ADP Project name Total Exp Prev Current Project type
Ref cost upto yr yr alloc No prev alloc yr 1 Dhaka - Chittagong Highway- 4 Laning (PD,s Office) 381, 303, 76, 40,179 Impr/Rehab of [05158] (On-Going Project) (Revised Approved) (01/ 694 748 620 roads 01/06-30/06/17) 2 Construction of 3 (Three) Bridges at Khepupara, 18, 15, 840 2,168 Construction of Hazipur and Mohipur on Patuakhali-Kuakata Road. 214 415 New Bridges [07129] (On-Going Project) (Revised Approved) (01/ 01/09-30/06/17) (Bridge length:1782.49 m) 3 Gazipur- Azmatpur- Itakhola Road [01135] (On-Going 22, 19, 4,500 3,349 Construction of Project) (Revised Approved) (01/07/00-30/06/17) 755 400 New Roads (Road length:40.70 Km) 4 3rd Karnaphuly Bridge [03132] (On-Going Project) 79, 47, 1,168 3,233 Construction of (Revised Approved) (01/07/02-31/12/19) 794 824 New Bridges 5 Widening (including Divider) of Chittagong- 22, 12, 7,000 6,200 Construction of Rangamati National Highway Chittagong (Oxygen 599 850 New Roads Moor)-Hathazari Portion [07235] (On-Going Project) (Approved) (01/07/09-30/06/17) (Road length:12.60 Km) 6 Development of Baburhat-Matlob-Pennai Road (2nd 13, 9,816 3,000 2,951 Construction of Phase) [07236] (On-Going Project) (Approved) (01/ 434 New Roads 07/09-30/06/17) 7 Improvement of Rikabazar-Rampal-Dighirpar- 8,017 3,841 1,600 1,960 Reconstruction Banglabazar-Munshigonj Sadar-Nayagaon-Mukterpur of Bridge Road (With link to Nayagaon Hospital Link Road) [07242] (On-Going Project) (Revised Approved) (01/ 07/09-30/06/17) 8 Joydebpur - Mymensingh Road Improvement Project 181, 177, 22, 3,942 Construction of (JMRIP) PD (Part) [07278] (On-Going Project) 512 212 995 New Roads (Revised Approved) (01/07/10-30/06/17) 9 Construction of Baniachong - Nabigonj Road ( Z- 5,160 4,342 800 594 Construction of 2405) [07265] (On-Going Project) (Approved) (01/07/ New Roads 10-30/06/17) (Road length:18.00 Km) 10 Improvement of Signboard - Morrelgonj - Rayenda - 9,040 9,040 3,570 1 Construction of Sarankhola - Bogie Road as a Regional Highway New Roads [07266] (On-Going Project) (Revised Unapproved) (01/07/10-30/06/16) 11 Improvement of Assasuni - Paikgacha - Road 10, 3,270 1,500 2,000 Construction of including Consraction of Manikkhali Bridge [07267] 882 New Bridges (On-Going Project) (Revised Unapproved) (01/07/10- 30/06/19) 12 Improvement of Goalando - Faridpur - Tarail Road. 7,896 5,570 1,600 1,660 Construction of [07269] (On-Going Project) (Approved) (01/07/10-30/ New Roads 06/17) 13 Improvement of Bajunia - Gandhasur - Satpar - 9,957 7,115 1,000 2,500 Construction of Hatiara - Ramdia Road including Ramdia Bazar By - New Roads Pass Road. [07270] (On-Going Project) (Revised Approved) (01/07/10-30/06/17) 14 Construction of Dirai - Sulla Portion of Madanpur - 11, 8,538 2,000 650 Construction of Dirai - Sulla Road. [07275] (On-Going Project) 991 New Roads (Approved) (01/07/10-30/06/17) 15 Construction of Satkhira Town Bypass with link to 18, 8,927 377 1,500 Construction of Bhomra Land Port. [07286] (On-Going Project) 350 New Roads (Approved) (01/08/10-30/06/19) ADP Project name Total Exp Prev Current Project type Ref cost upto yr yr alloc No prev alloc yr 16 The 3rd Shitalakhya Bridge Construction Project at 59, 11, 7,921 6,120 Construction of Bandar Upazila, Narayangonj [07292] (On-Going 928 615 New Bridges Project) (Approved) (01/11/10-30/06/21) 17 Construction of Baniachong - Azmirigonj Road. 11, 3,400 1,000 1,750 Construction of [07295] (On-Going