You are on page 1of 14

Page 1 of 14 FORM OF TENDER

SCHEDULE 1-1

BREAKDOWN OF TOTAL LUMP SUM


ADDITION AND ALTERATION WORKS TO CAR PARKS (C5)

S/N Descriptions Amount

(1) CAR PARK NO. A48 AT BLOCK 571/573 ANG MO KIO ST 51

(a) The whole of the car park addition and alteration works including the demolition of existing lots and replacement with cast in situ
concrete slab parking lots and all related works as shown in the drawings

(i) Demolition works including hacking, removal and disposal … $ -

(ii) Reconstruction of driveway road base, sub-base, patching / laying of asphalt premix to required level … $ -

(iii) Construction of car lots / motorcycles lots / tree lots / no parking lots / handicap lots to required level … $ -

(iv) Painting of car / motorcycle / no parking / handicap parking lots marking, numberings and all necessary road markings … $ -

(v) Reconstruction of kerbs, foundation, bollards, footpaths, ramps, humps … $ -

(vi) All necessary reinstatement works of the green turfing according to NParks' requirement … $ -

(b) The whole of the removal and reconstruction of partial drain walls, drain top slab, drain cover/grating, concrete benching, PC … $ -
channels and all related works to required level as shown in the drawings.

(c) The whole of the supply and installation of lamp posts including testing and commissioning of new lamp posts (flange mounted
type) and cables and all related works as shown in the drawings:

(i) Installation of illuminated season lots signboards including electrical supply … $ -

(ii) All new LED light fittings cum mounting brackets … $ -

(iii) Lighting columns flanged mounted (j-bolt type) including stainless steel cap … $ -

(iv) Cabling works (including all the electrical accessories) from distribution boxes to all the car park lighting … $ -

(v) Opening account and setting up separate meter and other related electrical accessories in the switch room … $ -

(vi) Existing street and car park lighting columns, landscaping lighting and cables to be removed including reinstatement … $ -
works and restoring supply to those existing lighting columns/car park signages etc that are not affected by the car park
works.

(vii) All charges payable to Town Council and relevant authorities for the electrical connections to switch rooms, testing and … $ -
related works.

(d) Provision of earth control measures including treatment plant and maintain them as advised by the QECP. … $ -

(e) The provision of setting out and as-built survey drawings by Contractor for the completed car park works. … $ -

(f) The engagement of Arborist for the proper advice of trimming of tree roots/branches, identification of unhealthy or unstable trees … $ -
to be replaced with approved type and the preparation of Arborist report for the certification of all trees are of good health and
stability. (Before and after construction work)

(g) Miscellaneous works such as signages for handicap, traffic signs including posts, etc as shown in the drawings. … $ -

SUB TOTAL FOR (1) TRANSFERRED TO TOTAL LUMP SUM BREAKDOWN … $ -

AANNEX B Works to Carparks (Contract 5)_FOT_Annex B


Page 2 of 14 FORM OF TENDER
SCHEDULE 1-2

BREAKDOWN OF TOTAL LUMP SUM


ADDITION AND ALTERATION WORKS TO CAR PARKS (C5)

S/N Descriptions Amount

(2) CAR PARK NO. A64 BLOCK 584/586 ANG MO KIO ST 51

(a) The whole of the car park addition and alteration works including the demolition of existing lots and replacement with cast in situ
concrete slab parking lots and all related works as shown in the drawings

(i) Demolition works including hacking, removal and disposal … $ -

(ii) Construction of driveway road base, sub-base, patching / laying of asphalt premix to required level … $ -

(iii) Reconstruction of driveway road base, sub-base, patching / laying of asphalt premix to required level … $ -

(iv) Construction of car lots / motorcycles lots / tree lots / no parking lots / handicap lots to required level … $ -

(v) Painting of car / motorcycle / no parking / handicap parking lots marking, numberings and all necessary road markings … $ -

(vi) Reconstruction of kerbs, foundation, bollards, footpaths, ramps, humps … $ -

(vii) All necessary reinstatement works of the green turfing according to NParks' requirement … $ -

(viii) Installation of wheel stoppers at selected parking lots … $ -

(b) The whole of the removal and reconstruction of partial drain walls, drain top slab, drain cover/grating, concrete benching, PC … $ -
channels and all related works to required level as shown in the drawings.

(c) The whole of the supply and installation of lamp posts including testing and commissioning of new lamp posts (flange mounted
type) and cables and all related works as shown in the drawings:

(i) Installation of illuminated season lots signboards including electrical supply … $ -

(ii) All new LED light fittings cum mounting brackets … $ -

(iii) Lighting columns flanged mounted (j-bolt type) including stainless steel cap … $ -

(iv) Cabling works (including all the electrical accessories) from distribution boxes to all the car park lighting … $ -

(v) Opening account and setting up separate meter and other related electrical accessories in the switch room … $ -

(vi) Existing street and car park lighting columns, landscaping lighting and cables to be removed including reinstatement … $ -
works and restoring supply to those existing lighting columns/car park signages etc that are not affected by the car park
works.

