
construction reporting procedure and investigation occurs plan has a specific instruction, which they
And how to investigate if any accident occurs and its adhere too
records management
6 ABE-HSE-F037, Rev.00
SITE STANDARDS & GUIDELINES
Working in high temperatures, Page - 25. Working in remote areas and working on
H&S codes of practice for Project HSE plan address this specification
8 adverse weather condition and Section 2. Part 2 sites where temp exceeds 75F, requires planning and
construction and the same are followed when necessary
remote location preparation to assure the safety of workforce.
Page 32.
Health hazards associated with noise
H&S codes of practice for Noise measurement and survey instrument used for On going. Projects are to started to monitor
9 Noise at work Section 3. Part 2
construction evaluating maximum exposures noise and will be monitored and complied.
Noise level at planning stage and methods for reducing
it
Page 40
Ongoing . Medical plan has been on progress
H&S codes of practice for Classification of health hazards
10 Occupational health Section 4 . Part 2 on identifying the personnel who are exposed
construction Medical treatement for work force who are exposed to
to occupational dieseases.
health hazards
Page - 59.
6.1.3 - Checking for underground services prior to work
start Complied . All projects use adequate devices
H&S codes of practice for
12 Overhead and underground services Section 6. Part 2 6.2 - Insrtuction on digging - mechnical or manual in identifying the underground services. OCP -
construction
6.4 - General precautions to safe guard the service 19 addresses this procedure
lines.
6.5 - Procedures for backfilling
Page - 74
7.3.1 - Inspections, test and maintenance must be
carried out on routine basis
On going. Projects are to started to monitor
H&S codes of practice for 7.3.2 - Installation and testing shall be done by
13 Electricity at sites Section 7. Part 2. electricty and light and will be monitored and
construction authorized person
complied.
7.5 - Equipment earthing -ELCB
7.8 - Cables and its condition
7.9 - Lighting facilites
7 ABE-HSE-F037, Rev.00
Page - 86
9.1 -Storage of highly flammable liquids
H&S codes of practice for Highly flammable liquids & liquefied 9.2 - Fire prevention Complied.All flammable liquids and gases are
14 Section 9 . Part 2
construction pertoleum gases 9.3 - Handling of flammable liquids stored according to the regualtions
9.2.3 - Transportation of cylinders
9.2.5 - General precautions
H&S codes of practice for Page 116. Permit to work guidance and the key On going. All hot work carried out within the
16 Permit to work Section 11. Part 2
construction personnel responsibilites while carrying out the work projects have specific permit system.
Page 142- It describes the system , procedure to be Complied. All project personnel are provided
H&S codes of practice for
18 Site transport Section 13.Part 2 followed for a safe using of vehicles within the adequate training on safe driving of vehicles
construction
construction site within the project
Page 160
15.6 Safety standards for specific type of plant and
equipment
15.6.1 -Compressor & pneumatic tools
H&S codes of practice for Complied and operational control procedures -
20 Static plant and equipment Section 15. Part 2 15.6.3- Bar bending machines
construction 009,010 & 016 are followed.
15.6.4 - Welding equipment
15.6.6 - Wood work machinery
15.6.9 - Hoists
15.6.11 - Drilling equipment
8 ABE-HSE-F037, Rev.00
Page 184- This section defines how to be safe while
operating with abrasive wheels
Complied by using operators with experience
17.1- Duties of operators
and knowledge. The operation is carried out
H&S codes of practice for 17.5 - Mounting of wheels
22 Abrasive wheels Section 17 . Part 2 under adequate supervision. The tools and
construction 17.6 -Cutting off wheels
accessories are inspected regularly and by
17.8 -Guards
onsite monthly inspection.
17.9 - Controls & general precautions
Page 203 - General safety requirements in selecting / Complied through by only allowing Qualified
operating / lifting / erecting / maintain these types of and competent operator holding valid
equipment certificates and relevant licenses recognized
19.1.2 - Operators competency by the DM to operate lifting equipments.
H&S codes of practice for 19.2 - Lifting plan Monthly inspection by the project Safety team
24 Cranes and hoists Section 19. Part 2
construction 19.3 - Crane selection and apparently the inspection and load testing
19.4 - Safety precautions before erection by the DM recognized third party certification
19.5 - Load radius indicator body are carried out. Crane selection for
19.6 - General operating procedures appropriate task is analyzed and decided by
19.7 -Inspection and testing the project management team.
9 ABE-HSE-F037, Rev.00
Page 337 - This section gives both the general
precautions and the special precautions that needs to
be taken while carrying out pile work.
