You are on page 1of 7

End of year review 2019

End-of-year review submitted (Supervisor)


Employee name Pazhamalairajan Kaliyaperumal Employee number 182593
Designation Principal Engineer - Commissioning Grade 18
Supervisor(s) Mahesh Kulkarni Organisational unit Completions Engineering

Category and objective Due date % Weight Measurement / Self- comments


Plan assessme
nt rating
HSSE / Asset Integrity 15% 5 Employee comments:
Well followed all the PTW procedures for the safe startup of
plant with zero LTI. And sharing the knowledge was very useful
to achieve goal zero target.
Additional achievements (employee):
None
Supervisor comments:
Ensured HSSE compliance in all activities.
Supervisor 2 comments:
None
As an Area Authority, guiding the 12/30/2019 Achieving goal zero
team member for Safe execution (LTI/Accident/Incid
of activity with Proper plan & PTW; ent free)
Right focus to the activity, Risk and
control measures; Use of proper
tools; Toolbox talk; Close
supervision of job; Work
procedure, method of statement.
Ensuring safe Commissioning & 12/30/2019 With proper
Startup of wells and plant by units documents and
in a proper sequence with Right training achieving
planning, Right resource and well Zero LTI, No asset
coordination among other damge, No
disciplines/team for smooth deferment
execution of job.
Providing adequate information 12/30/2019 Assessment by
and training to the commissioning group discussion,
/ O & M team to result no harm to conducting
man power and Asset. frequent
knowledge sharing
sessions to confirm
the competency of
the person to
achieve goal zero
target.

Page 1 of 7 - This report is generated through the Learning Hub - v2.0


End of year review 2019
End-of-year review submitted (Supervisor)
Employee name Pazhamalairajan Kaliyaperumal Employee number 182593
Designation Principal Engineer - Commissioning Grade 18
Supervisor(s) Mahesh Kulkarni Organisational unit Completions Engineering

Operational / Project Delivery 40% 5 Employee comments:


Doing a very good roll in operation support after a successful
and timely execution of commissioning and startup activities
with flawless completion.
Additional achievements (employee):
Right time highlight and interface coordination between vendor
and Engineering has been yeilded with timely completion of
project and brining the unit into operation.
Supervisor comments:
Very well executed assignments. Exhibited good competency in
managing the issues.
Supervisor 2 comments:
None
Observing and verifying the status  12/30/2019 Proper Completion
of Ready for Commissioning of activity through
(RFOC) and Ready for Startup completion records
(RFSU) in CCMS-Zenator records, and punch item,
and preparing / executing the Gas- complying with
in and start-up activities. design to achieve
the target of
Flawless startup of
the unit/plant and
avoiding delay in
project
completion.
Executing the Commissioning and 12/30/2019 Detailed
startup of units/plant in an commissioning
efficient, safe way with minimum &startup
time period. Procedures /
Method of
Statement,
Marked
updrawings,
Completion of MC,
PC, RFOC/RFSU. No
"A" category
punchitems.
Agreement on
remaining "B"
category punch
item and
exceptions.
Vendors& First fills
availability as per
the schedule. The
above ensurence
will make
achievement of
smooth and
efficient
commisioning /star

Page 2 of 7 - This report is generated through the Learning Hub - v2.0


End of year review 2019
End-of-year review submitted (Supervisor)
Employee name Pazhamalairajan Kaliyaperumal Employee number 182593
Designation Principal Engineer - Commissioning Grade 18
Supervisor(s) Mahesh Kulkarni Organisational unit Completions Engineering

Interface coordination with 12/30/2019 Completion


Design/Engineering,Construction, progress of Site
Pre-commissioning and Operation. queries, punch
items, Exceptions
and ITRs, Frequent
meetings. The
above
measurement will
ensure the target
achievement of
smooth
commissioning and
startup of
unit/plant in an
better
environment.
Supporting client Operation and 12/30/2019 On time support
maintenance team. for efficient startup
and operation of
the plant.
Capability 30% 5 Employee comments:
All the objectives were well executed / achieved with right
procedure followup, and guidining the team at right time.
Supporting O&M team for smooth operation of units and
troubleshooting is going well.
Additional achievements (employee):
Interface coordination, vendor followup for issues and material,
coordination with O&M team, etc.,
Supervisor comments:
Exhibited good competency in managing the issue. Exhibited
good professionalism.
Supervisor 2 comments:
None
Leading the team and activity, and 12/30/2019 Observing
providing the guidance to the team competency of a
to perform the commissioning and person and
startup activities in an sequential assigning the right
and safe mannar. job accordingly,
Ensuring theother
requirements to
carryout the
activity like vendor
presence, tools,
first fill chemicals
and
oil/grease.Complyi
ng with System
Completion
procedures. By
ensuring the
above, achieving
the target of
successful
commissioning and
startup.