Project) (Approved) (01/12/10-30/ 600 New Roads 06/19) 18 Char Fassion - Char Manika- Baburhat Launchghat 5,786 5,268 775 310 Construction of Road. [07298] (On-Going Project) (Approved) (01/07/ New Roads 10-31/12/16) 19 Nakla-Nalitabari-Nakugaon Land Port Road. [07306] 23, 17, 7,500 3,050 Construction of (On-Going Project) (Revised Approved) (01/01/11- 955 685 New Roads 30/06/17) 20 Improvement of Uzanchar- Bajitpur-Austagram 17, 14, 5,920 1,250 Construction of (Bajitpur-Austagram Portion) Road (Z-3601). [07309] 965 620 New Roads (On-Going Project) (Approved) (01/01/11-31/12/18) (Road length:20.00 Km, Bridge length:0.00 m) 21 Improvement of Kishoreganj-Karimganj-Chamraghat- 13, 6,900 850 300 Construction of Mithamain Road (Chamraghat(Niamatpur)-Balikhola- 253 New Roads Mithamoin Portion) Road. (Z-3603). [07310] (On- Going Project) (Revised Approved) (01/01/11-30/06/ 19) (Road length:37.00 Km, Bridge length:0.00 m) 22 Upgrading of JHenaidah- Chuadanga-Meherpur- 28, 8,474 2,110 2,000 Construction of Mujibnagar Road. [07314] (On-Going Project) 675 New Roads (Revised Unapproved) (01/01/11-31/12/18) 23 Development of Balia-Warsi-Mirzapur Road. [07317] 11, 8,725 2,200 1,410 Construction of (On-Going Project) (Revised Approved) (01/01/11- 167 New Roads 30/06/17) 24 Construction of 4-Laning to Madaripur(Mostafapur)- 19, 5,250 2,500 7,131 Construction of Shariatpur Road Via Kazirtack Bridge [07322] (On- 178 New Roads Going Project) (Approved) (01/02/11-30/06/18) 25 Construction of Kushtia Town Bypass Road (Project 10, 2,131 2,000 4,000 Impr/Rehab of Code No. 5171) [07324] (On-Going Project) (Revised 960 roads Approved) (01/01/11-30/06/19) (Road length:6.60 Km, Bridge length:54.90 m) 26 Improvement of Itna-Baraibari-Chamraghat (Z-3623) 10, 7,670 1,370 150 Construction of [07331] (On-Going Project) (Revised Approved) (01/ 867 New Roads 07/11-30/06/17) (Road length:19.00 Km, Bridge length:0.00 m) 27 Development of Tecknaf Shahpuri Deep Road 2,011 0 1 1,822 Construction of Project. [07333] (On-Going Project) (Revised New Roads Unapproved) (01/07/11-30/06/17) (Road length:0.00 Km, Bridge length:0.00 m) 28 Constraction of Birishiri-Bijoypur Land Port Road with 8,061 5,200 3,000 1,289 Construction of Madupara Link. [07338] (On-Going Project) (Revised New Roads Unapproved) (01/01/12-30/06/17) (Road length:0.01 Km, Bridge length:0.00 m) 29 Construction of Border (Hatipagar-Sandhakura- 10, 6,000 5,500 2,125 Construction of Dhanua-kamalpur) Road (Z-2814). [07339] (On-Going 753 New Roads Project) (Approved) (01/01/12-30/06/17) (Road length:0.00 Km, Bridge length:0.00 m) 30 Construction of Paira Bridge (Lebukhali Bridge) over 144, 11, 10, 8,680 Reconstruction the river Paira on Barisal-Patuakhali Road. [07340] 724 396 163 of Bridge (On-Going Project) (Revised Approved) (01/04/12- 30/06/22) (Road length:0.00 Km, Bridge length:1470. 00 m) ADP Project name Total Exp Prev Current Project type Ref cost upto yr yr alloc No prev alloc yr 31 Construction / Rehabilitation of Ferries & Pontoon ( 12, 11, 567 711 Ferries Phase -II)( Project Code-224124500) [07345] (On- 147 294 Going Project) (Approved) (01/07/17-30/06/17) 32 Construction of Khulna (Gollamari)-Batiaghata 7,904 3,638 1,125 1,000 Construction of Dacope- Nalian Forest Road (Z-7606) [07347] (On- New Roads Going Project) (Approved) (01/07/12-31/12/18) 33 Greater Dhaka Sustainable Urban Transport Project 426, 8,395 2,823 18,326 Construction of (BRT Gazipur-Airport) [146] (On-Going