::Annual Development Programme (ADP)::

ADP Project name Total Exp Prev Current Project type


Ref cost upto yr yr alloc
No prev alloc
yr
1 Dhaka - Chittagong Highway- 4 Laning (PD,s Office) 381, 303, 76, 40,179 Impr/Rehab of
[05158] (On-Going Project) (Revised Approved) (01/ 694 748 620 roads
01/06-30/06/17)
2 Construction of 3 (Three) Bridges at Khepupara, 18, 15, 840 2,168 Construction of
Hazipur and Mohipur on Patuakhali-Kuakata Road. 214 415 New Bridges
[07129] (On-Going Project) (Revised Approved) (01/
01/09-30/06/17) (Bridge length:1782.49 m)
3 Gazipur- Azmatpur- Itakhola Road [01135] (On-Going 22, 19, 4,500 3,349 Construction of
Project) (Revised Approved) (01/07/00-30/06/17) 755 400 New Roads
(Road length:40.70 Km)
4 3rd Karnaphuly Bridge [03132] (On-Going Project) 79, 47, 1,168 3,233 Construction of
(Revised Approved) (01/07/02-31/12/19) 794 824 New Bridges
5 Widening (including Divider) of Chittagong- 22, 12, 7,000 6,200 Construction of
Rangamati National Highway Chittagong (Oxygen 599 850 New Roads
Moor)-Hathazari Portion [07235] (On-Going Project)
(Approved) (01/07/09-30/06/17) (Road length:12.60
Km)
6 Development of Baburhat-Matlob-Pennai Road (2nd 13, 9,816 3,000 2,951 Construction of
Phase) [07236] (On-Going Project) (Approved) (01/ 434 New Roads
07/09-30/06/17)
7 Improvement of Rikabazar-Rampal-Dighirpar- 8,017 3,841 1,600 1,960 Reconstruction
Banglabazar-Munshigonj Sadar-Nayagaon-Mukterpur of Bridge
Road (With link to Nayagaon Hospital Link Road)
[07242] (On-Going Project) (Revised Approved) (01/
07/09-30/06/17)
8 Joydebpur - Mymensingh Road Improvement Project 181, 177, 22, 3,942 Construction of
(JMRIP) PD (Part) [07278] (On-Going Project) 512 212 995 New Roads
(Revised Approved) (01/07/10-30/06/17)
9 Construction of Baniachong - Nabigonj Road ( Z- 5,160 4,342 800 594 Construction of
2405) [07265] (On-Going Project) (Approved) (01/07/ New Roads
10-30/06/17) (Road length:18.00 Km)
10 Improvement of Signboard - Morrelgonj - Rayenda - 9,040 9,040 3,570 1 Construction of
Sarankhola - Bogie Road as a Regional Highway New Roads
[07266] (On-Going Project) (Revised Unapproved)
(01/07/10-30/06/16)
11 Improvement of Assasuni - Paikgacha - Road 10, 3,270 1,500 2,000 Construction of
including Consraction of Manikkhali Bridge [07267] 882 New Bridges
(On-Going Project) (Revised Unapproved) (01/07/10-
30/06/19)
12 Improvement of Goalando - Faridpur - Tarail Road. 7,896 5,570 1,600 1,660 Construction of
[07269] (On-Going Project) (Approved) (01/07/10-30/ New Roads
06/17)
13 Improvement of Bajunia - Gandhasur - Satpar - 9,957 7,115 1,000 2,500 Construction of
Hatiara - Ramdia Road including Ramdia Bazar By - New Roads
Pass Road. [07270] (On-Going Project) (Revised
Approved) (01/07/10-30/06/17)
14 Construction of Dirai - Sulla Portion of Madanpur - 11, 8,538 2,000 650 Construction of
Dirai - Sulla Road. [07275] (On-Going Project) 991 New Roads
(Approved) (01/07/10-30/06/17)
15 Construction of Satkhira Town Bypass with link to 18, 8,927 377 1,500 Construction of
Bhomra Land Port. [07286] (On-Going Project) 350 New Roads
(Approved) (01/08/10-30/06/19)
ADP Project name Total Exp Prev Current Project type
Ref cost upto yr yr alloc