Page 3 of 7 - This report is generated through the Learning Hub - v2.0


End of year review 2019
End-of-year review submitted (Supervisor)
Employee name Pazhamalairajan Kaliyaperumal Employee number 182593
Designation Principal Engineer - Commissioning Grade 18
Supervisor(s) Mahesh Kulkarni Organisational unit Completions Engineering

Healthy interface coordination 12/30/2019 On-time work


with Design/Engineering, progress/completi
Construction, Pre-commissioning on. On-time
and Operation. project
completion.
Preparing and reviewing 12/30/2019 Complying with
commissioning & Startup design, System
procedures, and other completion
related/required commissioning procedure and
documents. client referance
document PR-
1159, SP-2051, etc.
Supporting client Operation and 12/30/2019 On time support
maintenance team. for efficient startup
and operation of
the plant.
Strategy / Growth 15% 5 Employee comments:
All activities were completed prior to the schedule with right
strategy. As part of O&M team, trouble shooting and smooth
operation in progress with right strategy.
Additional achievements (employee):
None
Supervisor comments:
very well supported project in meeting project targets.
Supervisor 2 comments:
None
Right way commissioning/Startup 12/30/2019 Efficient
in reduced time by using advanced commissioning/sta
technologies and conducting brain rtup prior to the
storm meetings. scheduled date.
Trimmed down and compact 12/30/2019 Successful
schedule for engagingthe vendors completion of
and minimizing the number of activity prior to
vendors engagement by utilizing scheduled date.
the CSU resource efficiently.
Total scorecard 100%

Supervisor comments:
Successfully performed assignments. Efforts provided in meeting the project targets are really appreciable.. Job well done.
Supervisor 2 comments:
None

Page 4 of 7 - This report is generated through the Learning Hub - v2.0


End of year review 2019
End-of-year review submitted (Supervisor)
Employee name Pazhamalairajan Kaliyaperumal Employee number 182593
Designation Principal Engineer - Commissioning Grade 18
Supervisor(s) Mahesh Kulkarni Organisational unit Completions Engineering

Values Self- Comments


assessmen
t rating
Safe 5 Employee comments:
Client's expectations are fulfilled and satisfied at performance.
Definition: Safety is our first and our most important value; from
our people, clients and the communities we work in, to the
integrity of the assets and facilities we build, maintain and run.

Behaviour: Shares feedback beyond direct team on safe and


unsafe behaviours so colleagues are always consciously making
the right choices
Ethical 5 Employee comments:
Client's is satisfied at ethical behaviour and performance.
Definition: We aspire to the highest standards of ethical
behaviour. This means doing the right thing for our clients,
employees, communities and the environment in which we
operate.

Behaviour: Involves the team in discussing ethical issues and


shaping a plan of action that benefits everyone – including
customers and communities
Innovative 5 Employee comments:
Client's is satisfied at providing solution for the problems in a
right and technical way.
Definition: It’s in our nature to think differently, use our initiative
and proactively challenge convention. From the commercial, to
the technical, we seek out new ways to add value.

Behaviour: Encourages teams to experiment on a small scale,


learn what works and doesn’t, before scaling - up
Responsive 5 Employee comments:
Client's expectations are fulfilled and satisfied at performance.
Definition: We take time to understand what our clients want and
tailor our services to meet those needs. We are quick to respond
when challenges arise and do everything in our power to
overcome them.

Behaviour: Identifies potential issues early; resolves challenges


before they escalate
Quality & cost conscious 5 Employee comments:
Client's expectations are fulfilled and satisfied at performance.
Definition: We work to optimise value for our customers without
compromising quality and integrity

Behaviour: Sets stretch goals with teams; continually doing more


with less to reduce cost or improve quality

Page 5 of 7 - This report is generated through the Learning Hub - v2.0


End of year review 2019
End-of-year review submitted (Supervisor)
Employee name Pazhamalairajan Kaliyaperumal Employee number 182593
Designation Principal Engineer - Commissioning Grade 18
Supervisor(s) Mahesh Kulkarni Organisational unit Completions Engineering

Driven to deliver 5 Employee comments:


Client's expectations are fulfilled and satisfied at performance.
Definition: We have a relentless focus on delivery and exceeding
our clients’ expectations.

Behaviour: Offers suggestions and demonstrates ways to make a


bigger impact - consistently exceeding customer expectations;
listens and supports others’ ideas

Supervisor comment for values:


Demonstrated a cooperative and collaborative approach in dealing with issues. Self motivated and highly productive. Highly responsive and
dedicated. Fully dependable.

Supervisor 2 comment for values:


None

Page 6 of 7 - This report is generated through the Learning Hub - v2.0


End of year review 2019
End-of-year review submitted (Supervisor)
Employee name Pazhamalairajan Kaliyaperumal Employee number 182593
Designation Principal Engineer - Commissioning Grade 18
Supervisor(s) Mahesh Kulkarni Organisational unit Completions Engineering

Overall supervisor comment:


Overall very good performance.
Executed assignments with responsibility in a safe manner. Highly responsive and dedicated.
Very well supported project in meeting the targets.
Exhibited himself as a competent & highly productive and fully motivated engineer. Efforts in managing the work is highly appreciable.
Recommended for a good reward.
Overall supervisor 2 comment:
None

EOYR current status:


End-of-year review submitted (Supervisor)

EOYR rating
Yet to be released

Page 7 of 7 - This report is generated through the Learning Hub - v2.0