(vii) All charges payable to Town Council and relevant authorities for the electrical connections to switch rooms, testing and … $ -
related works.

(d) Provision of earth control measures including treatment plant and maintain them as advised by the QECP. … $ -

(e) The provision of setting out and as-built survey drawings by Contractor for the completed car park works. … $ -

(f) The engagement of Arborist for the proper advice of trimming of tree roots/branches, identification of unhealthy or unstable trees … $ -
to be replaced with approved type and the preparation of Arborist report for the certification of all trees are of good health and
stability. (Before and after construction works)

(g) Miscellaneous works such as signages for handicap, traffic signs including posts, etc as shown in the drawings. … $ -

SUB TOTAL FOR (2) TRANSFERRED TO TOTAL LUMP SUM BREAKDOWN … $ -

AANNEX B Works to Carparks (Contract 5)_FOT_Annex B


Page 3 of 14 FORM OF TENDER
SCHEDULE 1-3

BREAKDOWN OF TOTAL LUMP SUM


ADDITION AND ALTERATION WORKS TO CAR PARKS (C5)

S/N Descriptions Amount

(3) CAR PARK NO. BE16, BISHAN PARK 1

(a) The whole of the car park addition and alteration works including the demolition of existing lots and replacement with cast in situ
concrete slab parking lots and all related works as shown in the drawings

(i) Demolition works including hacking, removal and disposal … $ -

(ii) Reconstruction of driveway road base, sub-base, patching / laying of asphalt premix to required level … $ -

(iii) Construction of car lots / motorcycles lots / tree lots / no parking lots / handicap lots to required level … $ -

(iv) Painting of car / motorcycle / no parking / handicap parking lots marking, numberings and all necessary road markings … $ -

(v) Reconstruction of kerbs, foundation, bollards, footpaths, ramps, humps … $ -

(vi) All necessary reinstatement works of the green turfing according to NParks' requirement … $ -

(vii) Installation of wheel stoppers at selected parking lots … $ -

(viii) Reconstruction of retaining wall … $ -

(b) The whole of the removal and reconstruction of partial drain walls, drain top slab, drain cover/grating, concrete benching, PC … $ -
channels and all related works to required level as shown in the drawings.

(c) The whole of the supply and installation of lamp posts including testing and commissioning of new lamp posts (flange mounted
type) and cables and all related works as shown in the drawings:

(i) Installation of illuminated season lots signboards including electrical supply … $ -

(ii) All new LED light fittings cum mounting brackets … $ -

(iii) Lighting columns flanged mounted (j-bolt type) including stainless steel cap … $ -

(iv) Cabling works (including all the electrical accessories) from distribution boxes to all the car park lighting … $ -

(v) Opening account and setting up separate meter and other related electrical accessories in the switch room … $ -

(vi) Existing street and car park lighting columns, landscaping lighting and cables to be removed including reinstatement … $ -
works and restoring supply to those existing lighting columns/car park signages etc that are not affected by the car park
works.

(vii) All charges payable to Town Council and relevant authorities for the electrical connections to switch rooms, testing and … $ -
related works.

(d) Provision of earth control measures including treatment plant and maintain them as advised by the QECP. … $ -

(e) The provision of setting out and as-built survey drawings by Contractor for the completed car park works. … $ -

(f) The engagement of Arborist for the proper advice of trimming of tree roots/branches, identification of unhealthy or unstable trees … $ -
to be replaced with approved type and the preparation of Arborist report for the certification of all trees are of good health and
stability. (Before and after construction works)

(g) Miscellaneous works such as signages for handicap, traffic signs including posts, etc as shown in the drawings. … $ -

SUB TOTAL FOR (3) TRANSFERRED TO TOTAL LUMP SUM BREAKDOWN … $ -

AANNEX B Works to Carparks (Contract 5)_FOT_Annex B


Page 4 of 14 FORM OF TENDER
SCHEDULE 1-4

BREAKDOWN OF TOTAL LUMP SUM


ADDITION AND ALTERATION WORKS TO CAR PARKS (C5)

S/N Descriptions Amount

(4) CAR PARK NO. BE19, BLOCK 503/504 BISHAN ST 11

(a) The whole of the car park addition and alteration works including the demolition of existing lots and replacement with cast in situ
concrete slab parking lots and all related works as shown in the drawings

(i) Demolition works including hacking, removal and disposal … $ -

(ii) Reconstruction of driveway road base, sub-base, patching / laying of asphalt premix to required level … $ -

(iii) Construction of car lots / motorcycles lots / tree lots / no parking lots / handicap lots to required level
… $ -
(iv) Painting of car / motorcycle / no parking / handicap parking lots marking, numberings and all necessary road markings

… $ -
(v) Reconstruction of kerbs, foundation, bollards, footpaths, ramps, humps

(vi) All necessary reinstatement works of the green turfing according to NParks' requirement … $ -

(vii) Installation of wheel stoppers at selected parking lots … $ -

(viii) Reconstruction of rigid pavement at the access of Electrical Substation and reinstatement of bollards and steel chain … $ -

(b) The whole of the removal and reconstruction of partial drain walls, drain top slab, drain cover/grating, concrete benching, PC … $ -
channels and all related works to required level as shown in the drawings.

