You are on page 1of 11

IMO MODEL COURSE,

7.03

OFFICER IN CHARGE OF A
NAVIGATIONAL WATCH
FUNCTION

1 NAVIGATION

2 CARGO HANDLING

3 CONTROLING
2. CARGO HANDLING

2.1 MONITOR THE LOADING, STOWAGE,


SECURING AND UNLOADING CARGOES
AND THEIR CARE DURING THE VOYAGE

2.1.1 THE EFFECT OF CARGO, INCLUDING HEAVY LIFTS


ON THE SEA-WORTHINESS AND STABILITY OF
THE SHIP

2.1.2 SAFE HANDLING, STOWAGE AND SECURING OF


CARGOES
2.1.1 THE EFFECT OF CARGO, INCLUDING HEAVY
LIFTS ON THE SEA-WORTHINESS AND
STABILITY OF THE SHIP

1 DRAUGHT TRIM AND STABILITY

2 SECURING CARGOES
3 DECK CARGOES

4 CONTAINER CARGOES

5 BULK CARGO
6 BULK GRAIN CARGO
2.1.2 SAFE HANDLING, STOWAGE AND
SECURING OF CARGOES

1 CARGO CARE

2 DANGEROUS, HAZARDOUS AND HARMFUL CARGO

3 CARGO HANDLING EQUIPMENT AND SAFETY

4 OIL TANKER PIPING AND PUMPING ARRANGEMENTS

PRECAUTIONS BEFORE ENTERING ENCLOSED


5
OR CONTAMINATED SPACES

6 CARGO CALCULATIONS AND CARGO PLANS


2.1.1.1 DRAUGHT, TRIM AND STABILITY

CLASS TOPICS

 READING DRAUGHT
 DRAFT CORRECTION
 USE OF HYDROSTATIC TABLE
READING DRAUGHT
2
8M READ “ 8 Mtr”

8
READ “ 7.75 Mtr “
6
20 Cm
4 10 Cm

2
7M 10 Cm
READING DRAFT

XII Read 12’ 03”

Read 11’ 09”

XI
12” = 1’
X
IX 6”
COORECTION DRAFT

AP FP
LBP = 85.24 m
81.76
Draft Mark

3.00 m 0.48 m

0.48 m
Df = x Trim
81.76 m
3.00 m
Da = x Trim
81.76 m
Apparent trim in meter (-) if by ahead ; (+) if by astern

Contoh F = 3.00 m A = 5.00 m


T = 2.00 m by astern

Df = 0.00587 x 2.0 = 0.011 m

Da = 0.03667 x 2.0 = 0.073 m

DF = 3.00 – 0.011 = 2.989 m

DA = 5.00 + 0.073 = 5.073 m

Mean Draft = 2.989 + 5.073


= 4.031 m
2
HYDROSTATIC TABEL
EXT DISPL TPC MCT LCB LCF KM
DRAUGHT TONNES TONNES TONNES mtr mtr mtr

4.000 4322.3 11.17 52.50 44.84 44.20 6.879


4.020 4344.7 11.18 52.60 44.84 44.18 8.868
4.O31 4357.0 11.18 52.65 44.84 44.18 8.873
4.040 4367.0 11.19 52.70 44.84 44.17 6.859
4.060 4389.4 11.19 52.79 44.84 44.15 6.849

(LBP/2 – LCF) x CT
Mean Draft Corr =
DISPL = 4357.0 LBP

Mean Draft Corr = (85.24/2 – 44.18) x 2.084


= - 0.038 m
85.24
Displ Corr’n = -3.8 cm x 11.18 = - 42.48 tons

Finally Displ = 4357.0 – 42.48 = 4314.5 tons

You might also like