No prev alloc
yr
16 The 3rd Shitalakhya Bridge Construction Project at 59, 11, 7,921 6,120 Construction of
Bandar Upazila, Narayangonj [07292] (On-Going 928 615 New Bridges
Project) (Approved) (01/11/10-30/06/21)
17 Construction of Baniachong - Azmirigonj Road. 11, 3,400 1,000 1,750 Construction of
[07295] (On-Going Project) (Approved) (01/12/10-30/ 600 New Roads
06/19)
18 Char Fassion - Char Manika- Baburhat Launchghat 5,786 5,268 775 310 Construction of
Road. [07298] (On-Going Project) (Approved) (01/07/ New Roads
10-31/12/16)
19 Nakla-Nalitabari-Nakugaon Land Port Road. [07306] 23, 17, 7,500 3,050 Construction of
(On-Going Project) (Revised Approved) (01/01/11- 955 685 New Roads
30/06/17)
20 Improvement of Uzanchar- Bajitpur-Austagram 17, 14, 5,920 1,250 Construction of
(Bajitpur-Austagram Portion) Road (Z-3601). [07309] 965 620 New Roads
(On-Going Project) (Approved) (01/01/11-31/12/18)
(Road length:20.00 Km, Bridge length:0.00 m)
21 Improvement of Kishoreganj-Karimganj-Chamraghat- 13, 6,900 850 300 Construction of
Mithamain Road (Chamraghat(Niamatpur)-Balikhola- 253 New Roads
Mithamoin Portion) Road. (Z-3603). [07310] (On-
Going Project) (Revised Approved) (01/01/11-30/06/
19) (Road length:37.00 Km, Bridge length:0.00 m)
22 Upgrading of JHenaidah- Chuadanga-Meherpur- 28, 8,474 2,110 2,000 Construction of
Mujibnagar Road. [07314] (On-Going Project) 675 New Roads
(Revised Unapproved) (01/01/11-31/12/18)
23 Development of Balia-Warsi-Mirzapur Road. [07317] 11, 8,725 2,200 1,410 Construction of
(On-Going Project) (Revised Approved) (01/01/11- 167 New Roads
30/06/17)
24 Construction of 4-Laning to Madaripur(Mostafapur)- 19, 5,250 2,500 7,131 Construction of
Shariatpur Road Via Kazirtack Bridge [07322] (On- 178 New Roads
Going Project) (Approved) (01/02/11-30/06/18)
25 Construction of Kushtia Town Bypass Road (Project 10, 2,131 2,000 4,000 Impr/Rehab of
Code No. 5171) [07324] (On-Going Project) (Revised 960 roads
Approved) (01/01/11-30/06/19) (Road length:6.60
Km, Bridge length:54.90 m)
26 Improvement of Itna-Baraibari-Chamraghat (Z-3623) 10, 7,670 1,370 150 Construction of
[07331] (On-Going Project) (Revised Approved) (01/ 867 New Roads
07/11-30/06/17) (Road length:19.00 Km, Bridge
length:0.00 m)
27 Development of Tecknaf Shahpuri Deep Road 2,011 0 1 1,822 Construction of
Project. [07333] (On-Going Project) (Revised New Roads
Unapproved) (01/07/11-30/06/17) (Road length:0.00
Km, Bridge length:0.00 m)
28 Constraction of Birishiri-Bijoypur Land Port Road with 8,061 5,200 3,000 1,289 Construction of
Madupara Link. [07338] (On-Going Project) (Revised New Roads
Unapproved) (01/01/12-30/06/17) (Road length:0.01
Km, Bridge length:0.00 m)
29 Construction of Border (Hatipagar-Sandhakura- 10, 6,000 5,500 2,125 Construction of
Dhanua-kamalpur) Road (Z-2814). [07339] (On-Going 753 New Roads
Project) (Approved) (01/01/12-30/06/17) (Road
length:0.00 Km, Bridge length:0.00 m)
30 Construction of Paira Bridge (Lebukhali Bridge) over 144, 11, 10, 8,680 Reconstruction
the river Paira on Barisal-Patuakhali Road. [07340] 724 396 163 of Bridge
(On-Going Project) (Revised Approved) (01/04/12-
30/06/22) (Road length:0.00 Km, Bridge length:1470.