(c) The whole of the supply and installation of lamp posts including testing and commissioning of new lamp posts (flange mounted
type) and cables and all related works as shown in the drawings:

(i) Installation of illuminated season lots signboards including electrical supply … $ -

(ii) All new LED light fittings cum mounting brackets … $ -

(iii) Lighting columns flanged mounted (j-bolt type) including stainless steel cap … $ -

(iv) Cabling works (including all the electrical accessories) from distribution boxes to all the car park lighting … $ -

(v) Opening account and setting up separate meter and other related electrical accessories in the switch room … $ -

(vi) Existing street and car park lighting columns, landscaping lighting and cables to be removed including reinstatement … $ -
works and restoring supply to those existing lighting columns/car park signages etc that are not affected by the car park
works.

(vii) All charges payable to Town Council and relevant authorities for the electrical connections to switch rooms, testing and … $ -
related works.

(d) Provision of earth control measures including treatment plant and maintain them as advised by the QECP. … $ -

(e) The provision of setting out and as-built survey drawings by Contractor for the completed car park works. … $ -

(f) The engagement of Arborist for the proper advice of trimming of tree roots/branches, identification of unhealthy or unstable trees … $ -
to be replaced with approved type and the preparation of Arborist report for the certification of all trees are of good health and
stability. (Before and after construction works)

(g) Miscellaneous works such as signages for handicap, traffic signs including posts, etc as shown in the drawings. … $ -

SUB TOTAL FOR (4) TRANSFERRED TO TOTAL LUMP SUM BREAKDOWN … $ -

AANNEX B Works to Carparks (Contract 5)_FOT_Annex B


Page 5 of 14 FORM OF TENDER
SCHEDULE 1-5

BREAKDOWN OF TOTAL LUMP SUM


ADDITION AND ALTERATION WORKS TO CAR PARKS (C5)

S/N Descriptions Amount

(5) CAR PARK NO. BE21, BLOCK 506/509 BISHAN ST 11

(a) The whole of the car park addition and alteration works including the demolition of existing lots and replacement with cast in situ
concrete slab parking lots and all related works as shown in the drawings

(i) Demolition works including hacking, removal and disposal … $ -

(ii) Reconstruction of driveway road base, sub-base, patching / laying of asphalt premix to required level … $ -

(iii) Construction of car lots / motorcycles lots / tree lots / no parking lots / handicap lots to required level … $ -

(iv) Painting of car / motorcycle / no parking / handicap parking lots marking, numberings and all necessary road markings … $ -

(v) Reconstruction of kerbs, foundation, bollards, footpaths, ramps, humps … $ -

(vi) Tree planting and all necessary reinstatement works of the green turfing according to NParks' requirement … $ -

(b) The whole of the removal and reconstruction of partial drain walls, drain top slab, drain cover/grating, concrete benching, PC … $ -
channels and all related works to required level as shown in the drawings.

(c) The whole of the supply and installation of lamp posts including testing and commissioning of new lamp posts (flange mounted
type) and cables and all related works as shown in the drawings:

(i) Installation of illuminated season lots signboards including electrical supply … $ -

(ii) All new LED light fittings cum mounting brackets … $ -

(iii) Lighting columns flanged mounted (j-bolt type) including stainless steel cap … $ -

(iv) Cabling works (including all the electrical accessories) from distribution boxes to all the car park lighting … $ -

(v) Opening account and setting up separate meter and other related electrical accessories in the switch room … $ -

(vi) Existing street and car park lighting columns, landscaping lighting and cables to be removed including reinstatement … $ -
works and restoring supply to those existing lighting columns/car park signages etc that are not affected by the car park
works.

(vii) All charges payable to Town Council and relevant authorities for the electrical connections to switch rooms, testing and … $ -
related works.

