GAS Y PETROQUIMICA BASICA

GERENCIA DE PROYECTO Y CONSTRUCCIÓN

SUBGERENCIA DE SERVICIOS TÉCNICOS

PROYECTO: Q-600-64-03

OBRA: “CONSTRUCCIÓN DE DOS PLANTAS CRIOGÉNICAS


MODULARES Y TERMINAL DE RECIBO Y
DISTRIBUCIÓN DE GAS LP Y GASOLINAS EN LA
ESTACIÓN 19, AREA DE REYNOSA, TAMPS.”

LUGAR: REYNOSA, TAMAULIPAS

ESP-H-1400
ESPECIFICACION DE PROCESO
AIR COOLED HEAT EXCHANGERS
No. ESP-H-1400
AIR COOLED HEAT
GAS Y PETROQUÍMICA BÁSICA
EXCHANGERS REV. A
GERENCIA DE PROYECTO Y
CONSTRUCCIÓN ESPECIFICACIÓN MECANICA Date: DEC-99

The attached specification, revised as indicated below, is issued herewith. If this is a later
revision than now in your possession, please destroy previous issue or page(s) as
appropriate.

Rev. A By PGPB Date 5 dec. 99 Pages All


Rev. 1 By PGPB Date 26 jun 01 Pages All

Rev. By Date Pages


Rev. By Date Pages
Rev. By Date Pages
Rev. By Date Pages
Rev. By Date Pages
Rev. By Date Pages

Note: New Issue X


Revised sheets only attached
Entire specification reissued

Prepared by: Pemex Gas y Petroquímica Básica

Date: 5 - december-1999

Approved by: Review and Comments by PGPB:

Date: Date:

ESP-H-1400.doc
Página 1 de 11

“En PGPB la más alta prioridad es la seguridad de nuestros trabajadores,


nuestros clientes, nuestros vecinos y el medio ambiente”
No. ESP-H-1400
AIR COOLED HEAT
GAS Y PETROQUÍMICA BÁSICA
EXCHANGERS REV. A
GERENCIA DE PROYECTO Y
CONSTRUCCIÓN ESPECIFICACIÓN MECANICA Date: DEC-99

FOREWORD

This specification covers the minimum requirements for the design and fabrication of air

cooled heat exchangers used in the petroleum and petrochemical industries.

This specification is intended to supplement API standard 661, Fourth Edition,

November 1997, which is part of this specification. Paragraph numbers of this

specification correspond to those in API 661. Paragraph numbers not found in API 661 are

new paragraphs.

Paragraph shall be highlighted as shown below to indicate the type of change from the API

Standard:

(Addition) New paragraph or supplemental requirements/clarifications to an existing

paragraph.

(Deleted) Paragraph deleted.

(Decision) A decision has been made as required.

(Substitution) Paragraph supersedes API in its entirety.

Substitute the terms “Buyer” and “Seller” for the corresponding terms “Purchaser” and

“Vendor” used in API 661.


ESP-H-1400.doc
Página 2 de 11

“En PGPB la más alta prioridad es la seguridad de nuestros trabajadores,


nuestros clientes, nuestros vecinos y el medio ambiente”
No. ESP-H-1400
AIR COOLED HEAT
GAS Y PETROQUÍMICA BÁSICA
EXCHANGERS REV. A
GERENCIA DE PROYECTO Y
CONSTRUCCIÓN ESPECIFICACIÓN MECANICA Date: DEC-99

ESP-H-1400.doc
Página 3 de 11

“En PGPB la más alta prioridad es la seguridad de nuestros trabajadores,


nuestros clientes, nuestros vecinos y el medio ambiente”
No. ESP-H-1400
AIR COOLED HEAT
GAS Y PETROQUÍMICA BÁSICA
EXCHANGERS REV. A
GERENCIA DE PROYECTO Y
CONSTRUCCIÓN ESPECIFICACIÓN MECANICA Date: DEC-99

