Customer Jetstar
Change type
Change details
Change ticket CHG0485102
Title Skype for Business 2015 server and Sonus SBC internal
certificates update – Jetstar Melbourne/Japan/Singapore
Description / reason All internal certificates used in the production environment are
expiring on 28/01/2019 and need to be reissued to ensure system
continuity.
Impact (during change) The change will be performed afterhours and on a per-server basis
to minimise user disruption.
End users may experience up to 30 seconds of downtime whilst
their clients re-register to next available server during the
maintenance window.
Risk Medium
Resources Required
An onsite SfB user with a headset, webcam and Outlook will be Jetstar Yes / No
required to complete this testing
IComm Australia Pty Ltd. All rights reserved. Copyright in the whole or every part of this document belongs to
IComm, and cannot be used, transferred, copied or reproduced in whole or in part in any manner or form or in any
media to any person other than with the prior written consent of IComm.
1
Resource Responsible Provided
2 working test users accounts (1 with email) will be required to Jetstar / Telstra Yes / No
complete this testing Purple
2 different testing locations with audio & video will be required to Telstra Purple Yes / No
complete this testing
Change Window
Commencement (date/time) Wednesday 15th January 2020 @ 09:00pm
Participants
IComm Australia Pty Ltd. All rights reserved. Copyright in the whole or every part of this document belongs to
IComm, and cannot be used, transferred, copied or reproduced in whole or in part in any manner or form or in any
media to any person other than with the prior written consent of IComm.
2
Systems Impacted by Change
Edge Servers
MELDC1SES01
MELDC1SES02
TYODC1SES01
TYODC1SES02
Sonus SBC
MELDC1SBC01
MELDC1SBC02
MELJQ1SBC01
MELJQ1SBC02
SINDC1SBC01
TYODCNET01
TYODCNET02
IComm Australia Pty Ltd. All rights reserved. Copyright in the whole or every part of this document belongs to
IComm, and cannot be used, transferred, copied or reproduced in whole or in part in any manner or form or in any
media to any person other than with the prior written consent of IComm.
3
Preparation
Ready
# Preparation (Anytime) Resp
?
2 Confirm the necessary backup for the existing certificates are taken Telstra Purple Y/N
3 Confirm the Sonus gateway backups are taken. Telstra Purple Y/N
Implementation Steps
# Date /
Preparation (BH on the day of the outage) Resp Time /
Duration
1 Generating the Certificate Signing Request (CSR) for the Sonus gateways.
MELDC1SBC01
MELDC1SBC02
MELJQ1SBC01
Telstra Purple 30 min
MELJQ1SBC02
SINDC1SBC01
TYODCNET01
TYODCNET02
2 Generating the Certificates Signing Request (CSR) for the Edge servers.
MELDC1SES01
MELDC1SES02 Telstra Purple 20 min
TYODC1SES01
TYODC1SES02
IComm Australia Pty Ltd. All rights reserved. Copyright in the whole or every part of this document belongs to
IComm, and cannot be used, transferred, copied or reproduced in whole or in part in any manner or form or in any
media to any person other than with the prior written consent of IComm.
4
# Date /
Implementation Resp Time /
Duration
2 Telstra Purple
Update the new Internal certificates. 5 min
2 X Engineers
5 Telstra Purple
Update the new Internal certificates. 5 min
2 X Engineers
8 Telstra Purple
Update the new Internal certificates. 5 min
2 X Engineers
IComm Australia Pty Ltd. All rights reserved. Copyright in the whole or every part of this document belongs to
IComm, and cannot be used, transferred, copied or reproduced in whole or in part in any manner or form or in any
media to any person other than with the prior written consent of IComm.
5
2 X Engineers
IComm Australia Pty Ltd. All rights reserved. Copyright in the whole or every part of this document belongs to
IComm, and cannot be used, transferred, copied or reproduced in whole or in part in any manner or form or in any
media to any person other than with the prior written consent of IComm.