(d) Provision of earth control measures including treatment plant and maintain them as advised by the QECP. … $ -

(e) The provision of setting out and as-built survey drawings by Contractor for the completed car park works. … $ -

(f) The engagement of Arborist for the proper advice of trimming of tree roots/branches, identification of unhealthy or unstable trees … $ -
to be replaced with approved type and the preparation of Arborist report for the certification of all trees are of good health and
stability. (Before and after construction works)

(g) Miscellaneous works such as signages for handicap, traffic signs including posts, etc as shown in the drawings. … $ -

SUB TOTAL FOR (5) TRANSFERRED TO TOTAL LUMP SUM BREAKDOWN … $ -

AANNEX B Works to Carparks (Contract 5)_FOT_Annex B


Page 6 of 14
FORM OF TENDER
SCHEDULE 1-6

BREAKDOWN OF TOTAL LUMP SUM


ADDITION AND ALTERATION WORKS TO CAR PARKS (C5)

S/N Descriptions Amount

(6) CAR PARK NO. BE22, BLOCK 511/513 BISHAN ST 11

(a) The whole of the car park addition and alteration works including the demolition of existing lots and replacement with cast in situ
concrete slab parking lots and all related works as shown in the drawings

(i) Demolition works including hacking, removal and disposal … $ -

(ii) Reconstruction of driveway road base, sub-base, patching / laying of asphalt premix to required level … $ -

(iii) Construction of car lots / motorcycles lots / tree lots / no parking lots / handicap lots to required level … $ -

(iv) Painting of car / motorcycle / no parking / handicap parking lots marking, numberings and all necessary road markings … $ -

(v) Reconstruction of kerbs, foundation, bollards, footpaths, ramps, humps … $ -

(vi) All necessary reinstatement works of the green turfing according to NParks' requirement … $ -

(vii) Reconstruction of rigid pavement at loading and unloading bay to required level … $ -

(b) The whole of the removal and reconstruction of partial drain walls, drain top slab, drain cover/grating, concrete benching, PC … $ -
channels and all related works to required level as shown in the drawings.

(c) The whole of the supply and installation of lamp posts including testing and commissioning of new lamp posts (flange mounted
type) and cables and all related works as shown in the drawings:

(i) All new LED light fittings cum mounting brackets … $ -

(ii) Lighting columns flanged mounted (j-bolt type) including stainless steel cap … $ -

(iii) Cabling works (including all the electrical accessories) from distribution boxes to all the car park lighting … $ -

(iv) Opening account and setting up separate meter and other related electrical accessories in the switch room … $ -

(v) Existing street and car park lighting columns, landscaping lighting and cables to be removed including reinstatement … $ -
works and restoring supply to those existing lighting columns/car park signages etc that are not affected by the car park
works.

(vi) All charges payable to Town Council and relevant authorities for the electrical connections to switch rooms, testing and … $ -
related works.

(d) Provision of earth control measures including treatment plant and maintain them as advised by the QECP. … $ -

(e) The provision of setting out and as-built survey drawings by Contractor for the completed car park works. … $ -

(f) The engagement of Arborist for the proper advice of trimming of tree roots/branches, identification of unhealthy or unstable trees … $ -
to be replaced with approved type and the preparation of Arborist report for the certification of all trees are of good health and
stability. (Before and after construction works)

(g) Miscellaneous works such as signages for handicap, loading/unloading bay, traffic signs including posts, etc as shown in the … $ -
drawings.

SUB TOTAL FOR (6) TRANSFERRED TO TOTAL LUMP SUM BREAKDOWN … $ -

AANNEX B Works to Carparks (Contract 5)_FOT_Annex B


Page 7 of 14
FORM OF TENDER
SCHEDULE 1-7

BREAKDOWN OF TOTAL LUMP SUM


ADDITION AND ALTERATION WORKS TO CAR PARKS (C5)

S/N Descriptions Amount

(7) CAR PARK NO. BR18, BLOCK 111A ST MICHAEL BUS TERMINAL

(a) The whole of the car park addition and alteration works including the demolition of existing lots and replacement with cast in situ
concrete slab parking lots and all related works as shown in the drawings

(i) Demolition works including hacking, removal and disposal … $ -

(ii) Reconstruction of driveway road base, sub-base, patching / laying of asphalt premix to required level … $ -

(iii) Construction of car lots / motorcycles lots / tree lots / no parking lots / handicap lots to required level … $ -

(iv) Painting of car / motorcycle / no parking / handicap parking lots marking, numberings and all necessary road markings … $ -

(v) Reconstruction of kerbs, foundation, bollards, footpaths, ramps, humps … $ -

(vi) Contractor to engage PE and service provider to raise up the oil and grease trap to required level … $ -

(vii) Reconstruction apron slab to match required level … $ -

(b) The whole of the removal and reconstruction of partial drain walls, drain top slab, drain cover/grating, concrete benching, PC … $ -
channels and all related works to required level as shown in the drawings.