CONTENTS

Section Page

1.0 GENERAL 1

2.0 PROPOSALS 1

3.0 DOCUMENTATION 1

4.0 DESIGN 1

5.0 MATERIALS 1

6.0 FABRICATION 1

7.0 INSPECTION, EXAMINATION, AND TEST 1

8.0 PREPARATION FOR SHIPMENT 1

9.0 SUPPLEMENTAL REQUIREMENTS 1

ATTACHMENTS 1

1 Appendix B. Air cooled Heat Exchanger Checklist 1

2 Appendix E. Air cooled Exchanger Specification Sheet 1

ESP-H-1400.doc
Página 1 de 11

“En PGPB la más alta prioridad es la seguridad de nuestros trabajadores,


nuestros clientes, nuestros vecinos y el medio ambiente”
No. ESP-H-1400
AIR COOLED HEAT
GAS Y PETROQUÍMICA BÁSICA
EXCHANGERS REV. A
GERENCIA DE PROYECTO Y
CONSTRUCCIÓN ESPECIFICACIÓN MECANICA Date: DEC-99

1. GENERAL

1.1. Scope

1.1.1. (Addition) The requirements stated herein are supplementary to be data


listed on the Air Cooled Heat Exchanger Specification.

1.1.2. (Addition) In addition, Supplier shall furnish 2 spare sets of gaskets for
cover Plate headers and blinded connections.

1.1.3. (Addition) Items to be supplied by the Buyer or construction contactor


include the following:

a. Foundation anchor bolts

b. Instrumentation and control with the exception of the actuators and


vibration cut-out switches. A dedicated PLC is not required;
Control for those devices shall be done via DCS.

c. External process piping

d. Field erection labour

ESP-H-1400.doc
Página 2 de 11

“En PGPB la más alta prioridad es la seguridad de nuestros trabajadores,


nuestros clientes, nuestros vecinos y el medio ambiente”
No. ESP-H-1400
AIR COOLED HEAT
GAS Y PETROQUÍMICA BÁSICA
EXCHANGERS REV. A
GERENCIA DE PROYECTO Y
CONSTRUCCIÓN ESPECIFICACIÓN MECANICA Date: DEC-99

e. Fireproofing

f. Electrical wiring and switchgear.


1.2.
1.3. Referenced Publications
(Addition) The Iatest edition shall be the one in effect on the PO (Purchase Order)
Date. The following standards and specifications are added.

ASME (American Society of Mechanical engineers, 345 East 47th Street,


New York, NY 10017)
B16.20 Ring Joint Gaskets and Grooves for Steel Pipe Flanges.

AWS (American Welding Society)

PGPB SPECIFICATIONS:
ESP H-2700 Structural Data For Mechanical Equipment

ESP H-1700 Welding – Pressure Vessels

1.4. Definitions

ESP-H-1400.doc
Página 3 de 11

“En PGPB la más alta prioridad es la seguridad de nuestros trabajadores,


nuestros clientes, nuestros vecinos y el medio ambiente”
No. ESP-H-1400
AIR COOLED HEAT
GAS Y PETROQUÍMICA BÁSICA
EXCHANGERS REV. A
GERENCIA DE PROYECTO Y
CONSTRUCCIÓN ESPECIFICACIÓN MECANICA Date: DEC-99

(Addition) Hydrogen Service: Exchangers containing fluids with a hydrogen partial pressure
greater than 100 pounds per square inch absolute (686 kilopascals absolute).

1.5. Conflicting Requirements

1.5.1. (Substitution) Supplier shall identify any conflict between the order,
Specifications, and other referenced documents for review by the Buyer.
Supplier shall obtain written approval from the Buyer before proceeding
with work affected by a conflict.

1.5.2. (Delete)

2. PROPOSALS

3. DOCUMENTATION

3.1. Approval Information

3.1.1. e. (Substitution) overall dimensions of assemblies and


subassemblies, including clearances, which must be
maintained.

f. (Addition) Supports shall include columns, braces, and


horizontal mounting beams. Dimensions shall include
baseplate size of major structural members.

ESP-H-1400.doc
Página 4 de 11

“En PGPB la más alta prioridad es la seguridad de nuestros trabajadores,


nuestros clientes, nuestros vecinos y el medio ambiente”
No. ESP-H-1400
AIR COOLED HEAT
GAS Y PETROQUÍMICA BÁSICA
EXCHANGERS REV. A
GERENCIA DE PROYECTO Y
CONSTRUCCIÓN ESPECIFICACIÓN MECANICA Date: DEC-99

o. (Addition) Location of connections such as nozzles, brackets,


clips, anchor bolt holes, and instrument connections.
p. (Addition) Platform and ladder Iocations.

3.1.3. (Addition) Field assembly drawings shall include location of pieces


requiring field assembly, exchanger item numbers and plot Iocation,
match mark number, legend defining match mark system, and bolt
list.