Project) 832 New Roads (Revised Approved) (01/12/12-30/06/22) 34 SASEC Road Connectivity Project Improvement of 621, 92, 59, 62,016 Construction of Joydevpur-Chandra-Tangail-Elanga Road (N-4) to a 4- 441 524 000 New Roads Lane Highway [0148] (On-Going Project) (Approved) (01/04/13-30/06/21) 35 The Kanchpur, Meghna and Gumti 2nd Bridge 848, 87, 77, 78,906 Construction of Construction and Existing Bridges Rehabilitation 694 487 757 New Bridges Project [0149] (On-Going Project) (Approved) (01/04/ 13-31/10/21) 36 Construction of Shasongacha Railway Overpass in 9,406 3,300 3,000 1,675 Construction of Comilla City. [0153] (On-Going Project) (Approved) New Roads (01/07/13-30/06/18) (Road length:0.00 Km, Bridge length:0.00 m) 37 Construction of Railway Overpass on Mourail Rail 7,955 3,750 1,700 2,000 Construction of Crossing in Brahmanbaria Town. [0154] (On-Going New Roads Project) (Approved) (01/07/13-30/06/18) (Road length:0.00 Km, Bridge length:0.00 m) 38 Improvement of Rajapur-Kathalia-Amua-Bamna- 4,557 2,500 900 980 Construction of Patharghata Road 32 K.M Amua Bishkhali River 217. New Bridges 68 miter P.C Gader Birdge [0155] (On-Going Project) (Approved) (01/06/13-30/06/17) 39 Improvement of 2(Two) Nos. Road of Greater 9,506 7,400 4,800 500 Construction of Mymenshing District . [0156] (On-Going Project) New Roads (Approved) (01/07/13-30/06/17) 40 Construction of Dhaka-Sylhet Highway Road 4-Lane 35, 5,036 4,471 6,730 Construction of Bhulta Flyover. [0160] (On-Going Project) (Approved) 337 New Bridges (01/07/13-30/06/20) (Road length:0.00 Km, Bridge length:0.00 m) 41 Improvement of Naogan-Badalgachi-Potnitola Road 6,791 4,300 3,000 2,222 Reconstruction & Construction of Mohadebpur Badalgachi Bridge. of Bridge [0161] (On-Going Project) (Approved) (01/01/14-30/ 06/17) 42 Construction of Potnitola-Sapahar-Rahanpur Road. 12, 6,557 4,248 5,500 Construction of [0164] (On-Going Project) (Approved) (01/01/14-30/ 786 New Roads 06/17) 43 Construction of Shaid Monsur Ali (Pipulbaria- 6,794 4,950 3,700 1,844 Construction of Sonamukhi-Dhunot Road. [0165] (On-Going Project) New Roads (Approved) (01/01/14-30/06/17) (Road length:0.00 Km, Bridge length:0.00 m) 44 Construction of Dohar-katakhali-Nikdra-Galimpur-T 4,803 2,150 1,400 2,424 Construction of korpur Road. [0166] (New Project) (Approved) (01/ New Roads 01/14-31/12/16) 45 Construction of Joynal Abedin Bhuiyan Road 5,039 3,885 2,885 1,016 Construction of Dolotgonj(Laksam)-Langalcote-kodalia-Dalua-Chioda New Roads Bazar Road [0168] (New Project) (Approved) (01/01/ 14-31/12/16) ADP Project name Total Exp Prev Current Project type Ref cost upto yr yr alloc No prev alloc yr 46 Construction of Bridge over Kushiara River at 15, 0 1 3,200 Construction of Raniganj in Pagla - Jagannathpur - Raniganj - 541 New Bridges Auskandi Highway [0172] (On-Going Project) (Revised Unapproved) (01/07/14-30/06/20) (Road length:0.00 Km, Bridge length:0.00 m) 47 Construction of Bridge over Dhanagoda River (Matlab 8,784 5,500 3,000 1,500 Reconstruction Bridge) at Matlab. [0171] (On-Going Project) of Bridge (Approved) (01/07/14-31/12/18) (Road length:0.00 Km, Bridge length:304.51 m) 48 Improvement of Road Safety at Black Spots on 18, 6,253 5,253 10,552 Construction of National Highways Project. [0170] (New Project) 102 New Roads (Approved) (01/07/14-30/06/17) 49 Construction of Madan-Khaliajuri Submersible Road 9,298 2,700 2,500 4,500 Construction of and Construction of PC Girder Bridge over Balia River