You are on page 1of 8

Functional Specification

Functional Specifications
For

National Highways Interconnectivity Improvement Project


(Loan No. 8301-IN)

<FICO – FI_E_07_Manual BRS Program>


< FI_E_07>

Page 0 of 9

EIT Services India Pvt.


Ltd
Functional Specification

Module Finance (FICO)

Process FI_E_07

Sub Process / No Process Ref


Description Manual BRS Program

Version
Current Version: V0

Date Last Updated: 03-08-2020


(dd/mm/yyyy)

Last Updated By: Pramod Arvapalli

Author: Pramod Arvapalli

Date Created: 03-08-2020


(dd/mm/yyyy)

Revision History
Version Date Updated Action* Name Summary of Major Changes
Number (dd/mm/yyyy) Made

0.1 03-08-2020 Author Pramod Initial document created.


Arvapalli

* Action Type: Author, Review, Approve

EIT Services India Pvt. Ltd Page 1 of 9


Functional Specification

Stakeholder’s Sign-off Status

Team Role Signature Date

Functional Consultant

HIGHBAR Team Lead


Team

Project Manager

DXC SME
DXC Team
Project Manager

Core Team Lead

MORTH Business Process Owner


Team

Project Manager

EIT Services India Pvt. Ltd Page 2 of 9


Functional Specification

Functional Specification
Format No/ Rev: FS-ABAP-001/ 00

Version: 00 Issue Date 03/08/2020


Specification No FS-FI-E-07 (dd/mm/yyyy):
BBP Refrence In Preparation Review
Development No TS-   -   -    (TS-XXX-YYY-999) Approved Released
(To be filled by Technical Department)

Revision History
Version Date Description of changes

00 03/08/2020 Initial Release

Responsible
For concept – MoRTH For Implementation – MoRTH
Section I: Justification
Area (R/3 FI Date 03/08/22020
Module): (dd/mm/yyyy):

Requested by:

Brief description: Report – Vendor Business Partner

Generic question:
1. Impact of not creating the Legal requirements will not be fulfilled
program:
Lack of information required for the business
Lose functionality compared to the old system
Others:

Is there any alternative in the standard Yes No


system:

Describe the alternative found:      

Reason why this alternative was not Performance problems Complexity


acceptable:
Others:      

(Explain in brief)

EIT Services India Pvt. Ltd Page 3 of 9


Functional Specification

Program type: Report Module Pool Interface


Enhancement Conversion Form
Application Development Others

Priority: High/mandatory Medium/recommended Low/optional

Charateristics Drill Down ALV Others

Frequency: Daily Weekly Monthly


Biweekly Other:      

Only for Interfaces:


Type of interface: Real-Time Batch
Direction of interface: Inbound Outbound Both

Sign off – Functional Specification


Prepared By Pramod Arvapalli Comments      
Date 03/08/2020
(DD.MM.YY)

Team Lead Lead Consultant


Date Date
Approved by Project Management Team   /  /    
(in case of Application development)
     

Received Team Lead/ Lead Consultant      


Date   /  /    

Section II: (a) Business Needs & Requirement ( Please use this section for describing
the business requirement in detail preferably with flow diagram )

Description and Purpose: For Clearing Bank Outgoing & Incoming GLs a simple program
required instead of manual BRS.

Section III: Only for module Pool


Screen Layout: (attach details of screen layout)

EIT Services India Pvt. Ltd Page 4 of 9


Functional Specification

1. Report Selection
Company Code:

2. Report Output
NA
3. Design Specification

Development Type Conversion


Module/Business Process FICO
Required T-Code ZFI_BRS

4. Overview

As per NHIDCL Business process required simplification in manual BRS process


instead of SAP standard.

5. Business Logic

Range of Bank GLs: 21500000 to 21599999

GL No. Ending with “0” – Main Bank


GL No. Ending with “1” – Receipts Bank
GL No. Ending with “2” – Payments Bank

Screen & Logic.xlsx

6. Overview Graphic

NA

7. Alternate Solutions

NA

EIT Services India Pvt. Ltd Page 5 of 9


Functional Specification

8. Selection Criteria

Screen Field Mapping:

9. Output Layout

10. Test Plan

11. Related Business Scenario and Business Transactions


Business Scenario/Business Transaction-

Target Test Date

12. Data Mapping (interface /Conversion)

NA

13. Legacy files Details

NA

14. Test Data

15. Backup / Recovery

NA

16. Audit / Control

NA

EIT Services India Pvt. Ltd Page 6 of 9


Functional Specification

17. Additional Information

NA

18. Issues, Assumptions, Risks, and Controls

Issu Description (Including mapping Resolution Status


e to underlying requirement(s)) (Open/Closed)
NA NA NA NA

19. Success Criteria


As per the test plan & test data execute the testing, then success result will come.

EIT Services India Pvt. Ltd Page 7 of 9

You might also like