Professional Documents
Culture Documents
INSTRUCTORS
EIABC Mr. EARMIAS & 1
Mr. ALEMAYEHU
COST EFFICIENT CONSTRUCTION 05/13/2021
1 4.98
23.90 m2
TIM DIM SQUA DESCRIPTION
4.78 slab between Axis 7 & 8 , B & C
1 4.98
23.80 m2
Total Area of slab concrete work
285.17 m2
4 but total story of the building is G+4 their fore total qty is
1140.70 m
2
INSTRUCTORS
EIABC Mr. EARMIAS & 2
Mr. ALEMAYEHU
COST EFFICIENT CONSTRUCTION 05/13/2021
INSTRUCTORS
EIABC Mr. EARMIAS & 3
Mr. ALEMAYEHU
COST EFFICIENT CONSTRUCTION 05/13/2021
23.80 m2
4.8 plastering work between Axis 2& 3 , B & C
1 4.98
23.90 m
2
painting work
4.78 painting work Axis 1& 2 , A & B
1 3.52
16.83 m2
4.8 painting work between Axis 2& 3 , A & B
1 3.52
16.90 m
2
INSTRUCTORS
EIABC Mr. EARMIAS & 4
Mr. ALEMAYEHU
COST EFFICIENT CONSTRUCTION 05/13/2021
3.52
13.34 m2
4.8 painting work between Axis 6 & 7 , A & B
1 3.52
16.90 m2
INSTRUCTORS
EIABC Mr. EARMIAS & 5
Mr. ALEMAYEHU
Cost efficient project 05/13/2021
INSTRUCTORS
EIABC Mr. Earmias 6
Mr. Alemayehu
Cost efficient project 05/13/2021
INSTRUCTORS
EIABC Mr. Earmias 7
Mr. Alemayehu
Cost efficient project 05/13/2021
13.34 m2
TIM DIM SQUA DESCRIPTION
1 3.84 concrete work between Axis 4 & 5 , A & B
2.65
10.18 m2
1 3.79 concrete work between Axis 5 & 6 , A & B
3.52
13.34 m2
4.8 concrete work between Axis 6 & 7 , A & B
1 3.52
16.90 m2
4.78 concrete work between Axis 7 & 8 , A & B
1 3.52
16.83 m2
4.78 concrete work between Axis 1& 2 , B & C
1 4.98
23.80 m
2
285.17 m2
4 but total story of the building is G+4 their fore total qty is
1140.70 m2
INSTRUCTORS
EIABC Mr. Earmias 9
Mr. Alemayehu
Cost efficient project 05/13/2021
23.80 m
2
INSTRUCTORS
EIABC Mr. Earmias 11
Mr. Alemayehu
Cost efficient project 05/13/2021
INSTRUCTORS
EIABC Mr. Earmias 12
Mr. Alemayehu
Cost efficient project 05/13/2021
BAR-e
On Axis-A, b/n 1-2 & 7-8 1/FF-4/FF Negative 12 20.25 14 1 14 283.5
BAR-e
On Axis-A, b/n 3-4 & 5-6 1/FF-4/FF Negative 12 20.25 10 1 10 202.5
BAR-a
ON Axis-A, b/n 2-3 & 6-7 1/FF-4/FF Negative 12 34.55 14 2 28 967.4
BAR-d
On Axis-B, b/n 1-4 & 5-8 1/FF-4/FF Negative 12 26.9 38 2 76 2044.4
BAR-b
On Axis-C, b/n 1-4 & 5-8 1/FF-4/FF Negative 12 23.15 38 1 38 879.7
BAR-c
On Axis-4& 5 b/n A & B 1/FF-4/FF Negative 12 13.25 8 1 8 106
TOTAL LENGTH OF BARS 0 0 0 4484 0 0 0
UNIT WEGHT (KG/M) 0.222 0.395 0.617 0.888 1.209 1.586 2.469
TOTAL WEGHT (KG) 0 0 0 3981 0 0 0 3981
but total story of the building is G+4 their fore total qty is 4 0 0 0 15925.392 0 0 0 3981.348
INSTRUCTORS
EIABC Mr. Earmias 13
Mr. Alemayehu
Cost efficient project 05/13/2021
INSTRUCTORS
EIABC Mr. Earmias 14
Mr. Alemayehu
Cost efficient project 05/13/2021
INSTRUCTORS
EIABC Mr. Earmias 15
Mr. Alemayehu
Cost efficient project 05/13/2021
1 5.28
26.93 m2
TIM DIM SQUA DESCRIPTION
5.08 slab between Axis 7 & 8 , B & C
1 5.28
26.82 m
2
18.87 m
2
4 but total story of the building is G+4 their fore total qty is
1140.70 m2
INSTRUCTORS
EIABC Mr. Earmias 17
Mr. Alemayehu
Cost efficient project 05/13/2021
INSTRUCTORS
EIABC Mr. Earmias 18
Mr. Alemayehu
Cost efficient project 05/13/2021
INSTRUCTORS
EIABC Mr. Earmias 19
Mr. Alemayehu
Cost efficient project 05/13/2021
INSTRUCTORS
EIABC Mr. Earmias 20
Mr. Alemayehu
Cost efficient project 05/13/2021
INSTRUCTORS
EIABC Mr. Earmias 21
Mr. Alemayehu
Cost efficient project 05/13/2021
ProjectFLOOR SLAB
Date -11/20/2020
Client:GROUP MEMBERS
BILL OF QUANTITIES(BOQ)
ITEM DESCRIPTION UNIT QTY RATE(ETB) AMOUNT
SOLID SLAB
1 Concrete work cast in situ
1.1 total concrete for rc slab of the m2 1140.70 690.00 ETB 787,081.34
the whole story Blg C-25
1.2 Formwork 2cm thick timber
1.2.1 The rate of the formwork is including
whole the formwork and escafolding m2 1140.70 1600.00 ETB 1,825,116.16
1.3 Reinforcement work
1.3.1 total dia 12mm bar kg 6675.35 55.00 ETB 367,144.12
1.3.2 ditu but dia 10mm bar kg 3384.35 59.00 ETB 199,676.39
1.4 Finishing work
1.4.1 Plastering, Two Coats m2 1140.70 216 ETB 246,390.68
Cement/Sand Mortar (1:4)
1.4.2 Final Coat quartz paint m2 1140.70 105.31 ETB 120,131.14
Total cost for Solid slab ETB 3,545,539.84
2 RIBBED SLAB
2.1 Precast beam for Ribbed slab m 1441.44 414.00 ETB 596,756.16
2.2 Ribbed block with 24 cm thick m 2
814.88 302.00 ETB 246,093.76
2.3 C-25 concrete for topping after m2 1140.70 432 ETB 492,781.36
the ribbed block with 6cm thick
for the whole 4 story BLG
2.4 Reinforcement work
2.4.1 total dia 12mm bar kg 15925 55.000 ETB 875,896.56
2.5 Finishing work
2.5.1 Plastering, Two Coats m2 1140.70 201.00 ETB 229,280.22
Cement/Sand Mortar (1:4)
2.5.2 Final Coat quartz paint m2 1140.70 105.31 ETB 120,131.14
Total cost for ribbed slab ETB 2,560,939.20
3 PRECAST PANNEL
3.1 Precast panel m2 1302.71 1924.00 ETB 2,506,413.27
3.2 Finishing work
3.3.1 Final Coat quartz paint m2 1140.70 105.31 ETB 120,131.14
total cost for precast slab ETB 2,626,544.41
INSTRUCTORS
EIABC Mr. Earmias Page 22
Mr. Alemayehu