Professional Documents
Culture Documents
Faculty of Engineering
Civil Engineering Department
Course title: Reinforced Concrete Structures 1 (CIV 223)
Academic semester: Spring 2019/2020
Solid Slab Sheet Solution [Q1]
1) Slab Naming
2) Slabs Type
3) Slabs Thickness
For O.W.S
S4
𝒍𝒔𝒏 (𝟐𝟓𝟎𝟎−𝟏𝟐𝟎)
𝒕𝑺 𝒎𝒊𝒏 = 𝟑𝟏
= 𝟑𝟏
= 𝟕𝟔. 𝟕𝟕 𝒎𝒎 (not less than 80 mm) , ∴ 𝒕𝑺 𝒎𝒊𝒏 = 𝟖𝟎 𝒎𝒎
Ca1
𝒍𝒏𝒄 𝟏𝟎𝟎𝟎
𝒕𝑺 𝒎𝒊𝒏 = = = 𝟏𝟎𝟎 𝒎𝒎
𝟏𝟎 𝟏𝟎
Ca2
𝒍𝒏𝒄 𝟕𝟎𝟎
𝒕𝑺 𝒎𝒊𝒏 = = = 𝟕𝟎 𝒎𝒎 (not less than 80 mm) , ∴ 𝒕𝑺 𝒎𝒊𝒏 = 𝟖𝟎 𝒎𝒎
𝟏𝟎 𝟏𝟎
For T.W.S
S1
𝒇𝒚
𝑳𝒔 (𝟎.𝟖𝟓+ )
𝒕𝑺 𝒎𝒊𝒏 = 𝟐𝟓
𝟏𝟔𝟎𝟎
(not less than 100 mm)
𝟏𝟓+ +𝟏𝟎𝜷𝒑
(𝑳𝒍 ⁄𝑳𝒔 )
𝟒.𝟗𝟎
𝜷𝒑,𝒔𝟏 = 𝟐(𝟔.𝟏+𝟑.𝟖𝟓) = 𝟎. 𝟐𝟒𝟔
𝟒𝟎𝟎
𝟑𝟖𝟓𝟎(𝟎.𝟖𝟓+ )
𝒕𝑺 𝒎𝒊𝒏 = 𝟐𝟓
𝟏𝟔𝟎𝟎
= 𝟏𝟐𝟕. 𝟒𝟏 𝒎𝒎. ∴ 𝒕𝑺 𝒎𝒊𝒏 = 𝟏𝟒𝟎 𝒎𝒎
𝟏𝟓+ +𝟏𝟎(𝟎.𝟐𝟒𝟔)
(𝟔.𝟏𝟎⁄𝟑.𝟖𝟓)
S2
𝟒.𝟗𝟎+𝟒.𝟗𝟎+𝟑.𝟕𝟓
𝜷𝒑,𝒔𝟐 = 𝟐(𝟒.𝟗𝟎+𝟑.𝟕𝟓)
= 𝟎. 𝟕𝟖
𝟒𝟎𝟎
𝟑𝟕𝟓𝟎(𝟎.𝟖𝟓+ )
𝒕𝑺 𝒎𝒊𝒏 = 𝟐𝟓
𝟏𝟔𝟎𝟎
= 𝟗𝟖. 𝟑𝟕 𝒎𝒎. ∴ 𝒕𝑺 𝒎𝒊𝒏 = 𝟏𝟎𝟎 𝒎𝒎
𝟏𝟓+ +𝟏𝟎(𝟎.𝟕𝟖)
(𝟒.𝟗𝟎⁄𝟑.𝟕𝟓)
S3
𝟒.𝟗𝟎+𝟐.𝟕𝟓
𝜷𝒑,𝒔𝟑 = 𝟐(𝟒.𝟗𝟎+𝟐.𝟕𝟓) = 𝟎. 𝟓𝟎
𝟒𝟎𝟎
𝟐𝟕𝟓𝟎(𝟎.𝟖𝟓+ )
𝒕𝑺 𝒎𝒊𝒏 = 𝟐𝟓
𝟏𝟔𝟎𝟎
= 𝟖𝟖. 𝟖𝟗 𝒎𝒎. ∴ 𝒕𝑺 𝒎𝒊𝒏 = 𝟏𝟎𝟎 𝒎𝒎
𝟏𝟓+ +𝟏𝟎(𝟎.𝟓𝟎)
(𝟒.𝟗𝟎⁄𝟐.𝟕𝟓)
S5
𝟑.𝟖𝟎+𝟐.𝟕𝟓+𝟐.𝟕𝟓
𝜷𝒑,𝒔𝟓 = 𝟐(𝟑.𝟖𝟎+𝟐.𝟕𝟓)
= 𝟎. 𝟕𝟏
𝟒𝟎𝟎
𝟐𝟕𝟓𝟎(𝟎.𝟖𝟓+ )
𝒕𝑺 𝒎𝒊𝒏 = 𝟐𝟓
𝟏𝟔𝟎𝟎
= 𝟕𝟓. 𝟐𝟔 𝒎𝒎. ∴ 𝒕𝑺 𝒎𝒊𝒏 = 𝟏𝟎𝟎 𝒎𝒎
𝟏𝟓+ +𝟏𝟎(𝟎.𝟕𝟏)
(𝟑.𝟖𝟎⁄𝟐.𝟕𝟓)
S6
𝟒.𝟖𝟎+𝟑.𝟖𝟎+𝟑.𝟕𝟓
𝜷𝒑,𝒔𝟔 = 𝟐(𝟒.𝟖𝟎+𝟑.𝟕𝟓)
