The Engineer Representative/RE Ref: SMDN/Site/I-12/261

MEINHARTD Pvt. Ltd. Date: 27-09-2020

PROJECT: CONSTRUCTION OF BOX CULVERT AND UNDER GROUND WATER TANKS AT I-12,
ISLAMABAD (PACKAGE-10)

SUBJECT: CLARIFICATION REQUIRED IN THE UNDERGROUND WATER TANK’S DRAWINGS

Dear Sir,
Refer to the UNGWT’s drawings wherein the foundation Reinforcement is stated as
#5@6” c/c in Drawing No: S-01 while #6@6” c/c in Drawing No: S-04. Also, the height of
the columns mentioned in drawing S-04 is “11’-20’ (May vary)” which is a variable height
rather than an exact height, as highlighted in the attached copy. We therefore, request you
that additional or modified drawings may be issued to our office after any necessary
changes.

Regards

M/S Samdani Construction

C.C
1. The Engineer, Meinhardt