00 m)
ADP Project name Total Exp Prev Current Project type
Ref cost upto yr yr alloc
No prev alloc
yr
31 Construction / Rehabilitation of Ferries & Pontoon ( 12, 11, 567 711 Ferries
Phase -II)( Project Code-224124500) [07345] (On- 147 294
Going Project) (Approved) (01/07/17-30/06/17)
32 Construction of Khulna (Gollamari)-Batiaghata 7,904 3,638 1,125 1,000 Construction of
Dacope- Nalian Forest Road (Z-7606) [07347] (On- New Roads
Going Project) (Approved) (01/07/12-31/12/18)
33 Greater Dhaka Sustainable Urban Transport Project 426, 8,395 2,823 18,326 Construction of
(BRT Gazipur-Airport) [146] (On-Going Project) 832 New Roads
(Revised Approved) (01/12/12-30/06/22)
34 SASEC Road Connectivity Project Improvement of 621, 92, 59, 62,016 Construction of
Joydevpur-Chandra-Tangail-Elanga Road (N-4) to a 4- 441 524 000 New Roads
Lane Highway [0148] (On-Going Project) (Approved)
(01/04/13-30/06/21)
35 The Kanchpur, Meghna and Gumti 2nd Bridge 848, 87, 77, 78,906 Construction of
Construction and Existing Bridges Rehabilitation 694 487 757 New Bridges
Project [0149] (On-Going Project) (Approved) (01/04/
13-31/10/21)
36 Construction of Shasongacha Railway Overpass in 9,406 3,300 3,000 1,675 Construction of
Comilla City. [0153] (On-Going Project) (Approved) New Roads
(01/07/13-30/06/18) (Road length:0.00 Km, Bridge
length:0.00 m)
37 Construction of Railway Overpass on Mourail Rail 7,955 3,750 1,700 2,000 Construction of
Crossing in Brahmanbaria Town. [0154] (On-Going New Roads
Project) (Approved) (01/07/13-30/06/18) (Road
length:0.00 Km, Bridge length:0.00 m)
38 Improvement of Rajapur-Kathalia-Amua-Bamna- 4,557 2,500 900 980 Construction of
Patharghata Road 32 K.M Amua Bishkhali River 217. New Bridges
68 miter P.C Gader Birdge [0155] (On-Going Project)
(Approved) (01/06/13-30/06/17)
39 Improvement of 2(Two) Nos. Road of Greater 9,506 7,400 4,800 500 Construction of
Mymenshing District . [0156] (On-Going Project) New Roads
(Approved) (01/07/13-30/06/17)
40 Construction of Dhaka-Sylhet Highway Road 4-Lane 35, 5,036 4,471 6,730 Construction of
Bhulta Flyover. [0160] (On-Going Project) (Approved) 337 New Bridges
(01/07/13-30/06/20) (Road length:0.00 Km, Bridge
length:0.00 m)
41 Improvement of Naogan-Badalgachi-Potnitola Road 6,791 4,300 3,000 2,222 Reconstruction
& Construction of Mohadebpur Badalgachi Bridge. of Bridge
[0161] (On-Going Project) (Approved) (01/01/14-30/
06/17)
42 Construction of Potnitola-Sapahar-Rahanpur Road. 12, 6,557 4,248 5,500 Construction of
[0164] (On-Going Project) (Approved) (01/01/14-30/ 786 New Roads
06/17)
43 Construction of Shaid Monsur Ali (Pipulbaria- 6,794 4,950 3,700 1,844 Construction of
Sonamukhi-Dhunot Road. [0165] (On-Going Project) New Roads
(Approved) (01/01/14-30/06/17) (Road length:0.00
Km, Bridge length:0.00 m)
44 Construction of Dohar-katakhali-Nikdra-Galimpur-T 4,803 2,150 1,400 2,424 Construction of
korpur Road. [0166] (New Project) (Approved) (01/ New Roads
01/14-31/12/16)
45 Construction of Joynal Abedin Bhuiyan Road 5,039 3,885 2,885 1,016 Construction of
Dolotgonj(Laksam)-Langalcote-kodalia-Dalua-Chioda New Roads
Bazar Road [0168] (New Project) (Approved) (01/01/
14-31/12/16)
ADP Project name Total Exp Prev Current Project type
Ref cost upto yr yr alloc
No prev alloc
yr
46 Construction of Bridge over Kushiara River at 15, 0 1 3,200 Construction of
Raniganj in Pagla - Jagannathpur - Raniganj - 541 New Bridges
Auskandi Highway [0172] (On-Going Project)
(Revised Unapproved) (01/07/14-30/06/20) (Road
length:0.00 Km, Bridge length:0.00 m)