New Roads at 37th km.Netrakona -Madan-Khaliajuri Rad. [0175] (On-Going Project) (Approved) (01/09/14-30/06/19) 50 Widening & Strenthening of Jamalpur-Madarganj 13, 2,150 2,000 1,725 Construction of Road [0176] (On-Going Project) (Approved) (01/09/ 343 New Bridges 14-30/06/20) 51 Construction of PC Girder and RCC Bridge of RCC Box 21, 289 750 3,500 Reconstruction Culvertes different Roads under Khagrachari Road 878 of Bridge Division. [0177] (On-Going Project) (Approved) (01/ 01/15-30/06/21) 52 Gouripur-Homna Road Comilla-sylhet Haiway 7,772 3,000 3,000 4,345 Construction of development [0178] (New Project) (Approved) (01/ New Roads 11/14-30/06/18) 53 Construction of 93.02 m Long Nallapara PC Grider 5,463 2,000 3,000 2,642 Reconstruction Bridge over Alenjany River at 12th km of Pakulla- of Bridge Delduar-Elasin Road (Z-4015) and Construction of 2Nos. PC Girder Bridge on Balia-Warsi-Mirzapur Raod (Z-5061) [0179] (New Project) (Approved) (01/10/14- 30/06/17) 54 Construction of Itna-Mithamain-Austogram Road 87, 6,000 6,000 17,418 Construction of Project [0180] (On-Going Project) (Approved) (01/01/ 408 New Roads 15-30/06/21) 55 Mogbari-Bagmara-Butshi-Bangdda road project 1,918 1,700 1,700 202 Construction of [0181] (New Project) (Approved) (01/01/15-30/06/ New Roads 17) 56 Construction of Romari-Tura Land Bandar Road. 3,451 1,200 1,200 2,084 Construction of [0182] (New Project) (Approved) (01/03/15-30/06/ New Roads 17) 57 Improvement of Airport Bypass-Itersection-Lalbag- 62, 4,500 4,500 6,000 Construction of Salutikor-Companyganj-Bholaganj Road as National 693 New Roads Highway Project [0183] (On-Going Project) (Approved) (01/03/15-30/06/21) 58 Construction of Jamalpur Town Bypass Road 5,384 1,500 1,500 3,884 Construction of Including Widening & Strengthening of Jamalpur- New Roads Islampur-Dewanganj Road from ch. 30+000 to 39+000. [0188] (New Project) (Approved) (01/03/15- 30/06/18) 59 Gazipur-Azmatpur-Itakhola Road Charshindur 13, 3,487 3,487 3,500 Construction of Shitallakha River project [0189] (New Project) 371 New Bridges (Approved) (01/03/15-30/06/18) 60 Construction of Mohipal Flyover Project, Feni [0191] 18, 6,000 6,000 6,500 Construction of (New Project) (Approved) (01/04/15-30/06/18) 148 New Roads ADP Project name Total Exp Prev Current Project type Ref cost upto yr yr alloc No prev alloc yr 61 Development of Dinajpur-Birol-Pakura- 7,115 1,600 1,600 3,000 Construction of Radhikapur(Birol Land Port) Road [0190] (New New Roads Project) (Approved) (01/03/15-30/06/18) 62 Construction of 478.171m Long PC Girder Bridge at 7,498 2,800 2,800 2,000 Construction of 6th km (Gap No. 6/1) over Choto Feni River at New Bridges Sonagazi Olamabazar-Chardarbeshpur-Companigonj Road. [0192] (On-Going Project) (Approved) (01/04/ 15-30/06/19) 63 Development of Matlab-Meghna-Dhonaghoda- 2,638 700 700 1,894 Impr/Rehab of Beriband Roads Project (Z-1069) [0230] (New roads Project) (Approved) (01/07/15-30/06/17) 64 Development of Godagari-Amnura-Nacholel- 6,249 1,200 1,200 4,926 Construction of Parbotipur-Adda Road(Road No.Z-6813) [0193] (New New Roads Project) (Approved) (01/07/15-30/06/17) 65 Improvement of Lalmai-Barura-Jalam-Adda- 2,853 1,300 1,300 1,545 Construction of Jogotpur(Lalmai-Jalam-Adda Portion) Road. [0194] New Roads (New Project) (Approved) (01/07/15-30/06/17) 66 Development of Kashba-Kuti Road [0195] (New 2,506 1,000 1,000 1,501 Construction of Project) (Approved) (01/07/15-30/06/17) (Road New Roads length:0.00 