= 𝟎. 𝟕𝟐
𝟒𝟎𝟎
𝟑𝟕𝟓𝟎(𝟎.𝟖𝟓+ )
𝒕𝑺 𝒎𝒊𝒏 = 𝟐𝟓
𝟏𝟔𝟎𝟎
= 𝟗𝟖. 𝟖𝟒 𝒎𝒎. ∴ 𝒕𝑺 𝒎𝒊𝒏 = 𝟏𝟎𝟎 𝒎𝒎
𝟏𝟓+ +𝟏𝟎(𝟎.𝟕𝟐)
(𝟒.𝟖𝟎⁄𝟑.𝟕𝟓)
S7
𝟑.𝟖𝟓
𝜷𝒑,𝒔𝟕 = 𝟐(𝟑.𝟖𝟓+𝟑.𝟕𝟎) = 𝟎. 𝟐𝟓
𝟒𝟎𝟎
𝟑𝟕𝟎𝟎(𝟎.𝟖𝟓+ )
𝒕𝑺 𝒎𝒊𝒏 = 𝟐𝟓
𝟏𝟔𝟎𝟎
= 𝟗𝟖. 𝟎𝟏 𝒎𝒎. ∴ 𝒕𝑺 𝒎𝒊𝒏 = 𝟏𝟎𝟎 𝒎𝒎
𝟏𝟓+ +𝟏𝟎(𝟎.𝟐𝟓)
(𝟑.𝟖𝟓⁄𝟑.𝟕𝟎)
S8
𝟐.𝟒𝟏+𝟎.𝟕𝟎
𝜷𝒑,𝒔𝟖 = 𝟐(𝟐.𝟔𝟎+𝟐.𝟒𝟏) = 𝟎. 𝟑𝟏
𝟒𝟎𝟎
𝟐𝟒𝟏𝟎(𝟎.𝟖𝟓+ )
𝒕𝑺 𝒎𝒊𝒏 = 𝟐𝟓
𝟏𝟔𝟎𝟎
= 𝟔𝟒. 𝟑𝟖 𝒎𝒎. ∴ 𝒕𝑺 𝒎𝒊𝒏 = 𝟏𝟎𝟎 𝒎𝒎
𝟏𝟓+ +𝟏𝟎(𝟎.𝟑𝟏)
(𝟐.𝟔𝟎⁄𝟐.𝟒𝟏)
4) Loads
Dead Load
𝑾𝑫.𝑳 = 𝜸𝑪 . 𝒕𝒔 + 𝑭. 𝑪 = 𝟐𝟓 × 𝟎. 𝟏𝟒 + 𝟐. 𝟎 = 𝟓. 𝟓 𝒌𝑵/𝒎𝟐
Live Load
5) Load distribution
For O.W.S
For T.W.S
Slab r α β 𝒘∝ 𝒘𝜷
S1 1.82 0.76 0.105 9.70 1.34
Values of α and β can be accurately calculated from the following equations and approximately for the
following table.
𝒓 𝟎.𝟑𝟓
∝= − 𝟎. 𝟏𝟓 , 𝜷 =
𝟐 𝒓𝟐
6) Design Strips
Strips in X-dir.
Strip (1)
From left
𝟗.𝟕(𝟑.𝟖𝟓)𝟑 𝟕.𝟔𝟓(𝟑.𝟕𝟓)𝟑
𝑴𝑨 (𝟑. 𝟖𝟓) + 𝟐𝑴𝑩 (𝟑. 𝟖𝟓 + 𝟑. 𝟕𝟓) + 𝑴𝑪 (𝟑. 𝟕𝟓) = −𝟔[ 𝟐𝟒
+ 𝟐𝟒
]
From right
𝟗.𝟒𝟒(𝟐.𝟕𝟓)𝟑 𝟕.𝟔𝟓(𝟑.𝟕𝟓)𝟑
𝑴𝑫 (𝟐. 𝟕𝟓) + 𝟐𝑴𝑪 (𝟐. 𝟕𝟓 + 𝟑. 𝟕𝟓) + 𝑴𝑩 (𝟑. 𝟕𝟓) = −𝟔[ 𝟐𝟒
+ 𝟐𝟒
]
Strip (2)
To get moment values, ECP-203 moment values cannot be applied here because there is a difference in loads
and also there is a difference in spans larger than 20%. Therefore, the 3-moment equations should be applied
here.