47 Construction of Bridge over Dhanagoda River (Matlab 8,784 5,500 3,000 1,500 Reconstruction
Bridge) at Matlab. [0171] (On-Going Project) of Bridge
(Approved) (01/07/14-31/12/18) (Road length:0.00
Km, Bridge length:304.51 m)
48 Improvement of Road Safety at Black Spots on 18, 6,253 5,253 10,552 Construction of
National Highways Project. [0170] (New Project) 102 New Roads
(Approved) (01/07/14-30/06/17)
49 Construction of Madan-Khaliajuri Submersible Road 9,298 2,700 2,500 4,500 Construction of
and Construction of PC Girder Bridge over Balia River New Roads
at 37th km.Netrakona -Madan-Khaliajuri Rad. [0175]
(On-Going Project) (Approved) (01/09/14-30/06/19)
50 Widening & Strenthening of Jamalpur-Madarganj 13, 2,150 2,000 1,725 Construction of
Road [0176] (On-Going Project) (Approved) (01/09/ 343 New Bridges
14-30/06/20)
51 Construction of PC Girder and RCC Bridge of RCC Box 21, 289 750 3,500 Reconstruction
Culvertes different Roads under Khagrachari Road 878 of Bridge
Division. [0177] (On-Going Project) (Approved) (01/
01/15-30/06/21)
52 Gouripur-Homna Road Comilla-sylhet Haiway 7,772 3,000 3,000 4,345 Construction of
development [0178] (New Project) (Approved) (01/ New Roads
11/14-30/06/18)
53 Construction of 93.02 m Long Nallapara PC Grider 5,463 2,000 3,000 2,642 Reconstruction
Bridge over Alenjany River at 12th km of Pakulla- of Bridge
Delduar-Elasin Road (Z-4015) and Construction of
2Nos. PC Girder Bridge on Balia-Warsi-Mirzapur Raod
(Z-5061) [0179] (New Project) (Approved) (01/10/14-
30/06/17)
54 Construction of Itna-Mithamain-Austogram Road 87, 6,000 6,000 17,418 Construction of
Project [0180] (On-Going Project) (Approved) (01/01/ 408 New Roads
15-30/06/21)
55 Mogbari-Bagmara-Butshi-Bangdda road project 1,918 1,700 1,700 202 Construction of
[0181] (New Project) (Approved) (01/01/15-30/06/ New Roads
17)
56 Construction of Romari-Tura Land Bandar Road. 3,451 1,200 1,200 2,084 Construction of
[0182] (New Project) (Approved) (01/03/15-30/06/ New Roads
17)
57 Improvement of Airport Bypass-Itersection-Lalbag- 62, 4,500 4,500 6,000 Construction of
Salutikor-Companyganj-Bholaganj Road as National 693 New Roads
Highway Project [0183] (On-Going Project)
(Approved) (01/03/15-30/06/21)
58 Construction of Jamalpur Town Bypass Road 5,384 1,500 1,500 3,884 Construction of
Including Widening & Strengthening of Jamalpur- New Roads
Islampur-Dewanganj Road from ch. 30+000 to
39+000. [0188] (New Project) (Approved) (01/03/15-
30/06/18)
59 Gazipur-Azmatpur-Itakhola Road Charshindur 13, 3,487 3,487 3,500 Construction of
Shitallakha River project [0189] (New Project) 371 New Bridges
(Approved) (01/03/15-30/06/18)
60 Construction of Mohipal Flyover Project, Feni [0191] 18, 6,000 6,000 6,500 Construction of
(New Project) (Approved) (01/04/15-30/06/18) 148 New Roads
ADP Project name Total Exp Prev Current Project type
Ref cost upto yr yr alloc
No prev alloc
yr
61 Development of Dinajpur-Birol-Pakura- 7,115 1,600 1,600 3,000 Construction of
Radhikapur(Birol Land Port) Road [0190] (New New Roads
Project) (Approved) (01/03/15-30/06/18)
62 Construction of 478.171m Long PC Girder Bridge at 7,498 2,800 2,800 2,000 Construction of
6th km (Gap No. 6/1) over Choto Feni River at New Bridges
Sonagazi Olamabazar-Chardarbeshpur-Companigonj
Road. [0192] (On-Going Project) (Approved) (01/04/
15-30/06/19)
63 Development of Matlab-Meghna-Dhonaghoda- 2,638 700 700 1,894 Impr/Rehab of
Beriband Roads Project (Z-1069) [0230] (New roads
Project) (Approved) (01/07/15-30/06/17)
64 Development of Godagari-Amnura-Nacholel- 6,249 1,200 1,200 4,926 Construction of