Supplier shall provide the following drawings:

a. Header detail drawing including tube and pass partition layout


Plug and gasket detail, and dimensions of parts.

b. Bundle detail including side frame, and tube support details.

c. Gasket detail.

d. Vibration switch.

e. Actuator.

f. Nameplate facsimile.

g. Motor (or other driver) outline.

ESP-H-1400.doc
Página 5 de 11

“En PGPB la más alta prioridad es la seguridad de nuestros trabajadores,


nuestros clientes, nuestros vecinos y el medio ambiente”
No. ESP-H-1400
AIR COOLED HEAT
GAS Y PETROQUÍMICA BÁSICA
EXCHANGERS REV. A
GERENCIA DE PROYECTO Y
CONSTRUCCIÓN ESPECIFICACIÓN MECANICA Date: DEC-99

3.1.4. (Addition) Calculations shall also include confirmation of nozzle loads


where loads exceed those shown in 4. 1. 10.

3.1.5. (Decision) Welding procedures and qualifications, weld map, and weld
procedure summary are required in accordance with Welding
Engineering Specification (Welding/NDE – General Welding
Specification For Pressure Retaining Components. American Welding
Society)

3.1.6. (Decision) Additional information shall include the following


a. Motor datasheet.
b. Lubrication datasheet
c. Spare parts recommendation
3.1.8. (Addition) When transport sketches are required, these shall show the
exact outline dimensions, dimensions, and orientation of projections, as
well as the total mass and center of gravity of each parcel, The sketches
shall be submitted in accordance with the PO, or at least 60 days prior
to shipment.

Where necessary, the location of lifting slings shall be painted or


otherwise indicated un the case or prime of equipment and on the
transport sketch.

ESP-H-1400.doc
Página 6 de 11

“En PGPB la más alta prioridad es la seguridad de nuestros trabajadores,


nuestros clientes, nuestros vecinos y el medio ambiente”
No. ESP-H-1400
AIR COOLED HEAT
GAS Y PETROQUÍMICA BÁSICA
EXCHANGERS REV. A
GERENCIA DE PROYECTO Y
CONSTRUCCIÓN ESPECIFICACIÓN MECANICA Date: DEC-99

3.2. Final Records

3.2.1. h. (Addition) Nameplate rub-off.

4. DESIGN

4.1. Tube Bundle Design

4.1.1.2 (Addition) To avoid differential lateral movement between header and


the piping manifold due to thermal expansion, thrust blocks shall be
provided on multibay units.

4.1.1.13 (Addition) The minimum fin type clearance shall be 1/4 of an inch
(6.35 mm).

4.1.3.1 (Substitution) the maximum and minimum design temperatures for


pressure parts shall be specified by the contractor, and shall be
according to its process conditions.

4.1.3.4 (Substitution) The selection of fin-type shall be based on the


operating inlet fluid temperature.

4.1.9.6 (Addition) Ring joint gaskets and grooves shall be in accordance with
ASME B16.20.

ESP-H-1400.doc
Página 7 de 11

“En PGPB la más alta prioridad es la seguridad de nuestros trabajadores,


nuestros clientes, nuestros vecinos y el medio ambiente”
No. ESP-H-1400
AIR COOLED HEAT
GAS Y PETROQUÍMICA BÁSICA
EXCHANGERS REV. A
GERENCIA DE PROYECTO Y
CONSTRUCCIÓN ESPECIFICACIÓN MECANICA Date: DEC-99

4.1.9.23 (Addition) When noted on the datasheet, the designation RFSF shall
mean a raised face-type flange with RMS (139-278AA) finish.

4.1.11.13 (Addition) Allowable types of finned construction are shown below


with the maximum process inlet temperature for each type. Alternate
designs require Supplier’s prior approval. Footed fins are not allowed
in cyclic service.

Inlet Process Fluid

Temperature Fin type


750 degrees F (399 degrees C) Embedded
550 degrees F (288 degrees C) Integral (Extruded)
275 degrees F (177 degrees C) Footed

4.1.9.23 (Addition) Connections in lethal service Shall be flanged. Slip-on -


flanges are not allowed in lethal service.

4.2. Air-Side Design

4.2.1.4 (Addition) Mechanical and instrument components shall also be


rated for low temperature operation at the minimum ambient
temperature less 25 degrees F (14 degrees C).