Km, Bridge length:0.00 m) 67 Improvement of District Road (Dhaka Zone) [07232] 10, 9,996 10, 923 Construction of (New Project) (Approved) (01/03/15-30/06/17) 923 000 New Roads (Road length:639.26 Km) 68 Improvement of District Road (Mymensingh Zone) 10, 6,000 6,000 4,743 Construction of [0186] (New Project) (Approved) (01/03/15-30/06/ 971 New Roads 17) 69 Improvement of District Road (Chittagong Zone) 11, 5,500 5,500 5,495 Construction of [07228] (New Project) (Approved) (01/03/15-30/06/ 169 New Roads 17) (Road length:803.54 Km) 70 Improvement of District Road (Comilla Zone) [07230] 11, 6,013 6,000 5,006 Construction of (New Project) (Approved) (01/03/15-30/06/17) 006 New Roads (Road length:527.31 Km) 71 Improvement of District Road (Sylhet Zone) [07229] 10, 3,000 3,000 6,982 Construction of (New Project) (Approved) (01/03/15-30/06/17) 307 New Roads (Road length:324.18 Km) 72 Improvement of Important Regional Highways to 79, 6,855 6,855 3,931 Impr/Rehab of Approriate Level of Standard and Width (Mymenshing 815 roads Zone) [0267] (On-Going Project) (Approved) (01/03/ 17-30/06/21) 73 Improvement of District Road (Barisal Zone) [07226] 11, 4,220 4,220 6,830 Construction of (New Project) (Approved) (01/03/15-30/06/17) 272 New Roads (Road length:762.60 Km) 74 Improvement of Distric Road (Gopalgonj Zone) [0187] 10, 4,500 4,500 5,403 Construction of (New Project) (Approved) (01/03/15-30/06/17) 506 New Roads 75 Improvement of District Road ( Rajshahi Zone) 10, 5,675 5,675 5,303 Construction of [07227] (New Project) (Approved) (01/03/15-30/06/ 978 New Roads 17) (Road length:612.34 Km) 76 Improvement of District Road (Rangpur Zone) 10, 6,000 6,000 4,380 Construction of [07223] (New Project) (Approved) (01/03/15-30/06/ 784 New Roads 17) (Road length:444.79 Km) 77 Constraction of Teknaf-Ramu-Garisan-Marisha- 6,049 2,336 2,336 3,713 Impr/Rehab of Palang Link Road [0184] (New Project) (Approved) roads (01/07/15-30/06/17) 78 Boktarmunshi-Kazirhat-Daganbhuiyan Road 11th k. 1,674 500 500 1,174 Construction of ADP Project name Total Exp Prev Current Project type Ref cost upto yr yr alloc No prev alloc yr m. choto river 94.31 meter PC Garder River Project. New Bridges [0198] (New Project) (Approved) (01/07/15-30/06/ 17) 79 Construction of Bangladesh-Mayanmar Maitri Sarak 7,965 7,270 7,270 526 Construction of (Balukhali-Gunduni Border Road. [0200] (New Project) New Roads (Approved) (01/07/15-30/06/18) 80 Construction of Sarnamoti Bridge at 20th km of 1,763 500 500 820 Construction of National Highway Barabari-Lalmonirhat-Burimary New Bridges Road (N-509) [0197] (New Project) (Approved) (01/ 07/15-30/06/18) 81 Widening and Strengthening of Bangaon-Nunni- 6,366 1,000 1,000 2,500 Construction of Hatipagar Road [0217] (New Project) (Approved) (01/ New Roads 10/15-30/06/18) 82 Construction of Coxbazar-Teknaf Merin Drive Road 45, 17, 17, 22,232 Construction of Project-3th (ShilKhali to Teknaf) [0218] (New Project) 582 074 074 New Roads (Approved) (01/07/15-30/06/18) 83 Khulna (Rupsha)-Srifaltala-Terokhada Road [0201] 4,861 100 100 4,000 Construction of (New Project) (Approved) (01/07/15-30/06/18) New Roads 84 Improvement of Chittagong(Nazirhat)-Maizbhander 3,581 550 550 1,500 Construction of Road (Z-1620) [0202] (New Project) (Approved) (01/ New Roads 09/15-30/06/18) 85 Construction of Matarbari Coal based Power Plant 65, 610 610 909 Construction of Connecting Road. [0206] (On-Going Project) 998 New Roads (Approved) (01/07/15-30/06/22) 