(c) The whole of the supply and installation of lamp posts including testing and commissioning of new lamp posts (flange mounted
type) and cables and all related works as shown in the drawings:

(i) All new LED light fittings cum mounting brackets … $ -

(ii) Lighting columns flanged mounted (j-bolt type) including stainless steel cap … $ -

(iii) Cabling works (including all the electrical accessories) from distribution boxes to all the car park lighting … $ -

(iv) Opening account and setting up separate meter and other related electrical accessories in the switch room … $ -

(v) Existing street and car park lighting columns, landscaping lighting and cables to be removed including reinstatement … $ -
works and restoring supply to those existing lighting columns/car park signages etc that are not affected by the car park
works.

(vi) All charges payable to Town Council and relevant authorities for the electrical connections to switch rooms, testing and … $ -
related works.

(d) Provision of earth control measures including treatment plant and maintain them as advised by the QECP. … $ -

(e) The provision of setting out and as-built survey drawings by Contractor for the completed car park works. … $ -

(f) The engagement of Arborist for the proper advice of trimming of tree roots/branches, identification of unhealthy or unstable trees … $ -
to be replaced with approved type and the preparation of Arborist report for the certification of all trees are of good health and
stability. (Before and after construction works)

(g) Miscellaneous works such as signages for handicap, traffic signs including posts, etc as shown in the drawings. … $ -

SUB TOTAL FOR (7) TRANSFERRED TO TOTAL LUMP SUM BREAKDOWN … $ -

AANNEX B Works to Carparks (Contract 5)_FOT_Annex B


Page 8 of 14
FORM OF TENDER
SCHEDULE 1-8

BREAKDOWN OF TOTAL LUMP SUM


ADDITION AND ALTERATION WORKS TO CAR PARKS (C5)

S/N Descriptions Amount

(8) CAR PARK NO. HG52, BLOCK 556-566 HOUGANG ST 51

(a) The whole of the car park addition and alteration works including the demolition of existing lots and replacement with cast in situ
concrete slab parking lots and all related works as shown in the drawings

(i) Demolition works including hacking, removal and disposal … $ -

(ii) Reconstruction of driveway road base, sub-base, patching / laying of asphalt premix to required level … $ -

(iii) Construction of car lots / motorcycles lots / tree lots / no parking lots / handicap lots to required level … $ -

(iv) Painting of car / motorcycle / no parking / handicap parking lots marking, numberings and all necessary road markings … $ -

(v) Reconstruction of kerbs, foundation, bollards, footpaths, ramps, humps … $ -

(vi) Tree planting and all necessary reinstatement works of the green turfing according to NParks' requirement … $ -

(vii) Reconstruction of rigid pavement at the access of Electrical Substation and Bin Centre with bollards … $ -

(b) The whole of the removal and reconstruction of partial drain walls, drain top slab, drain cover/grating, concrete benching, PC … $ -
channels and all related works to required level as shown in the drawings.

(c) The whole of the supply and installation of lamp posts including testing and commissioning of new lamp posts (flange mounted
type) and cables and all related works as shown in the drawings:

(i) Installation of illuminated season lots signboards including electrical supply … $ -

(ii) All new LED light fittings cum mounting brackets … $ -

(iii) Lighting columns flanged mounted (j-bolt type) including stainless steel cap … $ -

(iv) Cabling works (including all the electrical accessories) from distribution boxes to all the car park lighting … $ -

(v) Opening account and setting up separate meter and other related electrical accessories in the switch room … $ -

(vi) Existing street and car park lighting columns, landscaping lighting and cables to be removed including reinstatement … $ -
works and restoring supply to those existing lighting columns/car park signages etc that are not affected by the car park
works.

(vii) All charges payable to Town Council and relevant authorities for the electrical connections to switch rooms, testing and … $ -
related works.

(d) Provision of earth control measures including treatment plant and maintain them as advised by the QECP. … $ -

(e) The provision of setting out and as-built survey drawings by Contractor for the completed car park works. … $ -

(f) The engagement of Arborist for the proper advice of trimming of tree roots/branches, identification of unhealthy or unstable trees … $ -
to be replaced with approved type and the preparation of Arborist report for the certification of all trees are of good health and
stability. (Before and after construction works)

(g) Miscellaneous works such as signages for handicap, traffic signs including posts, etc as shown in the drawings. … $ -

SUB TOTAL FOR (8) TRANSFERRED TO TOTAL LUMP SUM BREAKDOWN $ -

AANNEX B Works to Carparks (Contract 5)_FOT_Annex B


Page 9 of 14
FORM OF TENDER
SCHEDULE 1-9

BREAKDOWN OF TOTAL LUMP SUM


ADDITION AND ALTERATION WORKS TO CAR PARKS (C5)

S/N Descriptions Amount

(9) CAR PARK NO.SI 6, BLOCK 132 SIMEI STREET 1

(a) The whole of the car park addition and alteration works including the demolition of existing lots and replacement with cast in situ
concrete slab parking lots and all related works as shown in the drawings