From left
𝟔.𝟐𝟓(𝟑.𝟕𝟓)𝟑 𝟓.𝟖𝟕(𝟐.𝟕𝟓)𝟑
𝑴𝑨 (𝟑. 𝟕𝟓) + 𝟐𝑴𝑩 (𝟑. 𝟕𝟓 + 𝟐. 𝟕𝟓) + 𝑴𝑪 (𝟐. 𝟕𝟓) = −𝟔[ 𝟐𝟒
+ 𝟐𝟒
] , 𝑴𝑨 𝒂𝒏𝒅 𝑴𝑪 = 𝒛𝒆𝒓𝒐.
𝟏𝟑𝑴𝑩 = −𝟏𝟏𝟐. 𝟗𝟏
Strip (3)
Strip (4)
Strips in Y-dir.
Strip (5)
From left
From right
𝟏.𝟒𝟎(𝟒.𝟗𝟎)𝟑 𝟏𝟐.𝟕𝟓(𝟐.𝟓𝟎)𝟑
𝑴𝑫 (𝟒. 𝟗𝟎) + 𝟐𝑴𝑪 (𝟒. 𝟗𝟎 + 𝟐. 𝟓𝟎) + 𝑴𝑩 (𝟐. 𝟓𝟎) = −𝟔[ 𝟐𝟒
+ 𝟐𝟒
]
Strip (6)
Strip (7)
Strip (8)
Strip (9)
𝒖𝑴
𝒇√ 𝟏𝒄 = 𝒅
𝒃𝒄𝒖 .
𝟔𝟎𝟏×𝟑𝟎𝟏𝟏.
√ 𝟏𝒄 = 𝟎𝟐 𝟏𝟒𝟎 − 𝟔𝟐𝟖 𝒄𝟏 = 𝟓. 𝟕𝟏 ∴ 𝐉 = 𝟎.
𝟎𝟎𝟎𝟏×𝟓𝟐
𝟔𝟎𝟏×𝟑𝟎𝟏𝟏.
) \𝒎𝑨𝒔 = 𝟒𝟎𝟎×𝟎.𝟖𝟐𝟔×𝟏𝟐𝟎 = 𝟐𝟕𝟖. 𝟐𝟎 𝒎𝒎𝟐 ⁄𝟕𝟖. 𝟓 𝒎𝒎𝟐 (∅𝟏𝟎) = 𝟑. 𝟓𝟒 𝒃𝒂𝒓 (𝒏𝒐𝒕 𝒍𝒆𝒔𝒔 𝒕𝒉𝒂𝒏 𝟓∅𝟏𝟎⁄
𝒖𝑴
𝒇√ 𝟏𝒄 = 𝒅
𝒃𝒄𝒖 .
𝟔𝟎𝟏×𝟖𝟖𝟏𝟑.
𝟎𝟎𝟎𝟏×𝟓𝟐 √ 𝟏𝒄 = 𝟎𝟐 𝟏𝟒𝟎 − 𝟔𝟐𝟖 𝒄𝟏 = 𝟓. 𝟎𝟗 ∴ 𝐉 = 𝟎.
𝟔𝟎𝟏×𝟖𝟖𝟏𝟑.
) \𝒎𝑨𝒔 = 𝟒𝟎𝟎×𝟎.𝟖𝟐𝟔×𝟏𝟐𝟎 = 𝟑𝟓𝟎. 𝟎𝟖 𝒎𝒎𝟐 ⁄𝟕𝟖. 𝟓 𝒎𝒎𝟐 (∅𝟏𝟎) = 𝟒. 𝟒𝟔 𝒃𝒂𝒓 (𝒏𝒐𝒕 𝒍𝒆𝒔𝒔 𝒕𝒉𝒂𝒏 𝟓∅𝟏𝟎⁄
للسهوله يمكنك تسليح كل شريحه بصوره منفصله كالتالي ويتم نقلها علي البالن مع مراعات اتجاهات الحديد من حيث السفلي او العلوي ويتم االخذ في االعتبار
تسليح اطراف الشرايح تسليح علوي لزوم عزم قيمته ( )wl2/24وذلك نتيجه اتصال البالطه بالكمره.
علي سبيل المثال -:تسليح شريحه( )1و يتم نقله علي البالن بعد ذلك واستكمال الحديد اللي مثبت الحديد العلوي في مكانه.
. )بعد تسليح الشرائح ونقلها علي البالن سيصبح بهذا الشكل ( هذا الشكل يحتوي علي التسليح الرئيسي للشرائح