86 Development of Sonapur (Noakhali)-Sonagazi(Feni)- 29, 3,500 3,500 7,000 Construction of Zorargonj (Chittagong) Road Project. [0203] (On- 305 New Roads Going Project) (Revised Unapproved) (01/09/15-30/ 06/21) 87 Improvement of western Bangladesh Bridge Project 291, 2,740 2,928 4,434 Construction of [0207] (On-Going Project) (Approved) (01/10/15-30/ 175 New Bridges 06/22) 88 Project of Curve straightening from Indrapool to 10, 0 1 1,800 Construction of Chakrashala over Dhaka-Chittagong-CoxsBazar 358 New Roads National Highway [0204] (On-Going Project) (Approved) (01/01/16-30/06/19) 89 Consrtuction of Bakergonj-Padrishibpur-kathaltoli- 12, 40 40 3,900 Construction of subidkhali-barguna road strangjening project [0205] 762 New Roads (On-Going Project) (Approved) (01/07/15-30/06/19) 90 Development of Nilphamari-Jaldhaka Road Project 6,634 10 10 1,800 Construction of [0208] (On-Going Project) (Approved) (01/01/16-31/ New Roads 12/18) 91 Faridpur(Badarpur)-Saltha-Soanapur-Muksudpur 12, 200 200 3,000 Construction of Road Improvement Project. [0209] (On-Going Project) 286 New Roads (Approved) (01/01/16-30/06/20) 92 Construction of Inter District Border Road: 55, 0 1 1 Construction of Mymenshing & Netrakona District Portion Project 957 New Roads [0210] (On-Going Project) (Approved) (01/01/16-31/ 12/21) 93 Construction of 282.558 Meter Long PC Girder Bridge 4,371 0 1 250 Construction of over the Banar River at 72th Km of Mymensingh- New Bridges Gafforgaon-Toke Road [0211] (On-Going Project) (Approved) (01/10/15-30/06/19) 94 Improvement of Faridpur(Maijkandi)-Boalmari- 23, 0 1 1,000 Construction of Gopalganj(Bhatiapara) Road including Sasrail- 964 New Roads ADP Project name Total Exp Prev Current Project type Ref cost upto yr yr alloc No prev alloc yr Alphadanga-Kashiyani Link Road [0212] (On-Going Project) (Approved) (01/04/16-30/06/21) 95 Support to Joydevpur-Debgram-Bhulta-Madanpur 23, 0 1 5,000 Construction of Road (Dhaka By Payss) [0213] (On-Going Project) 650 New Roads (Approved) (01/03/16-30/06/21) 96 Improvement and widening of Bhurghata-Barisal to 12, 0 1 3,500 Construction of Labukhali Bridge of the National Highway N-8 [0214] 159 New Roads (New Project) (Approved) (01/07/15-30/06/18) 97 Improvement of Sylhet-Sunamgonj Road. [0220] (On- 16, 0 0 300 Construction of Going Project) (Approved) (01/01/16-30/06/21) 087 New Roads 98 Construction of Ruma-Bogalek-keokradang road 8,998 0 0 6,400 Construction of [0221] (New Project) (Approved) (01/03/16-30/06/ New Roads 18) (Road length:0.02 Km, Bridge length:0.00 m) 99 Construction of Shibalay-Nayarkandi-Balla- 2,717 0 0 500 Construction of Harirampur road Project(Z-5066) [0222] (New Project) New Roads (Approved) (01/01/16-30/06/18) 100 Widening and Development of Gaibandha-Fulchari- 6,476 0 0 816 Construction of Bharatkhali-Saghata Road(Z-5522) [0223] (New New Roads Project) (Approved) (01/03/16-30/06/19) (Road length:0.00 Km, Bridge length:0.00 m) 101 Construction of 219.456 m I long Shahbazpur Bridge 6,828 0 0 6 Construction of and at 92nd of Dhaka-Sylhet National Highway New Bridges [0224] (On-Going Project) (Approved) (01/04/16-30/ 06/20) 102 Widening of Sadullahpur-Pirgonj-Nawabgonj District 10, 0 0 1,500 Construction of Highways Road. [0225] (New Project) (Approved) 338 New Roads (01/02/16-30/06/19) 103 Construction of Barotakia (Abu Torab) to Mirersarail 18, 0 0 3,700 Construction of EPZ Link Road. [0226] (On-Going Project) (Approved) 390 New