Construction Schedule – Basis of Schedule
Fines suspended in the water column within the contained (dyked) areas will be directed to an underwater disposal
at sea (DAS) site. Seepage through the perimeter dykes is to be minimised by placing a filter layer on the inner face
of the Terminal dykes. Sluice boxes would be managed to maximise the retention time of the contained water.
For the purposes of this Basis of Schedule document, the “Terminal Area” refers to that part of the final terminal that
is located within the Containment Dykes. “Perimeter Dyke” is dyking that forms the outer perimeter of the final
terminal. “Containment Dyking” is dyking to contain the dredged materials and other general fill within the Terminal
Area. Containment Dyking includes all of the Perimeter Dyking. The crest of the Containment Dykes has been set at
EL +6.0 m, which should be adequate for construction activities in most weather / tidal conditions (HHWL EL +4.8 m)
and will be above the height required for dredgeate containment.
2.2 Dyking
RPT-2015-01-15-Basis Of Schedule-60309294 4