H&S codes of practice for Complied and on going via implementation of
28 Piling Section 26 . Part 2 26.1 - General precautions
construction OCP - 28
26.2 - Material handling
26.3 - Types of piling operations and precautions
10 ABE-HSE-F037, Rev.00
MONITORING OF LEGAL AND OTHER REQUIREMENTS FOR FUJAIRAH OPERATIONS
DATE: 27-03-2014
Complied. All employees are provided with adequate PPE at the time of
For protection of workers against dangers of Page - 137. To ensure adequate preventive equipment
induction and awareness on the hazards involved and its mitigation are
Federal Law No.8 of employment accident , occupational hazards is given to protect the workers against the dangers of
1 Article 91 provided training and implementation of operational control procedures
the year 1980 which results from the use of machines and employment accidents and occupational diseases, fire
and risk management study. Mandatory PPE sign board is placed near the
other equipments hazards that may occur during work.
main entrance.
Compliance of all workforce to the Page - 140. It shall be unlawful for a worker to commit Complied - through risk assessment training, in house training, weekly
Federal Law No.8 of
3 instruction and orders respecting industrial Article 100 any act leading to non- compliance with such safety briefing etc and all workforce are instructed on safe use and
the year 1980
and personal safety precautions instruction , to the misuse of the equipment provided. handling of machines / equipment
11 ABE-HSE-F-037,Rev. 00
PROHIBITING DRINKING OF ALCOHOLIC BEVERAGES WITHIN THE ORGANIZATION
DISCIPLINARY RULES
Federal Law No.8 of Page 153 (d) , Termination of contracts of Complied . Monitored by HR department and controlled through the
8 Termination of Contract - Safety Violations Article 120
the year 1980 employment severance pay project and HSE department
Page 165 , The employer shall report specific Complied throughout the organization by adhering to the accident /
Federal Law No.8 of
9 Accident Reporting Article 142 accidents whining the schedule 1 and 2 to the authority incident reporting procedure which is described in the QHSE manual and
the year 1980
concerned project specific HSE plan
The Determination of retentive methods and measures for the Protection of workers from the risks of work - Ministerial order no (32) of 1982
12 ABE-HSE-F-037,Rev. 00
FIRST AID
Ministerial Order No. Complied : project have first aid box kits , valid and updated through
6 Contents of First Aid Box Article 4 (Table -3) Page 410
32 / 1982 the first ad log sheet
Ministerial Order No. Display of Safety Instructions/Signs for complied the same, with all safety warning boards installed wherever
12 Article 14 Page 395
32 / 1982 Machinery necessary
13 ABE-HSE-F-037,Rev. 00
NOTIFICATION OF INCIDENTS
MEDICAL CARE
Ministerial Order No. First Aid Box, Treatment facility and Employment of Nurse & Treatment facilities for more Page no. 413. Compliance : The projects have 4 trained first aiders for
18 Article 2 to 7
37/2 year 1984 Employment of Nurse than 200 employees initial treatment to employees
Ministerial Resolution Mid day break from 1230 hrs to 1500 hrs in the month On going : The project is observing the compulsory mid day breake as
19 working in under direct sunlight Article 1 to 11
410 year 2006 of July and sep. per the leagal order.
Application for Waste Discharge Permit to Application for waste discharge permits land, and On going . All waste discharge has been carried out by municipality
1 Fujariah Municipality Guideline no:1
sewer, Land and Marine Environment marine environment approved agenceis .
Complied During the startup formulated the site specific aspect impact
2 Fujariah Municipality Environmental Impact Assessment Guideline no:4 Requirement of local order 61/1991
study by the cleint and construction related EMP study is carreid out .
On going . All flammable and combustible materials are store as per the
4 Fujariah Municipality Industrial Compressed Gas Cylinders Guideline no:6 Storage of Oxygen and fuel gas - at least 6 meter legal requirements.The projects have identified area to store the
cylinders and secure them
Provide/take rest breaks, cool drinking water, Heat Complied. All employees are provided with adequate shelter and welfare
5 Fujariah Municipality Heat Stress at Work Guideline no:7
protective clothing, Medical facilities, facilities
On going. Permit to work system is followed for hot work, cold works&
6 Fujariah Municipality Entry into Confined Spaces Guideline no:8 Permit to work system
Confined space entry as and when required.
Provision of ELCB/ Earthing for electrical appliances. On going. Monthly electrical inspection is in progress within the office
7 Fujariah Municipality Electrical Safety at Work Guideline no:9
Lock out / Tag out system- Permit to work system premises and in the site permises.
Guards of moving parts, Tight clothing, No ring or Complied . All workforce and staffs are provided with adequate PPE and
8 Fujariah Municipality Guarding of Dangerous Machinery Guideline no:10 jewellery, Long hair, Periodic Maintenance of sufficient training on the hazards involved and its control measures
machine, Trained operator. through tool box talk, weekly safety meetings .