Roads (01/05/16-30/06/21) 104 Widening of Dinajpur-Chirirbondor-Parbatipur 4,527 0 0 2,000 Impr/Rehab of Road(Z-5025) [0227] (New Project) (Approved) (01/ roads 04/16-30/06/18) 105 Cross- Border Road Network Improvement Project 368, 0 0 6,500 Construction of (Bangladesh) [0228] (On-Going Project) (Approved) 455 New Roads (01/05/16-30/06/22) (Road length:0.00 Km, Bridge length:0.00 m) 106 Widening of Ramnagar Mor to Abalpur of in Magura 11, 0 0 1,848 Impr/Rehab of Town on National Highway N-7. [0229] (On-Going 207 roads Project) (Approved) (01/04/16-30/06/21) 107 Improvement of Jatrabari Intersection (Including 689, 39, 39, 265,198 Construction of Equria-Babubazar Link Road) to Patchchar-Bhanga 205 738 738 New Bridges Through Mawa Road of Dhaka-Khulna (N-8) Highway to 4 Lane with Separate Lane for Slow Moving Vehicle [0219] (New Project) (Approved) (01/03/16- 30/06/20) 108 Straightening of dangerous curves at Sonapur- 2,371 0 0 1,100 Impr/Rehab of Kabirhat-Companigonj(Bashurhat)-Dagonbhuiyan roads Road. [0233] (New Project) (Approved) (01/07/16- 30/06/19) 109 Improvement of Chandpur-Nanupur-Chandra- 2,491 0 0 1,500 Impr/Rehab of Kamtabazar-Ramganj Road (Z-1412) remaining part roads (Chandpur Part) [0231] (New Project) (Approved) (01/07/16-30/06/18) ADP Project name Total Exp Prev Current Project type Ref cost upto yr yr alloc No prev alloc yr 110 Development Project for Construction of 44.02m long 3,535 0 0 1,200 Impr/Rehab of Sachar bridge & 4 R.C.C Culverts with curve roads straightening at Gouripur-Kachua-Hajiganj Road [0232] (New Project) (Approved) (01/07/16-30/06/ 18) 111 Widening of Pavement with Mediams of main Road in 6,992 0 0 100 Impr/Rehab of Nator Town from Harispur Bypass mor to roads Bonbelgoria Bypass mor. [0234] (On-Going Project) (Approved) (01/07/16-30/06/21) 112 Improvement of Panchdona-Danga-Ghorashal Zilla 93, 0 0 1 Construction of Highways into 4-lane Highway with one layer lowered 763 New Roads both side separate service lane (Including Danga Bazar-Islampur link Road) [0240] (On-Going Project) (Approved) (01/07/17-30/06/22) 113 Construction of Jhenaidah-Harinakundu Road and 4,259 0 0 100 Construction of Circuit House Link Road [0241] (New Project) New Roads (Approved) (01/04/16-30/06/18) 114 Construction of Piarpur Bridge at 6th Km. and 3,103 0 0 1,000 Construction of Chewuakhali Bridge at 52th Km. of Lakshmipur-Char New Bridges Alaxandar-Sonapur Road(Z-1405) [0236] (New Project) (Approved) (01/07/16-30/06/18) 115 SASEC Raod Connectivity Project-II Improvement of 1,189, 0 0 46 Construction of Elenga-Hatikamrul-Rangpur Road to a 4-Lane 901 New Roads Highways. [0238] (On-Going Project) (Approved) (01/ 09/16-31/08/21) 116 Improvement of Shamgonj-Jaria-Birisiri-Durgapur 31, 0 0 4,000 Construction of Road to National Highways Standard. [0242] (On- 602 New Roads Going Project) (Approved) (01/10/16-30/06/21) 117 Completion of Remaining Works of the Bridge over 14, 0 0 1 Reconstruction the River Surma at Chhatak on Gobindaganj-Chhatak 247 of Bridge Dowarabazar Road(Project Code-224086000) [0243] (On-Going Project) (Approved) (01/07/16-30/06/21) 118 Replacement of 03 nos. Bailey Bridges (2 Bridges & 1 2,564 0 0 704 Impr/Rehab of Culvert) & Reconstruction of 01 no. Damaged RCC roads Bridge of Bogra-Sariakandi roads. [0235] (New Project) (Approved) (01/01/17-30/06/19) 119 Construction of 03(Three) PC Girder Bridge at 7,009 0 0 200 Construction of Jamalpur-Madargonj Highway [0244] (New Project) New