030-HH-01A 1 1 0 0 Lifting Travelling Crane Screening Building Details will be determined during design engineering - - - 20000.00 7200038411-JWWF-MD-030_Inlet_Works
040-HH-02A/B 2 2 0 0 Lifting Monorail for Classifier Details will be determined during design engineering - - - 97627.33 7200038411-JWWF-MD-030_Inlet_Works
040-HH-010 1 1 0 0 Lifting Monorail for Grit Blower Details will be determined during design engineering - - - 9511.41 7200038411-JWWF-MD-030_Inlet_Works
065-HH-010 1 1 0 0 Lifting Travelling Crane for Air Blower Details will be determined during design engineering -- -- -- 44149.78 7200038411-JWWF-MD-065-REV3-Blower_Building
EXCESS AND RETURN SLUDGE PUMPING
STATION
120-HH-01A/B/C 3 3 0 0 Lifting Monorail Details will be determined during design engineering - - - 17534.25
RAPID SAND FILTRATION BUILDING - BLOWER
AND PUMP ROOM
090-HH-010 1 1 0 0 Lifting Monorail (Drainage Pumping Station) Details will be determined during design engineering - - - 6133.12
090-HH-020 1 1 0 0 Lifting Monorail (Gallery) U shaped at both ends - - - 6133.12
090-HH-030 1 1 0 0 Lifting Monorail (Blower) U shaped at one end - - - 6133.12
TSE PUMPING STATION, SERVICE WATER
PUMPING STATION
110-HH-010 1 1 0 0 Lifting Travelling Crane Details will be determined during design engineering -- -- -- 26576.86
CHLORINE DOSING STATION
103-HH-010 1 1 0 0 Lifting Monorail U shaped at both ends -- -- -- 56790.01 7200038411-JWWF-MD-103-CHLORINE DOSING STATION
130-HH-010 1 1 0 0 Lifting Travelling Crane Details will be determined during design engineering -- -- -- 41000.00
NET TOTAL AMOUNT 331,589.02
SCOPE OF WORK:
B) WABAG SCOPE:
1. All Civil works related to Monorail installation shall be in your scope.
2. Monorail crane installation