Project Address: Galaxy 1 Fusionopolis Place Project Contact Person: Darell (BBR) Project Contact Details: bulaclacdarell@bbr.com.sg Mobile: 91218306(HP)
FAÇADE CLEANING- Cleaning one time by YONGFONG under YONG TBA For JH suggest to use polish powder method.
RPZ area level 3-6 BBR. FONG Under BBR requested. Cleaning By Yong Fong.
1
Water leaking at level (1) Level 16 plant structural got crack- YONG Done L16 leaking.1st recitification doneby JH on 27
16 and level 17 under BBR issue. FONG/BB Feb. 2nd investigation on 11 June.As
(2) Level 17 repaired. R agreed on DLP meeting. water bonding test
4
arranged by BBR
VO-broken glass need VO confirmed, Need to install. Emperor 21-5-2016 13-6-2016 Glss installation completed on 18 June 2016.
to install at level 3 √ √
5
Glass scratch mark(2X) To test cleaning YONG TBA To test cleaning by Yong Fong. Still under
and white Protection FONG monitor.
film mark found on
6 glasses at few area.
Woho building 02-59 to check onsite by spiderman team .BBR SIMA/BB TBA 1st investigation to check Woho L3(1x location)
&05-55 water leaking agree to pay if water leaking issue from R and Woho RF (2x Locations). Flushing is ok. To
issue Planter area. verify the water flow mark from internal.internal
7 access is needed.
BP building West To monitor. L7 Tenant TBA L7 One pcs louver installation by Tenant or
Elevation L7 2nd others. It affected our façade performance. Pls
portion internal water refer to louver installer for leaking investigation.
8 leaking
F5(Ref.: No.21 )