Bridges (Approved) (01/10/16-30/06/19) 120 Improvement of Shaheed Mayezuddin Bridge to 8,297 0 0 500 Construction of Panchdona Intersection of Tongi-Kaligonj-Ghorashal- New Roads Panchdona Regional Highway(R-301) into National Highway standard [0245] (New Project) (Approved) (01/01/16-30/06/19) 121 Replacement of Risky Bridges of Munshigonj Road 16, 0 0 1,083 Reconstruction Division By Parmanent Concrete Bridges (Phase-1) 939 of Bridge [0246] (On-Going Project) (Approved) (01/12/16-30/ 06/20) 122 Construction of 180.373 m long PC Girder Bridge in 2,738 0 0 100 Construction of place of Dilapidated Kalarpol-Ohidia Bridge Project New Bridges (Z-1065) [0247] (On-Going Project) (Approved) (01/ 01/17-30/06/21) 123 Improvement of Cyclone Roanu Affacted Kutubdia- 4,994 0 0 1 Construction of Azam District Highway (Z-1076) & Ektabazar- New Roads Paharchanda-Pekuabazar-Mognamaghat District ADP Project name Total Exp Prev Current Project type Ref cost upto yr yr alloc No prev alloc yr Highway (Z-1125)(Pekuabazar-Mognamaghat Portion) [0239] (New Project) (Approved) (01/01/17- 30/06/19) 124 Construction of PC Girder Bridge over the Puna River 4,855 0 0 10 Construction of at 46th km of Barisal-Jhalokati-Rajapur-Bhandaria- New Bridges Pirojpur Road(R-870) [0248] (On-Going Project) (Approved) (01/11/16-30/06/20) 125 Procurement of Equipment and Machineries for 58, 0 0 1 Impr/Rehab of Construction, Repair and Maintenance of Road 588 roads Infrastructure [0249] (On-Going Project) (Approved) (01/01/17-30/06/21) 126 Road Improvement project of Zia Coloney to Airport 1,359 0 0 1,359 Construction of gate via ISSB gate [0237] (New Project) (Approved) New Roads (01/07/16-30/06/17) 127 Improvement of Important Regional Highways to 42, 0 0 500 Impr/Rehab of Approriate Level of Standard and Width (Gopalganj 020 roads Zone) [0254] (On-Going Project) (Approved) (01/03/ 17-30/06/21) 128 Development of Brahmanbaria Town By-Pass from 3,809 0 0 100 Impr/Rehab of Ramrail Bridge approch to Puniaout moor in roads appropriate standard and width [0255] (On-Going Project) (Approved) (01/01/17-30/06/20) 129 Construction of Alikadam-jalanipara-Kurukpata- 50, 0 0 4,000 Construction of Powamohori Road Project(Project Code-224087300) 929 New Roads [0253] (On-Going Project) (Approved) (01/01/17-30/ 06/21) 130 Re-Construction of Mahalchari-Sindukchari-Jaliapara 2,499 0 0 2,451 Impr/Rehab of Road 1st Phase (Jaliapara-Sindukchari) Road Project roads [0252] (New Project) (Approved) (01/12/16-30/06/ 18) 131 Improvement of Important Regional Highways to 63, 0 0 2,200 Impr/Rehab of Approriate Level of Standard and Width (Dhaka Zone) 131 roads [0251] (On-Going Project) (Approved) (01/03/17-30/ 06/20) 132 Improvement of Important Regional Highways to 59, 0 0 0 Construction of Approriate Level of Standard and Width (Rangpur 810 New Roads Zone) [0256] (New Project) (Approved) (01/03/17- 31/12/19) 1 Technical Assistance for Detail Study & Design of 9,788 5,248 2,460 2,195 Other Dhaka-Chittagong Express way on PPP Basis [05190] (On-Going Project) (Approved) (01/03/13-30/06/19) (Road length:0.00 Km, Bridge length:0.00 m) 2 Technical Assistant for Sub Rigional Road Transport 7,351 50 50 606 Other Project Preparetri Fasility-II (SRTPPF-II) [0196] (On- Going Project) (Approved) (01/07/15-31/12/20) (Road length:0.00 Km, Bridge length:0.00 m) 3 Development of Bridge Management Capacity Project 3,108 0 0 1,505 Other [0250] (New Project) (Approved) (01/09/15-31/12/ 18)