You are on page 1of 3

1.

calculate the performance under certain set standard


Category Z value
Outperformer O 1.28 to 3
Above Expectation AE 0.525 to 1.28
Meet Expectation ME -0.525 to 0.525
Below Expectation BE -1.28 to -0.525
Unsatisfactory U -3 to -1.28

Bell curve : 1. PRICING SCORE


Rating Scores
Executives 𝑥 − 𝑥ҧ (𝑥 − 𝑥ҧ )2 Z values Gradings
(x)
S1 7 0.33 0.11 0.132 ME
S2 9 2.33 5.44 0.927 AE
S3 4 -2.67 7.11 -1.060 BE
Total 20 12.67
Average 6.67
SD 2.52

The interpretation from the above bell curve clearly indicates that Supplier S2 above
expectation in the "Pricing Score" attribute. S1 Score Meet Expectation and S3 Score
Below expectation
Commission
0.00
450000.00
0.00
1. calculate the performance under certain set standard
Category Z value
Outperformer O 1.28 to 3
Above Expectation AE 0.525 to 1.28
Meet Expectation ME -0.525 to 0.525
Below Expectation BE -1.28 to -0.525
Unsatisfactory U -3 to -1.28

Bell curve : 2. Quality Score


Executives Rating Scores (x) 𝑥 − 𝑥ҧ (𝑥 − 𝑥ҧ )2 Z values Gradings Commission
S1 9.5 1.43 2.05 0.953 AE 450000.00
S2 6.5 -1.57 2.45 -1.041 BE 0
S3 8.2 0.13 0.02 0.089 ME 0
Total 24.2 4.53
Average 8.07
SD 1.50

The interpretation from the above bell curve clearly indicates that Supplier S1 above
expectation in the "Quality Score" attribute. S3 Score Meet Expectation and S2 Score
Below expectation

In Consideration of Pricing and Quality Supplier 1 (S1) is much batter than other two
supplier.

You might also like