Employee name Pazhamalairajan Kaliyaperumal Employee number 182593 Designation Principal Engineer - Commissioning Grade 18 Supervisor(s) Mahesh Kulkarni Organisational unit Completions Engineering
Category and objective Due date % Weight Measurement / Self- comments
Plan assessme nt rating HSSE / Asset Integrity 15% 5 Employee comments: Well followed all the PTW procedures for the safe startup of plant with zero LTI. And sharing the knowledge was very useful to achieve goal zero target. Additional achievements (employee): None Supervisor comments: Ensured HSSE compliance in all activities. Supervisor 2 comments: None As an Area Authority, guiding the 12/30/2019 Achieving goal zero team member for Safe execution (LTI/Accident/Incid of activity with Proper plan & PTW; ent free) Right focus to the activity, Risk and control measures; Use of proper tools; Toolbox talk; Close supervision of job; Work procedure, method of statement. Ensuring safe Commissioning & 12/30/2019 With proper Startup of wells and plant by units documents and in a proper sequence with Right training achieving planning, Right resource and well Zero LTI, No asset coordination among other damge, No disciplines/team for smooth deferment execution of job. Providing adequate information 12/30/2019 Assessment by and training to the commissioning group discussion, / O & M team to result no harm to conducting man power and Asset. frequent knowledge sharing sessions to confirm the competency of the person to achieve goal zero target.
Page 1 of 7 - This report is generated through the Learning Hub - v2.0
End of year review 2019 End-of-year review submitted (Supervisor) Employee name Pazhamalairajan Kaliyaperumal Employee number 182593 Designation Principal Engineer - Commissioning Grade 18 Supervisor(s) Mahesh Kulkarni Organisational unit Completions Engineering
Doing a very good roll in operation support after a successful and timely execution of commissioning and startup activities with flawless completion. Additional achievements (employee): Right time highlight and interface coordination between vendor and Engineering has been yeilded with timely completion of project and brining the unit into operation. Supervisor comments: Very well executed assignments. Exhibited good competency in managing the issues. Supervisor 2 comments: None Observing and verifying the status 12/30/2019 Proper Completion of Ready for Commissioning of activity through (RFOC) and Ready for Startup completion records (RFSU) in CCMS-Zenator records, and punch item, and preparing / executing the Gas- complying with in and start-up activities. design to achieve the target of Flawless startup of the unit/plant and avoiding delay in project completion. Executing the Commissioning and 12/30/2019 Detailed startup of units/plant in an commissioning efficient, safe way with minimum &startup time period. Procedures / Method of Statement, Marked updrawings, Completion of MC, PC, RFOC/RFSU. No "A" category punchitems. Agreement on remaining "B" category punch item and exceptions. Vendors& First fills availability as per the schedule. The above ensurence will make achievement of smooth and efficient commisioning /star
Page 2 of 7 - This report is generated through the Learning Hub - v2.0
End of year review 2019 End-of-year review submitted (Supervisor) Employee name Pazhamalairajan Kaliyaperumal Employee number 182593 Designation Principal Engineer - Commissioning Grade 18 Supervisor(s) Mahesh Kulkarni Organisational unit Completions Engineering
Interface coordination with 12/30/2019 Completion
Design/Engineering,Construction, progress of Site Pre-commissioning and Operation. queries, punch items, Exceptions and ITRs, Frequent meetings. The above measurement will ensure the target achievement of smooth commissioning and startup of unit/plant in an better environment. Supporting client Operation and 12/30/2019 On time support maintenance team. for efficient startup and operation of the plant. Capability 30% 5 Employee comments: All the objectives were well executed / achieved with right procedure followup, and guidining the team at right time. Supporting O&M team for smooth operation of units and troubleshooting is going well. Additional achievements (employee): Interface coordination, vendor followup for issues and material, coordination with O&M team, etc., Supervisor comments: Exhibited good competency in managing the issue. Exhibited good professionalism. Supervisor 2 comments: None Leading the team and activity, and 12/30/2019 Observing providing the guidance to the team competency of a to perform the commissioning and person and startup activities in an sequential assigning the right and safe mannar. job accordingly, Ensuring theother requirements to carryout the activity like vendor presence, tools, first fill chemicals and oil/grease.Complyi ng with System Completion procedures. By ensuring the above, achieving the target of successful commissioning and startup.