(i) Demolition works including hacking, removal and disposal … $ -

(ii) Reconstruction of driveway road base, sub-base, patching / laying of asphalt premix to required level … $ -

(iii) Construction of car lots / motorcycles lots / tree lots / no parking lots / handicap lots to required level
… $ -
(iv) Painting of car / motorcycle / no parking / handicap parking lots marking, numberings and all necessary road markings

… $ -
(v) Reconstruction of kerbs, foundation, bollards, footpaths, ramps, humps

(vi) All necessary reinstatement works of the green turfing according to NParks' requirement … $ -

(b) The whole of the removal and reconstruction of partial drain walls, drain top slab, drain cover/grating, concrete benching, PC … $ -
channels and all related works to required level as shown in the drawings.

(c) The whole of the supply and installation of lamp posts including testing and commissioning of new lamp posts (flange mounted
type) and cables and all related works as shown in the drawings:

(i) Installation of illuminated season lots signboards including electrical supply … $ -

(ii) All new LED light fittings cum mounting brackets … $ -

(iii) Lighting columns flanged mounted (j-bolt type) including stainless steel cap … $ -

(iv) Cabling works (including all the electrical accessories) from distribution boxes to all the car park lighting … $ -

(v) Opening account and setting up separate meter and other related electrical accessories in the switch room … $ -

(vi) Existing street and car park lighting columns, landscaping lighting and cables to be removed including reinstatement … $ -
works and restoring supply to those existing lighting columns/car park signages etc that are not affected by the car park
works.

(vii) All charges payable to Town Council and relevant authorities for the electrical connections to switch rooms, testing and … $ -
related works.

(d) Provision of earth control measures including treatment plant and maintain them as advised by the QECP. … $ -

(e) The provision of setting out and as-built survey drawings by Contractor for the completed car park works. … $ -

(f) The engagement of Arborist for the proper advice of trimming of tree roots/branches, identification of unhealthy or unstable trees … $ -
to be replaced with approved type and the preparation of Arborist report for the certification of all trees are of good health and
stability. (Before and after construction works)

(g) Miscellaneous works such as signages for handicap, traffic signs including posts, etc as shown in the drawings. … $ -

SUB TOTAL FOR (9) TRANSFERRED TO TOTAL LUMP SUM BREAKDOWN $ -

AANNEX B Works to Carparks (Contract 5)_FOT_Annex B


Page 10 of 14
FORM OF TENDER
SCHEDULE 1-10

BREAKDOWN OF TOTAL LUMP SUM


ADDITION AND ALTERATION WORKS TO CAR PARKS (C5)

S/N Descriptions Amount

(10) CAR PARK NO. U41, BLOCK 630-644, BUKIT BATOK CENTRAL

(a) The whole of the car park addition and alteration works including the demolition of existing lots and replacement with cast in situ
concrete slab parking lots and all related works as shown in the drawings

(i) Demolition works including hacking, removal and disposal … $ -

(ii) Construction of driveway road base, sub-base, patching / laying of asphalt premix to required level … $ -

(iii) Reconstruction of driveway road base, sub-base, patching / laying of asphalt premix to required level … $ -

(iv) Construction of car lots / motorcycles lots / tree lots / no parking lots / handicap lots to required level … $ -

(v) Painting of car / motorcycle / no parking / handicap parking lots marking, numberings and all necessary road markings … $ -

(vi) Reconstruction/reinstatement of kerbs, foundation, bollards, footpaths, ramps, humps … $ -

(vii) All necessary reinstatement works of the green turfing according to NParks' requirement … $ -

(viii) Reconstruction of rigid pavement at the access of Electrical Substation with bollards and loading and unloading bay, … $ -
washing bays, no parking area to required level

(ix) Construction of new bollards, Drop Inlet Chambers, footpaths to required level … $ -

(b) Contractor is required to obtain approval for permission to carry works from LTA prior to commence of construction works within … $ -
the restricted area as shown in the drawings.

(c) The whole of the removal and reconstruction of partial drain walls, drain top slab, drain cover/grating, concrete benching, PC … $ -
channels and all related works to required level as shown in the drawings.

(d) The whole of the supply and installation of lamp posts including testing and commissioning of new lamp posts (flange mounted
type) and cables and all related works as shown in the drawings:

(i) Installation of illuminated season lots signboards including electrical supply … $ -

(ii) All new LED light fittings cum mounting brackets … $ -

(iii) Lighting columns flanged mounted (j-bolt type) including stainless steel cap … $ -

(iv) Cabling works (including all the electrical accessories) from distribution boxes to all the car park lighting … $ -

(v) Opening account and setting up separate meter and other related electrical accessories in the switch room … $ -

(vi) Existing street and car park lighting columns, landscaping lighting and cables to be removed including reinstatement … $ -
works and restoring supply to those existing lighting columns/car park signages etc that are not affected by the car park
works.