Parbotipur-Adda Road(Road No.Z-6813) [0193] (New New Roads
Project) (Approved) (01/07/15-30/06/17)
65 Improvement of Lalmai-Barura-Jalam-Adda- 2,853 1,300 1,300 1,545 Construction of
Jogotpur(Lalmai-Jalam-Adda Portion) Road. [0194] New Roads
(New Project) (Approved) (01/07/15-30/06/17)
66 Development of Kashba-Kuti Road [0195] (New 2,506 1,000 1,000 1,501 Construction of
Project) (Approved) (01/07/15-30/06/17) (Road New Roads
length:0.00 Km, Bridge length:0.00 m)
67 Improvement of District Road (Dhaka Zone) [07232] 10, 9,996 10, 923 Construction of
(New Project) (Approved) (01/03/15-30/06/17) 923 000 New Roads
(Road length:639.26 Km)
68 Improvement of District Road (Mymensingh Zone) 10, 6,000 6,000 4,743 Construction of
[0186] (New Project) (Approved) (01/03/15-30/06/ 971 New Roads
17)
69 Improvement of District Road (Chittagong Zone) 11, 5,500 5,500 5,495 Construction of
[07228] (New Project) (Approved) (01/03/15-30/06/ 169 New Roads
17) (Road length:803.54 Km)
70 Improvement of District Road (Comilla Zone) [07230] 11, 6,013 6,000 5,006 Construction of
(New Project) (Approved) (01/03/15-30/06/17) 006 New Roads
(Road length:527.31 Km)
71 Improvement of District Road (Sylhet Zone) [07229] 10, 3,000 3,000 6,982 Construction of
(New Project) (Approved) (01/03/15-30/06/17) 307 New Roads
(Road length:324.18 Km)
72 Improvement of Important Regional Highways to 79, 6,855 6,855 3,931 Impr/Rehab of
Approriate Level of Standard and Width (Mymenshing 815 roads
Zone) [0267] (On-Going Project) (Approved) (01/03/
17-30/06/21)
73 Improvement of District Road (Barisal Zone) [07226] 11, 4,220 4,220 6,830 Construction of
(New Project) (Approved) (01/03/15-30/06/17) 272 New Roads
(Road length:762.60 Km)
74 Improvement of Distric Road (Gopalgonj Zone) [0187] 10, 4,500 4,500 5,403 Construction of
(New Project) (Approved) (01/03/15-30/06/17) 506 New Roads
75 Improvement of District Road ( Rajshahi Zone) 10, 5,675 5,675 5,303 Construction of
[07227] (New Project) (Approved) (01/03/15-30/06/ 978 New Roads
17) (Road length:612.34 Km)
76 Improvement of District Road (Rangpur Zone) 10, 6,000 6,000 4,380 Construction of
[07223] (New Project) (Approved) (01/03/15-30/06/ 784 New Roads
17) (Road length:444.79 Km)
77 Constraction of Teknaf-Ramu-Garisan-Marisha- 6,049 2,336 2,336 3,713 Impr/Rehab of
Palang Link Road [0184] (New Project) (Approved) roads
(01/07/15-30/06/17)
78 Boktarmunshi-Kazirhat-Daganbhuiyan Road 11th k. 1,674 500 500 1,174 Construction of
ADP Project name Total Exp Prev Current Project type
Ref cost upto yr yr alloc
No prev alloc
yr
m. choto river 94.31 meter PC Garder River Project. New Bridges
[0198] (New Project) (Approved) (01/07/15-30/06/
17)
79 Construction of Bangladesh-Mayanmar Maitri Sarak 7,965 7,270 7,270 526 Construction of
(Balukhali-Gunduni Border Road. [0200] (New Project) New Roads
(Approved) (01/07/15-30/06/18)
80 Construction of Sarnamoti Bridge at 20th km of 1,763 500 500 820 Construction of
National Highway Barabari-Lalmonirhat-Burimary New Bridges
Road (N-509) [0197] (New Project) (Approved) (01/
07/15-30/06/18)
81 Widening and Strengthening of Bangaon-Nunni- 6,366 1,000 1,000 2,500 Construction of
Hatipagar Road [0217] (New Project) (Approved) (01/ New Roads
10/15-30/06/18)
82 Construction of Coxbazar-Teknaf Merin Drive Road 45, 17, 17, 22,232 Construction of
Project-3th (ShilKhali to Teknaf) [0218] (New Project) 582 074 074 New Roads
(Approved) (01/07/15-30/06/18)
83 Khulna (Rupsha)-Srifaltala-Terokhada Road [0201] 4,861 100 100 4,000 Construction of
(New Project) (Approved) (01/07/15-30/06/18) New Roads