ESP-H-1400.doc
Página 8 de 11

“En PGPB la más alta prioridad es la seguridad de nuestros trabajadores,


nuestros clientes, nuestros vecinos y el medio ambiente”
No. ESP-H-1400
AIR COOLED HEAT
GAS Y PETROQUÍMICA BÁSICA
EXCHANGERS REV. A
GERENCIA DE PROYECTO Y
CONSTRUCCIÓN ESPECIFICACIÓN MECANICA Date: DEC-99

4.2.1.5 (Addition) For forced type exchangers, the space between adjacent
bays in a common bank shall be sealed to prevent exhaust air
recalculation.

4.2.2.1 (Addition) Noise shall be limited to a maximum sound pressure level


of 85 dBA at 3 feet (1 meter) from the fan ring according with API
661.

4.2.3.11.2 (Substitution) The pneumatic actuator shall be equipped with a


positioner.
4.2.10.25 (Addition) Louvers shall be the opposed action type.

4.3. Structural Design

4.3.2.2 (Decision) Shop vibration tests are required in the following cases:

a. For one typical bay of shop preassembled induced draft units.

b. For each run-in test of knocked down units or shop


preassembled forced draft units.

4.3.3.2 (Substitution) Live loads shall be in accordance with Structural


Engineering Specification ESP-H-2700: Structural Data For
Mechanical Equipment.

ESP-H-1400.doc
Página 9 de 11

“En PGPB la más alta prioridad es la seguridad de nuestros trabajadores,


nuestros clientes, nuestros vecinos y el medio ambiente”
No. ESP-H-1400
AIR COOLED HEAT
GAS Y PETROQUÍMICA BÁSICA
EXCHANGERS REV. A
GERENCIA DE PROYECTO Y
CONSTRUCCIÓN ESPECIFICACIÓN MECANICA Date: DEC-99

4.3.5.5 Ladders and platforms shall be in accordance with Mechanical


Engineering Specification ESP-H-2700.

5. MATERIALS

5.1. General

5.1.1. (Substitution) The use of cast iron for pressure parts is prohibited.
5.1.1.1. (Addition) The use of asbestos is prohibited.
5.1.1.2. (Addition) The use of welded pipe is prohibited. Rev 1

6. FABRICATION

6.1. Welding

6.1.1.1. (Addition) Header welding shall be in accordance with Welding


Engineering Specifications ESP-H-1700 and American Welding
Society

6.1.1.5. (Addition) Structural welding shall be in accordance with American


Welding Society

7. INSPECTION, EXAMINATION, AND TEST

ESP-H-1400.doc
Página 10 de 11

“En PGPB la más alta prioridad es la seguridad de nuestros trabajadores,


nuestros clientes, nuestros vecinos y el medio ambiente”
No. ESP-H-1400
AIR COOLED HEAT
GAS Y PETROQUÍMICA BÁSICA
EXCHANGERS REV. A
GERENCIA DE PROYECTO Y
CONSTRUCCIÓN ESPECIFICACIÓN MECANICA Date: DEC-99

7.2 Quality Control

6.1.1.6. 7.2.20 (Addition) Non-destructive and mechanical testing


shall be in accordance with welding Engineering Specification
American Welding Society

7.3 Pressure Test

7.4 (Decision) Shop Run-In

Exchangers shall have a shop run-in test for the following:

a. Shop assembled units.

b. One or more bays of knocked down units. The number of tests shall be noted
by the inquiry or PO.

8. PREPARATION FOR SHIPMENT

8.2 Surfaces and finishes

8.2.3 (Addition) Also apply 2 coats of Suppliers standard finish paint.

9. SUPPLEMENTAL REQUIREMENT

9.1. (Decision) General


ESP-H-1400.doc
Página 11 de 11

“En PGPB la más alta prioridad es la seguridad de nuestros trabajadores,


nuestros clientes, nuestros vecinos y el medio ambiente”
No. ESP-H-1400
AIR COOLED HEAT
GAS Y PETROQUÍMICA BÁSICA
EXCHANGERS REV. A
GERENCIA DE PROYECTO Y
CONSTRUCCIÓN ESPECIFICACIÓN MECANICA Date: DEC-99

The supplemental requirements apply for the following cases:

a. Design pressure greater than 2000 pounds per square inch gage (13,800
kilopascal).
b. Plate thickness of box-type header greater than 2 inches (50 millimetres).
c. Lethal service.
d. Special service, as noted on the datasheet