(vii) All charges payable to Town Council and relevant authorities for the electrical connections to switch rooms, testing and … $ -
related works.

(e) Provision of earth control measures including treatment plant and maintain them as advised by the QECP. … $ -

(f) The provision of setting out and as-built survey drawings by Contractor for the completed car park works. … $ -

(g) The engagement of Arborist for the proper advice of trimming of tree roots/branches, identification of unhealthy or unstable trees … $ -
to be replaced with approved type and the preparation of Arborist report for the certification of all trees are of good health and
stability. (Before and after construction works)

(h) Construction of granolithic finish, RC bollards, stainless steel railings and all related works, as specified and shown in drawings. … $ -

(i) Miscellaneous works such as signages for handicap, loading/unloading bay, traffic signs including posts, etc as shown in the … $ -
drawings.

SUB TOTAL FOR (10) TRANSFERRED TO TOTAL LUMP SUM BREAKDOWN $ -

AANNEX B Works to Carparks (Contract 5)_FOT_Annex B


Page 11 of 14
FORM OF TENDER
SCHEDULE 1-11

BREAKDOWN OF TOTAL LUMP SUM


ADDITION AND ALTERATION WORKS TO CAR PARKS (C5)

S/N Descriptions Amount

(11) CAR PARK NO. U20,BUKIT BATOK EAST AVE 2/6 (HV PARK)

(a) The whole of the car park addition and alteration works including the demolition of existing lots and replacement with cast in situ
concrete slab parking lots and all related works as shown in the drawings

(i) Demolition works including hacking, removal and disposal … $ -

(ii) Reconstruction of driveway road base, sub-base, patching / laying of asphalt premix to required level … $ -

(iii) Construction of car lots / motorcycles lots / tree lots / no parking lots / handicap lots to required level … $ -

(iv) Painting of car / motorcycle / no parking / handicap parking lots marking, numberings and all necessary road markings … $ -

(v) Reconstruction of kerbs, foundation, bollards, footpaths, ramps, humps … $ -

(vi) Trimming of selected trees and all necessary reinstatement works of the green turfing according to NParks' requirement … $ -

(vii) Construction of retaining wall with overhang for vehicle lots … $ -

(b) The whole of the removal and reconstruction of partial drain walls, drain top slab, drain cover/grating, concrete benching, PC … $ -
channels and all related works to required level as shown in the drawings.

(c) The whole of the supply and installation of lamp posts including testing and commissioning of new lamp posts (flange mounted
type) and cables and all related works as shown in the drawings:

(i) Installation of illuminated season lots signboards including electrical supply … $ -

(ii) All new LED light fittings cum mounting brackets … $ -

(iii) Lighting columns flanged mounted (j-bolt type) including stainless steel cap … $ -

(iv) Cabling works (including all the electrical accessories) from distribution boxes to all the car park lighting … $ -

(v) Opening account and setting up separate meter and other related electrical accessories in the switch room … $ -

(vi) Existing street and car park lighting columns, landscaping lighting and cables to be removed including reinstatement … $ -
works and restoring supply to those existing lighting columns/car park signages etc that are not affected by the car park
works.

(vii) All charges payable to Town Council and relevant authorities for the electrical connections to switch rooms, testing and … $ -
related works.

(d) Provision of earth control measures including treatment plant and maintain them as advised by the QECP. … $ -

(e) The provision of setting out and as-built survey drawings by Contractor for the completed car park works. … $ -

(f) The engagement of Arborist for the proper advice of trimming of tree roots/branches, identification of unhealthy or unstable trees … $ -
to be replaced with approved type and the preparation of Arborist report for the certification of all trees are of good health and
stability. (Before and after construction works)

(g) Miscellaneous works such as signages for handicap, traffic signs including posts, etc as shown in the drawings. … $ -

SUB TOTAL FOR (11) TRANSFERRED TO TOTAL LUMP SUM BREAKDOWN … $ -

AANNEX B Works to Carparks (Contract 5)_FOT_Annex B


Page 12 of 14
FORM OF TENDER
SCHEDULE 1-12

BREAKDOWN OF TOTAL LUMP SUM


ADDITION AND ALTERATION WORKS TO CAR PARKS (C5)

S/N Descriptions Amount

(12) CAR PARK NO. W20, BLOCK 144-166 WOODLAND ST 13

(a) The whole of the car park addition and alteration works and all related works, as shown in the drawings

(i) Demolition works including hacking, removal and disposal … $ -

(ii) Minimum 50mm thick milling and patching to affected driveway … $ -

(iii) Construction of kerbs, foundation, and retaining wall for carpark overhang … $ -

