You are on page 1of 3

ΣMB 

= 0

 RA x 9.5m – P1 x Sin 45° x 8m – P2 x 5m – q x 1½m – q x ½m = 0


 9.5RA – 3.6t x ½√2 x 8m – 2.6t x 5m – 1.6t x 1½m – 1.6t x ½m = 0
 9.5RA – 3.6t x ½√2 x 8m – 2.6t x 5m – 1.6t x 1½m – 1.6t x ½m = 0
 9.5 RA– 20.36 – 15 – 2.4 – 0.8 = 0
 9.5 RA– 38.56 = 0
 9.5 RA = 38.56
 RA = 38.56/9.5   => RA = 4.059 ton

ΣMA = 0

 –RB x 9.5m + P1 x Sin 45° x 1½m – P2 x 3½m – Q x 8½ = 0


 –9.5RB + 3.6t x ½√2 x 1½m + 2.6t x 3½m – 1.6t x 4m x 8½m = 0
 –9.5RB + 3.6t x ½√2 x 1½m + 2.6t x 3½m + 1.6t x 4m x 8½m = 0
 –9.5RB + 3.818 + 9.1 + 54.4 = 0
 –9.5 RB = –67.318
 RB =  = 7.086 ton

ΣKV = 0

 RA +  RB – P1 x Cos 45°– P2 – q x 4m = 0


 4.059 ton  + 7.086 ton  – 3.6 ton x ½√2– 2.6 ton – 1.6ton x 4m = 0
 11.145 ton – 2.545 – 2.6 ton – 6.4 ton = 0
 11.145 ton – 11.545 = -0.4 ≈ 0

Bidang D

Titik A

 DA = RA = 4.059 ton

Titik C

 DCkiri = RA = 4.059 ton


 DCkanan = RA – P1 x Sin 45°
= 4.059 – 3.6 x ½√2
= 4.059 – 2.545 = 1.514 ton

Titik D

 DDkiri = RA – P1 x Sin 45°


= 1.514 ton
 DDkanan = RA – P1 x Sin 45°– P2
= 1.514 – 2.6 = -1.086 ton

Titik E

 DEkiri = RA – P1 x Sin 45°– P2


= -1.086 ton
 DEkanan = RA – P1 x Sin 45°– P2 – (q x 0 m)
= -1.086 ton

Titik B

 DBkiri = RA – P1 x Sin 45°– P2 – (q x 0 m)


= -1.086 ton
 DBkanan = RA – P1 x Sin 45°– P2 – (q x 3 m) + RB
= -1.086 ton – (1.6 x 3m) + 7.086

= -1.086 ton – 4.8 ton + 7.086 ton = 1.2 ton

Titik F

 DFkanan = [RA – P1 x Sin 45°– P2 – (q x 3 m) + RB]– (q x 1 m)


= 1.2 ton – 1.6 ton

= -0.4 ≈ 0

Bidang D

Titik A

MA = 0

Titik C

MC = RA x 1½m


= 4.059 ton x 1½m = 6.088 tm

Titik D

MD = RA x 3½m – P1 x Cos 45° x 2m


= 4.059 ton x 3½m – 3.6 x ½√2 x 2m
= 14.206 – 5.090 = 9.116 tm
Titik E

ME = RA x 6½m – P1 x Cos 45° x 5m – P2 x 3m


= 4.059 ton x 6½m – 3.6 x ½√2 x 5m – 2.6 x 3m
= 26.383 – 12.726 – 7.8 = 5.857 tm

Titik G

MG = RA x (6½+ X) – P1 x Cos 45° x (5 + X) – P2 x (3 + X) – ½qX2


= 6½RA + XRA – 3.6 x ½√2 x (5 + X) – 2.6 x (3 + X) – ½ x 1.6 x X2
= 6½ x 4.059+ X x 4.059– 12.726 + 2.545X – 7.8 + 2.6X – 0.8X2
= 26.383+ 4.059X– 12.726 + 2.545X – 7.8 + 2.6X – 0.8X2
= 5.857+ 9.204X– 0.8X2
a = -0.8 ; b = 9.204 ; c = 5.857

X1 =  -0.604
X2 =  12.109 karena > 4 m maka X2 tidak dipakai.

= 5.857 + (9.204 x (-0.604)) – 0.8 (-0.6042)


= 5.857 – 5.559 – 0.292 ≈ 0

Titik B

MB = RA x 9½m – P1 x Cos 45° x 8m – P2 x 6m – (q x 3m x 1½)


= 4.059 x 9½m – 3.6 x ½√2 x 8m – 2.6 x 6m – (1.6 x 3m x 1½)
= 38.560 – 20.361 – 15.6 – 7.2
= -4.601

You might also like