NATIONAL TAKANAH COMPANY LIMITED

MONORAIL BEAMS INSTALLATION WORK


QUANTITY

total weight Unit rate

STAND-BY
TAG NO DENOMINATION UNIT DESCRIPTION TECHNICAL DATA (PER UNIT) Size Weight (kg) Total price GA DRAWING

FUTURE
TOTAL
DUTY
(Ton) for tonn

INLET FLOW MEASUREMENT, INLET CHAMBER, FINE SCREENS

030-HH-01A 1 1 0 0 Lifting Travelling Crane Screening Building Details will be determined during design engineering - - - 20000.00 7200038411-JWWF-MD-030_Inlet_Works

GRIT AND GREASE CHAMBERS

040-HH-02A/B 2 2 0 0 Lifting Monorail for Classifier Details will be determined during design engineering - - - 97627.33 7200038411-JWWF-MD-030_Inlet_Works

AIR BLOWERS FOR GRIT AND GREASE CHAMBERS

040-HH-010 1 1 0 0 Lifting Monorail for Grit Blower Details will be determined during design engineering - - - 9511.41 7200038411-JWWF-MD-030_Inlet_Works

ACTIVATED SLUDGE TANKS BLOWER ROOM

065-HH-010 1 1 0 0 Lifting Travelling Crane for Air Blower Details will be determined during design engineering -- -- -- 44149.78 7200038411-JWWF-MD-065-REV3-Blower_Building
EXCESS AND RETURN SLUDGE PUMPING
STATION

120-HH-01A/B/C 3 3 0 0 Lifting Monorail Details will be determined during design engineering - - - 17534.25
RAPID SAND FILTRATION BUILDING - BLOWER
AND PUMP ROOM
090-HH-010 1 1 0 0 Lifting Monorail (Drainage Pumping Station) Details will be determined during design engineering - - - 6133.12
090-HH-020 1 1 0 0 Lifting Monorail (Gallery) U shaped at both ends - - - 6133.12
090-HH-030 1 1 0 0 Lifting Monorail (Blower) U shaped at one end - - - 6133.12
TSE PUMPING STATION, SERVICE WATER
PUMPING STATION
110-HH-010 1 1 0 0 Lifting Travelling Crane Details will be determined during design engineering -- -- -- 26576.86
CHLORINE DOSING STATION

103-HH-010 1 1 0 0 Lifting Monorail U shaped at both ends -- -- -- 56790.01 7200038411-JWWF-MD-103-CHLORINE DOSING STATION

SLUDGE THICKENING AND DEWATERING BUILDING

130-HH-010 1 1 0 0 Lifting Travelling Crane Details will be determined during design engineering -- -- -- 41000.00
NET TOTAL AMOUNT 331,589.02
SCOPE OF WORK:

A) NATIONAL TAKANAH SCOPE:


1. Leading of the Monorail beams to required locations.
2. Lifting of the Monorail beams to required elevations.
3. Scaffolding work for the installation work
4. Welding work
5. Alignment of the Monorail beam
6. Handing over

B) WABAG SCOPE:
1. All Civil works related to Monorail installation shall be in your scope.
2. Monorail crane installation