6
14 Update the new Internal certificates.
Telstra Purple
MELDC1SES02 5 min
TYODC1SES01 2 X Engineers
TYODC1SES02
# Date /
Test Phase Resp Time /
Duration
IComm Australia Pty Ltd. All rights reserved. Copyright in the whole or every part of this document belongs to
IComm, and cannot be used, transferred, copied or reproduced in whole or in part in any manner or form or in any
media to any person other than with the prior written consent of IComm.
7
# Date /
Rollback Resp Time /
Duration
2 Telstra Purple
Rollback to the old certificates 5 min
2 X Engineers
5 Telstra Purple
Rollback to the old certificates 5 min
2 X Engineers
8 Telstra Purple
Rollback to the old certificates 5 min
2 X Engineers
IComm Australia Pty Ltd. All rights reserved. Copyright in the whole or every part of this document belongs to
IComm, and cannot be used, transferred, copied or reproduced in whole or in part in any manner or form or in any
media to any person other than with the prior written consent of IComm.
8
2 X Engineers
IComm Australia Pty Ltd. All rights reserved. Copyright in the whole or every part of this document belongs to
IComm, and cannot be used, transferred, copied or reproduced in whole or in part in any manner or form or in any
media to any person other than with the prior written consent of IComm.
9
14 Rollback to the old certificates
Telstra Purple
MELDC1SES02 5 min
TYODC1SES01 2 X Engineers
TYODC1SES02
# Date /
Roll back Test Phase Resp Time /
Duration
IComm Australia Pty Ltd. All rights reserved. Copyright in the whole or every part of this document belongs to
IComm, and cannot be used, transferred, copied or reproduced in whole or in part in any manner or form or in any
media to any person other than with the prior written consent of IComm.
10
Test Plan
Pre- Post
Test # Description Notes
Change Change
Skype/Lync Internal
1 Onsite resource
Skype/Lync enabled user sign into Skype/Lync
required
Onsite resource
2 Skype/Lync enabled users able to search contact lists
required
Skype/Lync External
2 working test
Externally connected Skype/Lync enabled users able to IM users required
13
other externally connected Skype/Lync enabled users 2 separate test
locations req’d
IComm Australia Pty Ltd. All rights reserved. Copyright in the whole or every part of this document belongs to
IComm, and cannot be used, transferred, copied or reproduced in whole or in part in any manner or form or in any
media to any person other than with the prior written consent of IComm.
11
Pre- Post
Test # Description Notes
Change Change
2 working test
Externally connected Skype/Lync enabled users able to users required
14 Skype/Lync call other externally connected Skype/Lync
enabled users 2 separate test
locations req’d
2 working test
Externally connected Skype/Lync enabled users able users required
16 video call other externally connected Skype/Lync enabled
users 2 separate test
locations req’d
Onsite resource
required
Externally connected Skype/Lync enabled users able to
2 working test
18 conference other externally & internally connected
users required
Skype/Lync enabled users
2 separate test
locations req’d
Onsite resource
required
Externally connected Skype/Lync enabled users able to
2 working test
19 share desktop within a conference with internally &
users required
externally connected Skype/Lync enabled users
2 separate test
locations req’d
2 working test
Externally connected Skype/Lync enabled users able to users required
20 transfer calls to other externally connected Skype/Lync
enabled users 2 separate test
locations req’d
IComm Australia Pty Ltd. All rights reserved. Copyright in the whole or every part of this document belongs to
IComm, and cannot be used, transferred, copied or reproduced in whole or in part in any manner or form or in any
media to any person other than with the prior written consent of IComm.
12
Pre- Post
Test # Description Notes
Change Change
2 separate test
locations req’d
Skype/Lync Federation
Skype/Lync enabled users able video call to / from other 2 separate test
26
federated Skype/Lync enabled users locations req’d
IComm Australia Pty Ltd. All rights reserved. Copyright in the whole or every part of this document belongs to
IComm, and cannot be used, transferred, copied or reproduced in whole or in part in any manner or form or in any
media to any person other than with the prior written consent of IComm.
13
Pre- Post
Test # Description Notes
Change Change
IComm Australia Pty Ltd. All rights reserved. Copyright in the whole or every part of this document belongs to
IComm, and cannot be used, transferred, copied or reproduced in whole or in part in any manner or form or in any
media to any person other than with the prior written consent of IComm.