DAILY PROJECT REPORT

PT. KINGSWAY, KABUH-JOMBANG


Date: THURSDAY, JULY 01 2021

Qty
NO AREA WORK DESCRIPTION WORK PHOTOS
Man Power
DAYLY WORKER

1 Foreman 1 MP Job delivery, Job arrangement, Man Power Control

2 Warehouse 1 MP Inventory, purchase of goods

3 Ass. Supervisor 1 MP Calculated work, collect data man power

4 All Area 3 MP Make Becasting and Concrete for BRC Fence

PT. Kingsway Project, Kabuh-Jombang; Daily Report; 1/4


DAILY PROJECT REPORT
PT. KINGSWAY, KABUH-JOMBANG
Date: THURSDAY, JULY 01 2021

Qty
NO AREA WORK DESCRIPTION WORK PHOTOS
Man Power

5 All Area 6 MP Relocated Material and Clining

6 All Area 2 MP Reinforcement

7 All Area 2 MP Welding Job

Electrician & Mechanics; Connection electrical on


8 All Area 1 MP work project, dismantling electrical cable existing,
setting Genset, setting all mesin

17 MP

PT. Kingsway Project, Kabuh-Jombang; Daily Report; 2/4


DAILY PROJECT REPORT
PT. KINGSWAY, KABUH-JOMBANG
Date: THURSDAY, JULY 01 2021

Qty
NO AREA WORK DESCRIPTION WORK PHOTOS
Man Power

CONTRACT WORK

Injection, Assembly
1 7 MP Plastering, install brickwall
(Turmudi)

2 Back Site (Vincent) 22 MP Fence Arround Back site

Construction
3 7 MP Door, Stair, and Hoist Construction Fabrication
(Nyu Hamid)

4 Strauss (Asmuni) 5 MP Strauss Foundation

PT. Kingsway Project, Kabuh-Jombang; Daily Report; 3/4


DAILY PROJECT REPORT
PT. KINGSWAY, KABUH-JOMBANG
Date: THURSDAY, JULY 01 2021

Qty
NO AREA WORK DESCRIPTION WORK PHOTOS
Man Power

5 Vibro Roller 1 Lot Levelling and Compact Soil

6 All Area (Exca) 1 Lot Relocated Soil and Material

Waterproofing wall assembly, painting structure,


7 Assembly (Heru) 5 MP
curving, epoxy floor

48 MP
SITE PROJECT
(BOBI HINDARKO)

PT. Kingsway Project, Kabuh-Jombang; Daily Report; 4/4