(iv) Construction of cut-off-drain with heavy duty hot dipped galvanised grating … $ -

(v) Construction of pipe culvert crossing from sump to existing road side drain … $ -

(vi) Reinstatement works of the green turfing according to NParks' requirement … $ -

(vii) Construction of sump joining cut-off drain and existing roadside drain … $ -

(viii) Construction of 150mm subsoil pipe wrapped with 300x300mm aggregate and non-woven heat bonded geotextile all … $ -
round

(ix) Painting of car / motorcycle / no parking / handicap parking lots marking, numberings and all necessary road markings … $ -

(b) Provision of earth control measures including treatment plant and maintain them as advised by the QECP. … $ -

(c) The provision of setting out and as-built survey drawings by Contractor for the completed car park works. … $ -

SUB TOTAL FOR (12) TRANSFERRED TO TOTAL LUMP SUM BREAKDOWN … $ -

AANNEX B Works to Carparks (Contract 5)_FOT_Annex B


Page 13 of 14
FORM OF TENDER
SCHEDULE 1-13

BREAKDOWN OF TOTAL LUMP SUM


ADDITION AND ALTERATION WORKS TO CAR PARKS (C5)

S/N Descriptions Amount

(13) CAR PARK NO. BJ66, BLOCK 634 SENJA ROAD

(a) The whole of the car park addition and alteration works and all related works, as shown in the drawings

(i) Demolition works including hacking, removal and disposal … $ -

(ii) Widening of driveway comprising of 200mm thick Grade 40 concrete with 2 layer of WSF B8 mesh, 150mm thick … $ -
hardcore, with interlocking concrete paver blocks as top layer, to required level

(iii) Reconstruction of affected kerbs, foundation, footpaths, ramps, humps … $ -

(iv) Painting of affected road markings … $ -

(v) Reconstruction of affected drain top slab, reinstate of affected drain with heavy duty grating, to required level … $ -

(vi) The engagement of PE and service provider for the relocation of affected services (eg water valve, fire hydrant) … $ -

(vii) The engagement of Arborist for the proper advice of transplanting of affected trees, trimming of tree roots/branches, … $ -
identification of unhealthy or unstable trees to be replaced with approved type and the preparation of Arborist report for
the certification of all trees are of good health and stability. (Before and after construction works)

(viii) Miscellaneous works such as relocation of signages and affected lamp post to be flange mounted as shown in the … $ -
drawings.

SUB TOTAL FOR (13) TRANSFERRED TO TOTAL LUMP SUM BREAKDOWN … $ -

AANNEX B Works to Carparks (Contract 5)_FOT_Annex B


Page 14 of 14
SCHEDULE 1 TO FORM OF TENDER

ADDITION AND ALTERATION WORKS TO CAR PARKS (C5)

TOTAL LUMP SUM BREAKDOWN

The details of the breakdown of our Total Lump Sum (see Note 2) are as follows:-

S/N Description Amount ($)


(See Note 1)

(1) CAR PARK NO. A48 AT BLOCK 571/573 ANG MO KIO ST 51 … $ -

(2) CAR PARK NO. A64 BLOCK 584/586 ANG MO KIO ST 51 … $ -

(3) CAR PARK NO. BE16, BISHAN PARK 1 … $ -

(4) CAR PARK NO. BE19, BLOCK 503/504 BISHAN ST 11 … $ -

(5) CAR PARK NO. BE21, BLOCK 506/509 BISHAN ST 11 … $ -

(6) CAR PARK NO. BE22, BLOCK 511/513 BISHAN ST 11 … $ -

(7) CAR PARK NO. BR18, BLOCK 111A ST MICHAEL BUS TERMINAL … $ -

(8) CAR PARK NO. HG52, BLOCK 556-566 HOUGANG ST 51 … $ -

(9) CAR PARK NO.SI 6, BLOCK 132 SIMEI STREET 1 … $ -

(10) CAR PARK NO. U41, BLOCK 630-644, BUKIT BATOK CENTRAL … $ -

(11) CAR PARK NO. U20,BUKIT BATOK EAST AVE 2/6 (HV PARK) … $ -

(12) CAR PARK NO. W20, BLOCK 144-166 WOODLAND ST 13 … $ -

(13) CAR PARK NO. BJ66, BLOCK 634 SENJA ROAD … $ -

TOTAL LUMP SUM TO BE SUBMITTED VIA GEBIZ … $ -

Note:
1)    The Total Lump Sum submitted shall not have more than 2 decimal places. There will be no rounding up or down and any numbers after the first 2 decimal places will be
disregarded. For example, $1,000,000.352 and $1,000,000.357 will both be regarded as $1,000,000.35.

2)    Please refer to Note 3(f) of the Preamble in Form of Tender.

AANNEX B Works to Carparks (Contract 5)_FOT_Annex B

You might also like