You are on page 1of 4

I.T.P. No.

: IGC_RDS_ITP_008

INSPECTION&TEST PLAN Date : 12-Oct-20


98/55 Soi Ramkhamhaeng 39(Tepleela 1), Rev.No. : 0
Phlapphla, Wang Thonglang, Bangkok 10310 Page : 1 of 4
Project Name : CNS Countrywide Electrical Safety Rules Improvement Owner : Shell Company Of Thailand Limited
Job No. : Contract No. : In Good Company Limited
Description : Install main power supply 800 Amps(FLC) at Pump House 1 from Substaion pump house 2

Revision History
Status Description Rev # Date of Issue Originator Checker Approver
Issued for Review 0 12-Oct-20 Nott A.

Rev # Reason for Issue / Change


0 Issued for Review

IGC-FM-ENG-05, Rev.00, Eff. Date 15/03/63


I.T.P. No. : IGC_RDS_ITP_008

INSPECTION&TEST PLAN Date : 12-Oct-20


98/55 Soi Ramkhamhaeng 39(Tepleela 1), Rev.No. : 0
Phlapphla, Wang Thonglang, Bangkok 10310 2 of 4
Page :
Project Name : CNS Countrywide Electrical Safety Rules Improvement Owner : Shell Company Of Thailand Limited
Job No. : Contract No. : In Good Company Limited
Description : Install main power supply 800 Amps(FLC) at Pump House 1 from Substaion pump house 2

1.0 PURPOSE
The purpose of this Procedure is to provide guidance for development of Inspection and Test Plan (ITP) requirements of Electrical Installation and Testing Works.
2.0 SCOPE
This Procedure the quality control requirements for Electrical Installation and Testing Works. This Procedure is for monitoring and ensuring satisfactory performance at relevant
stages of construction whether by construction Contractor(s) or suppliers, In Good Company (IGC) or by the Shell Company.
3.0 DEFINITIONS
IGC In Good Company
Owner The Shell Company Thailand
3rd party Discipline Contractor, Supplier or Inspector working on the Project against a known scope of work.
P check and preparation of record
I Inspection
Inspects the work on an auditing or monitoring basis only. Activity such as measuring and testing of the work, and comparing the
results with the design requirements, to establish that the works have been constructed in accordance with the design
requirements.
R Review
Responsible for reviewing and authorising submissions
W Witness (W) Random Witness
Responsible for witnessing and signing work. Witness inspection may be waived by identified participants.
H Hold Point
Responsible for witnessing and signing work releasing Hold Points. Witness inspection may be NOT be waived by identified
participants. Work may NOT proceed beyond these mandatory Hold Points without witness by the identified participants
EIT Thailand Engineering Standard
SHELL’s Design and Engineering Practices, standard drawings, standard requisitions, standard forms, piping classes or any other
DEP
SHELL technical standard distributed using this DEP Distribution System.
IEC The International Electrotechnical Commission
NEC The National Electrical Code
NDT Non-Destructive Testing

IGC-FM-ENG-05, Rev.00, Eff. Date 15/03/63


I.T.P. No. : IGC_RDS_ITP_008

INSPECTION&TEST PLAN Date : 12-Oct-20


98/55 Soi Ramkhamhaeng 39(Tepleela 1), Rev.No. : 0
Phlapphla, Wang Thonglang, Bangkok 10310 Page : 3 of 4
Project Name : CNS Countrywide Electrical Safety Rules Improvement Owner : Shell Company Of Thailand Limited
Job No. : Contract No. : In Good Company Limited
Description : Install main power supply 800 Amps(FLC) at Pump House 1 from Substaion pump house 2
Reference Inspection Party
No. Description of Inspection Test Report No. Plan Actual Engineering Asset Owner (
(Codes/Std/Spec/Procedure) In Good 3rd Party
(Shell) Terminal)
1 General
1.1 Review Work scope Spec., Doc. MOM Weekly H H H H
1.2 ITP Approval IGC QC Manual Approved ITP
2 MATERIAL
Material Approval
2.1 Material Verification Specification and codes P,R I R R
Request
Material Preservation and
Materials Receiving
Maintenance requirements Manufacturer Instructions., DEP
2.2 Inspection, DEP P,R I (W),R (W),R
for all pertinent materials, HAZARDOUS AREA 63.10.08.91
63.10.08.91 Form1-4
EQUIPMENT
3 TRENCHING, CABLE TRAY/ RACK
Check drawings for conduit, cable
3.1 Layout Drawing I N/A (W),R (W),R
tray/rack routing
DEP 63.10.08.11
3.2 ABOVEGROUND CONDUIT SYSTEMS DEP 63.10.08.11 Form No.1, DEP I N/A (W),R (W),R
63.10.08.91 Form53
DEP 63.10.08.11
3.3 INSPECTION OF CABLE TRAY SYSTEMS DEP 63.10.08.11 Form No.1, DEP I N/A (W),R (W),R
63.10.08.91 Form55
DEP 63.10.08.11
INSPECTION OF UNDERGROUND CONDUIT
3.4 DEP 63.10.08.11 Form No.1, DEP I N/A (W),R (W),R
SYSTEMS (DUCTBANKS)
63.10.08.91 Form54
4 EARTHING AND BONDING
DEP 63.10.08.11
Form No.1, No.20,
4.1 EARTH SYSTEMS DEP 63.10.08.11 I N/A (W),R (W),R
DEP 63.10.08.91
Form58

IGC-FM-ENG-05, Rev.00, Eff. Date 15/03/63


I.T.P. No. : IGC_RDS_ITP_008

INSPECTION&TEST PLAN Date : 12-Oct-20


98/55 Soi Ramkhamhaeng 39(Tepleela 1), Rev.No. : 0
Phlapphla, Wang Thonglang, Bangkok 10310 Page : 4 of 4
Project Name : CNS Countrywide Electrical Safety Rules Improvement Owner : Shell Company Of Thailand Limited
Job No. : Contract No. : In Good Company Limited
Description : Install main power supply 800 Amps(FLC) at Pump House 1 from Substaion pump house 2
Reference Inspection Party
No. Description of Inspection Test Report No. Plan Actual Engineering Asset Owner (
(Codes/Std/Spec/Procedure) In Good 3rd Party
(Shell) Terminal)
5 WIRE AND CABLE
DEP 63.10.08.91
5.1 LOW-VOLTAGE CABLE AND WIRE DEP 63.10.08.11 Form 48, DEP I N/A (W),R (W),R
63.10.08.11 Form 1
6 ELECTRICAL EQUIPMENT
DEP 63.10.08.11
6.1 BASIC INSPECTION DEP 63.10.08.11 I N/A (W),R (W),R
Form 1
DEP 63.10.08.11
ELECTRICAL EQUIPMENT RECEIVING
6.2 DEP 63.10.08.11 Form No.1, DEP I N/A (W),R (W),R
CHECKLIST
63.10.08.91 Form 1
DEP 63.10.08.11
6.3 INSULATION RESISTANCE DEP 63.10.08.11 Form No.1, DEP I N/A (W),R (W),R
63.10.08.91 Form 2
DEP 63.10.08.11
LOW-VOLTAGE DISCONNECT
6.4 DEP 63.10.08.11 Form No.1, DEP I N/A (W),R (W),R
SWITCHES
63.10.08.91 Form 20

Position Name Signature


In Good Company Construction
Site Engineer (Shell)
Project Engineer
TA3 PM (Project Manager)
TA3 MMI
FE CNS

IGC-FM-ENG-05, Rev.00, Eff. Date 15/03/63