84 Improvement of Chittagong(Nazirhat)-Maizbhander 3,581 550 550 1,500 Construction of
Road (Z-1620) [0202] (New Project) (Approved) (01/ New Roads
09/15-30/06/18)
85 Construction of Matarbari Coal based Power Plant 65, 610 610 909 Construction of
Connecting Road. [0206] (On-Going Project) 998 New Roads
(Approved) (01/07/15-30/06/22)
86 Development of Sonapur (Noakhali)-Sonagazi(Feni)- 29, 3,500 3,500 7,000 Construction of
Zorargonj (Chittagong) Road Project. [0203] (On- 305 New Roads
Going Project) (Revised Unapproved) (01/09/15-30/
06/21)
87 Improvement of western Bangladesh Bridge Project 291, 2,740 2,928 4,434 Construction of
[0207] (On-Going Project) (Approved) (01/10/15-30/ 175 New Bridges
06/22)
88 Project of Curve straightening from Indrapool to 10, 0 1 1,800 Construction of
Chakrashala over Dhaka-Chittagong-CoxsBazar 358 New Roads
National Highway [0204] (On-Going Project)
(Approved) (01/01/16-30/06/19)
89 Consrtuction of Bakergonj-Padrishibpur-kathaltoli- 12, 40 40 3,900 Construction of
subidkhali-barguna road strangjening project [0205] 762 New Roads
(On-Going Project) (Approved) (01/07/15-30/06/19)
90 Development of Nilphamari-Jaldhaka Road Project 6,634 10 10 1,800 Construction of
[0208] (On-Going Project) (Approved) (01/01/16-31/ New Roads
12/18)
91 Faridpur(Badarpur)-Saltha-Soanapur-Muksudpur 12, 200 200 3,000 Construction of
Road Improvement Project. [0209] (On-Going Project) 286 New Roads
(Approved) (01/01/16-30/06/20)
92 Construction of Inter District Border Road: 55, 0 1 1 Construction of
Mymenshing & Netrakona District Portion Project 957 New Roads
[0210] (On-Going Project) (Approved) (01/01/16-31/
12/21)
93 Construction of 282.558 Meter Long PC Girder Bridge 4,371 0 1 250 Construction of
over the Banar River at 72th Km of Mymensingh- New Bridges
Gafforgaon-Toke Road [0211] (On-Going Project)
(Approved) (01/10/15-30/06/19)
94 Improvement of Faridpur(Maijkandi)-Boalmari- 23, 0 1 1,000 Construction of
Gopalganj(Bhatiapara) Road including Sasrail- 964 New Roads
ADP Project name Total Exp Prev Current Project type
Ref cost upto yr yr alloc
No prev alloc
yr
Alphadanga-Kashiyani Link Road [0212] (On-Going
Project) (Approved) (01/04/16-30/06/21)
95 Support to Joydevpur-Debgram-Bhulta-Madanpur 23, 0 1 5,000 Construction of
Road (Dhaka By Payss) [0213] (On-Going Project) 650 New Roads
(Approved) (01/03/16-30/06/21)
96 Improvement and widening of Bhurghata-Barisal to 12, 0 1 3,500 Construction of
Labukhali Bridge of the National Highway N-8 [0214] 159 New Roads
(New Project) (Approved) (01/07/15-30/06/18)
97 Improvement of Sylhet-Sunamgonj Road. [0220] (On- 16, 0 0 300 Construction of
Going Project) (Approved) (01/01/16-30/06/21) 087 New Roads
98 Construction of Ruma-Bogalek-keokradang road 8,998 0 0 6,400 Construction of
[0221] (New Project) (Approved) (01/03/16-30/06/ New Roads
18) (Road length:0.02 Km, Bridge length:0.00 m)
99 Construction of Shibalay-Nayarkandi-Balla- 2,717 0 0 500 Construction of
Harirampur road Project(Z-5066) [0222] (New Project) New Roads
(Approved) (01/01/16-30/06/18)
100 Widening and Development of Gaibandha-Fulchari- 6,476 0 0 816 Construction of
Bharatkhali-Saghata Road(Z-5522) [0223] (New New Roads
Project) (Approved) (01/03/16-30/06/19) (Road
length:0.00 Km, Bridge length:0.00 m)
101 Construction of 219.456 m I long Shahbazpur Bridge 6,828 0 0 6 Construction of
and at 92nd of Dhaka-Sylhet National Highway New Bridges
[0224] (On-Going Project) (Approved) (01/04/16-30/
06/20)
102 Widening of Sadullahpur-Pirgonj-Nawabgonj District 10, 0 0 1,500 Construction of