Personal Protective Equipment - Head Dubai occupational health and safety regulation Complied . All workforce and staffs are provided with adequate PPE at
9 Fujariah Municipality Guideline no:14
Protection require the employer to provide necessary PPE the time of joining .
Personal Protective Equipment - Eye and Dubai occupational health and safety regulation Complied . All workforce and staffs are provided with adequate PPE at
10 Fujariah Municipality Guideline no:15
Face Protection require the employer to provide necessary PPE the time of joining .
Personal Protective Equipment - Protective Dubai occupational health and safety regulation Complied . All workforce are provided with adequate PPE at the time of
12 Fujariah Municipality Guideline no:17
Clothing require the employer to provide necessary PPE joining-.
Personal Protective Equipment - Hand Dubai occupational health and safety regulation Complied . All workforce and staffs are provided with adequate PPE at
13 Fujariah Municipality Guideline no:18
Protection require the employer to provide necessary PPE the time of joining.
14 ABE-HSE-F-037,Rev. 00
Personal Protective Equipment - Foot Dubai occupational health and safety regulation Complied . All workforce and staffs are provided with adequate PPE at
14 Fujariah Municipality Guideline no:19
Protection require the employer to provide necessary PPE the time of joining.
Where persons are engaged in a workplace at a height Complied . All workforce who carry out these specific operations are
Personal Protective Equipment - Fall
15 Fujariah Municipality Guideline no:20 more than 3 meters and the work platform is not inducted and trained on the hazards involved within the process and its
Protection / Safety Lines
provided, the use of safety belt is essential also monitored .
MSDS Requirements, Medical examination once in a Complied. MSDS of all hazardous materials ae available at site store and
Safe Use of Industrial Organic Solvents /
16 Fujariah Municipality Guideline no:22 year, Fire fighting equipment, signs. Labeling of with EHS department. TTB is conducted to al regarding the hazardous
Chemicals
chemicals chemichals useed in the project.
20 Fujariah Municipality Safety in vehicle repair and servicing shops Guideline no :31 Requirement of local order 61/1991 No such activity at site
Inspection and testing of lifting equipments and Complied . All lifting equipment are tested by a approved 3rd party and
21 Fujariah Municipality Examination and Certification of Cranes, Hoists, Lifts
Guideline
and Other
no:41Lifting Appliances
appliances once in 12 months by competent person certificates are maintained and update in the respective FORM - 037
The guidelines specifies the minimum requirement for Complied- Storage tanks made for the construction purpose is provided
23 Fujariah Municipality Bunding of storage tanks Guideline no : 57
the bunding of tanks with bund protection and trays.
Complied. All workforce while joining have been provided with safety
Chapter 4 . Employer's compliance in protecting the
Article 38 inductions , which helps them to understand the hazard and risk involved
workforce
and the measures to tackle it
Workforce compliance in following the safety rules All work force are given induction and necessary awareness on following
Article 39
and regulations of the organization the safety rules, and the same is monitored through inspections, audits
Environment protection All machineries / equipment are inspected prior to issue. Monthly
3 Occupational health and safety regulations Each person who supplies the machines / equipment
regulation Article 40 inspection checklist to check the conditions for these tools / equipments
shall ensure that there is no danger to individuals
are implemented within the projects and adhered too.
15 ABE-HSE-F-037,Rev. 00
Complied . Detailed HSE responsibilities has been described in the
Article 44 Duties and responsibilities of safety representative
project HSE plan
The general safety and health provisions and duties of On going. This regulations is been complied with identifying the roles
Fujariah Municipality
1 General safety and health provisions Chapter 2 an employer , engineer, contractor and sub contractor - and responsibilities of all the personnel working in a project in the
Guidelines
Page 12 Project HSE plan and the company HSE manual
Fujariah Municipality Provision of warning and informing employees of Complied. The projects have installed adequate warning and sign boards
5 Signs , signals and barricades Chapter 6
Guidelines different hazards and any special precautions. Page 77 to educate and inform all workforce
Complied. All materials are stacked and stored in the designated area.
Fujariah Municipality All materials shall be stored and protected against
6 Material handling and storage Chaper 7 Aisles and walk ways are kept clear from hazards. Appropriate safe
Guidelines damages. Page 88
measures are complied within the project.
16 ABE-HSE-F-037,Rev. 00
Complied. All employees who are operating these tools on their daily
Fujariah Municipality The necessity of instructing employees, who use these
8 Hand and power operated tools Chapter 14 works , are instructed on safe use and handling through safety tool box
Guidelines tools in proper and safe us of tools. Page 182
talks and the equipment are inspected via monthly inspection check list
17 ABE-HSE-F-037,Rev. 00