Page 3 of 7 - This report is generated through the Learning Hub - v2.0
End of year review 2019 End-of-year review submitted (Supervisor) Employee name Pazhamalairajan Kaliyaperumal Employee number 182593 Designation Principal Engineer - Commissioning Grade 18 Supervisor(s) Mahesh Kulkarni Organisational unit Completions Engineering
Healthy interface coordination 12/30/2019 On-time work
with Design/Engineering, progress/completi Construction, Pre-commissioning on. On-time and Operation. project completion. Preparing and reviewing 12/30/2019 Complying with commissioning & Startup design, System procedures, and other completion related/required commissioning procedure and documents. client referance document PR- 1159, SP-2051, etc. Supporting client Operation and 12/30/2019 On time support maintenance team. for efficient startup and operation of the plant. Strategy / Growth 15% 5 Employee comments: All activities were completed prior to the schedule with right strategy. As part of O&M team, trouble shooting and smooth operation in progress with right strategy. Additional achievements (employee): None Supervisor comments: very well supported project in meeting project targets. Supervisor 2 comments: None Right way commissioning/Startup 12/30/2019 Efficient in reduced time by using advanced commissioning/sta technologies and conducting brain rtup prior to the storm meetings. scheduled date. Trimmed down and compact 12/30/2019 Successful schedule for engagingthe vendors completion of and minimizing the number of activity prior to vendors engagement by utilizing scheduled date. the CSU resource efficiently. Total scorecard 100%
Supervisor comments: Successfully performed assignments. Efforts provided in meeting the project targets are really appreciable.. Job well done. Supervisor 2 comments: None
Page 4 of 7 - This report is generated through the Learning Hub - v2.0
End of year review 2019 End-of-year review submitted (Supervisor) Employee name Pazhamalairajan Kaliyaperumal Employee number 182593 Designation Principal Engineer - Commissioning Grade 18 Supervisor(s) Mahesh Kulkarni Organisational unit Completions Engineering
Values Self- Comments
assessmen t rating Safe 5 Employee comments: Client's expectations are fulfilled and satisfied at performance. Definition: Safety is our first and our most important value; from our people, clients and the communities we work in, to the integrity of the assets and facilities we build, maintain and run.
Behaviour: Shares feedback beyond direct team on safe and
unsafe behaviours so colleagues are always consciously making the right choices Ethical 5 Employee comments: Client's is satisfied at ethical behaviour and performance. Definition: We aspire to the highest standards of ethical behaviour. This means doing the right thing for our clients, employees, communities and the environment in which we operate.
Behaviour: Involves the team in discussing ethical issues and
shaping a plan of action that benefits everyone – including customers and communities Innovative 5 Employee comments: Client's is satisfied at providing solution for the problems in a right and technical way. Definition: It’s in our nature to think differently, use our initiative and proactively challenge convention. From the commercial, to the technical, we seek out new ways to add value.
Behaviour: Encourages teams to experiment on a small scale,
learn what works and doesn’t, before scaling - up Responsive 5 Employee comments: Client's expectations are fulfilled and satisfied at performance. Definition: We take time to understand what our clients want and tailor our services to meet those needs. We are quick to respond when challenges arise and do everything in our power to overcome them.
before they escalate Quality & cost conscious 5 Employee comments: Client's expectations are fulfilled and satisfied at performance. Definition: We work to optimise value for our customers without compromising quality and integrity
Behaviour: Sets stretch goals with teams; continually doing more
with less to reduce cost or improve quality
Page 5 of 7 - This report is generated through the Learning Hub - v2.0
End of year review 2019 End-of-year review submitted (Supervisor) Employee name Pazhamalairajan Kaliyaperumal Employee number 182593 Designation Principal Engineer - Commissioning Grade 18 Supervisor(s) Mahesh Kulkarni Organisational unit Completions Engineering
Driven to deliver 5 Employee comments:
Client's expectations are fulfilled and satisfied at performance. Definition: We have a relentless focus on delivery and exceeding our clients’ expectations.
Behaviour: Offers suggestions and demonstrates ways to make a
Demonstrated a cooperative and collaborative approach in dealing with issues. Self motivated and highly productive. Highly responsive and dedicated. Fully dependable.
Supervisor 2 comment for values:
None
Page 6 of 7 - This report is generated through the Learning Hub - v2.0
End of year review 2019 End-of-year review submitted (Supervisor) Employee name Pazhamalairajan Kaliyaperumal Employee number 182593 Designation Principal Engineer - Commissioning Grade 18 Supervisor(s) Mahesh Kulkarni Organisational unit Completions Engineering
Overall supervisor comment:
Overall very good performance. Executed assignments with responsibility in a safe manner. Highly responsive and dedicated. Very well supported project in meeting the targets. Exhibited himself as a competent & highly productive and fully motivated engineer. Efforts in managing the work is highly appreciable. Recommended for a good reward. Overall supervisor 2 comment: None
EOYR current status:
End-of-year review submitted (Supervisor)