Highways Road. [0225] (New Project) (Approved) 338 New Roads
(01/02/16-30/06/19)
103 Construction of Barotakia (Abu Torab) to Mirersarail 18, 0 0 3,700 Construction of
EPZ Link Road. [0226] (On-Going Project) (Approved) 390 New Roads
(01/05/16-30/06/21)
104 Widening of Dinajpur-Chirirbondor-Parbatipur 4,527 0 0 2,000 Impr/Rehab of
Road(Z-5025) [0227] (New Project) (Approved) (01/ roads
04/16-30/06/18)
105 Cross- Border Road Network Improvement Project 368, 0 0 6,500 Construction of
(Bangladesh) [0228] (On-Going Project) (Approved) 455 New Roads
(01/05/16-30/06/22) (Road length:0.00 Km, Bridge
length:0.00 m)
106 Widening of Ramnagar Mor to Abalpur of in Magura 11, 0 0 1,848 Impr/Rehab of
Town on National Highway N-7. [0229] (On-Going 207 roads
Project) (Approved) (01/04/16-30/06/21)
107 Improvement of Jatrabari Intersection (Including 689, 39, 39, 265,198 Construction of
Equria-Babubazar Link Road) to Patchchar-Bhanga 205 738 738 New Bridges
Through Mawa Road of Dhaka-Khulna (N-8) Highway
to 4 Lane with Separate Lane for Slow Moving
Vehicle [0219] (New Project) (Approved) (01/03/16-
30/06/20)
108 Straightening of dangerous curves at Sonapur- 2,371 0 0 1,100 Impr/Rehab of
Kabirhat-Companigonj(Bashurhat)-Dagonbhuiyan roads
Road. [0233] (New Project) (Approved) (01/07/16-
30/06/19)
109 Improvement of Chandpur-Nanupur-Chandra- 2,491 0 0 1,500 Impr/Rehab of
Kamtabazar-Ramganj Road (Z-1412) remaining part roads
(Chandpur Part) [0231] (New Project) (Approved)
(01/07/16-30/06/18)
ADP Project name Total Exp Prev Current Project type
Ref cost upto yr yr alloc
No prev alloc
yr
110 Development Project for Construction of 44.02m long 3,535 0 0 1,200 Impr/Rehab of
Sachar bridge & 4 R.C.C Culverts with curve roads
straightening at Gouripur-Kachua-Hajiganj Road
[0232] (New Project) (Approved) (01/07/16-30/06/
18)
111 Widening of Pavement with Mediams of main Road in 6,992 0 0 100 Impr/Rehab of
Nator Town from Harispur Bypass mor to roads
Bonbelgoria Bypass mor. [0234] (On-Going Project)
(Approved) (01/07/16-30/06/21)
112 Improvement of Panchdona-Danga-Ghorashal Zilla 93, 0 0 1 Construction of
Highways into 4-lane Highway with one layer lowered 763 New Roads
both side separate service lane (Including Danga
Bazar-Islampur link Road) [0240] (On-Going Project)
(Approved) (01/07/17-30/06/22)
113 Construction of Jhenaidah-Harinakundu Road and 4,259 0 0 100 Construction of
Circuit House Link Road [0241] (New Project) New Roads
(Approved) (01/04/16-30/06/18)
114 Construction of Piarpur Bridge at 6th Km. and 3,103 0 0 1,000 Construction of
Chewuakhali Bridge at 52th Km. of Lakshmipur-Char New Bridges
Alaxandar-Sonapur Road(Z-1405) [0236] (New
Project) (Approved) (01/07/16-30/06/18)
115 SASEC Raod Connectivity Project-II Improvement of 1,189, 0 0 46 Construction of
Elenga-Hatikamrul-Rangpur Road to a 4-Lane 901 New Roads
Highways. [0238] (On-Going Project) (Approved) (01/
09/16-31/08/21)
116 Improvement of Shamgonj-Jaria-Birisiri-Durgapur 31, 0 0 4,000 Construction of
Road to National Highways Standard. [0242] (On- 602 New Roads
Going Project) (Approved) (01/10/16-30/06/21)
117 Completion of Remaining Works of the Bridge over 14, 0 0 1 Reconstruction
the River Surma at Chhatak on Gobindaganj-Chhatak 247 of Bridge
Dowarabazar Road(Project Code-224086000) [0243]
(On-Going Project) (Approved) (01/07/16-30/06/21)
118 Replacement of 03 nos. Bailey Bridges (2 Bridges & 1 2,564 0 0 704 Impr/Rehab of
Culvert) & Reconstruction of 01 no. Damaged RCC roads
Bridge of Bogra-Sariakandi roads. [0235] (New
Project) (Approved) (01/01/17-30/06/19)
119 Construction of 03(Three) PC Girder Bridge at 7,009 0 0 200 Construction of
Jamalpur-Madargonj Highway [0244] (New Project) New Bridges
(Approved) (01/10/16-30/06/19)
120 Improvement of Shaheed Mayezuddin Bridge to 8,297 0 0 500 Construction of
Panchdona Intersection of Tongi-Kaligonj-Ghorashal- New Roads
Panchdona Regional Highway(R-301) into National
Highway standard [0245] (New Project) (Approved)
(01/01/16-30/06/19)
121 Replacement of Risky Bridges of Munshigonj Road 16, 0 0 1,083 Reconstruction
Division By Parmanent Concrete Bridges (Phase-1) 939 of Bridge
[0246] (On-Going Project) (Approved) (01/12/16-30/
06/20)
122 Construction of 180.373 m long PC Girder Bridge in 2,738 0 0 100 Construction of
place of Dilapidated Kalarpol-Ohidia Bridge Project New Bridges
(Z-1065) [0247] (On-Going Project) (Approved) (01/
01/17-30/06/21)
123 Improvement of Cyclone Roanu Affacted Kutubdia- 4,994 0 0 1 Construction of
Azam District Highway (Z-1076) & Ektabazar- New Roads
Paharchanda-Pekuabazar-Mognamaghat District
ADP Project name Total Exp Prev Current Project type
Ref cost upto yr yr alloc
No prev alloc
yr
Highway (Z-1125)(Pekuabazar-Mognamaghat
Portion) [0239] (New Project) (Approved) (01/01/17-
30/06/19)
124 Construction of PC Girder Bridge over the Puna River 4,855 0 0 10 Construction of
at 46th km of Barisal-Jhalokati-Rajapur-Bhandaria- New Bridges
Pirojpur Road(R-870) [0248] (On-Going Project)
(Approved) (01/11/16-30/06/20)
125 Procurement of Equipment and Machineries for 58, 0 0 1 Impr/Rehab of
Construction, Repair and Maintenance of Road 588 roads
Infrastructure [0249] (On-Going Project) (Approved)
(01/01/17-30/06/21)
126 Road Improvement project of Zia Coloney to Airport 1,359 0 0 1,359 Construction of
gate via ISSB gate [0237] (New Project) (Approved) New Roads
(01/07/16-30/06/17)
127 Improvement of Important Regional Highways to 42, 0 0 500 Impr/Rehab of
Approriate Level of Standard and Width (Gopalganj 020 roads
Zone) [0254] (On-Going Project) (Approved) (01/03/
17-30/06/21)
128 Development of Brahmanbaria Town By-Pass from 3,809 0 0 100 Impr/Rehab of
Ramrail Bridge approch to Puniaout moor in roads
appropriate standard and width [0255] (On-Going
Project) (Approved) (01/01/17-30/06/20)
129 Construction of Alikadam-jalanipara-Kurukpata- 50, 0 0 4,000 Construction of
Powamohori Road Project(Project Code-224087300) 929 New Roads
[0253] (On-Going Project) (Approved) (01/01/17-30/
06/21)
130 Re-Construction of Mahalchari-Sindukchari-Jaliapara 2,499 0 0 2,451 Impr/Rehab of
Road 1st Phase (Jaliapara-Sindukchari) Road Project roads
[0252] (New Project) (Approved) (01/12/16-30/06/
18)
131 Improvement of Important Regional Highways to 63, 0 0 2,200 Impr/Rehab of
Approriate Level of Standard and Width (Dhaka Zone) 131 roads
[0251] (On-Going Project) (Approved) (01/03/17-30/
06/20)
132 Improvement of Important Regional Highways to 59, 0 0 0 Construction of
Approriate Level of Standard and Width (Rangpur 810 New Roads
Zone) [0256] (New Project) (Approved) (01/03/17-
31/12/19)
1 Technical Assistance for Detail Study & Design of 9,788 5,248 2,460 2,195 Other
Dhaka-Chittagong Express way on PPP Basis [05190]
(On-Going Project) (Approved) (01/03/13-30/06/19)
(Road length:0.00 Km, Bridge length:0.00 m)
2 Technical Assistant for Sub Rigional Road Transport 7,351 50 50 606 Other
Project Preparetri Fasility-II (SRTPPF-II) [0196] (On-
Going Project) (Approved) (01/07/15-31/12/20)
(Road length:0.00 Km, Bridge length:0.00 m)
3 Development of Bridge Management Capacity Project 3,108 0 0 1,505 Other
[0250] (New Project) (Approved) (01/09/15-31/12/
18)