You are on page 1of 2

R00OMP Shurayrah MP The Red Sea Development Company

ISSUE DETAIL

#398 Openings to be coordinated with Utilities before


topping casting

Created Jan 25, 2021


CLOSED Due Date

https://developer.api.autodesk.com/oss/v2/signedresources/d55bf59d-dbaa-
4110-869e-b7526e108e6d?region=US

Type / Subtype Design / Marine

Location

Root Cause

Checklist Source

Reference Drawing R12-I18D06-JAC-XX-XX-DWG-MR-0939-00.pdf [v1]

Creator Patrick Ho The Red Sea Development Company

Issue Owner Julian Harvey-Bennett The Red Sea Development Company

Assignee Jacobs Engineering Group

Description Openings to be coordinated with Utilities


Construction sequence need to considered installation of utilities route before
toppings are casted. JHB-2021-04-28: ANSWERED status not accepted without
confirmation of your response/action detailed in BIM360; Issue is revised to OPEN
(RnR)
Criticality

Impact

Document Approval Status B - Revise and Resubmit

Program Type

Asset Type

Created with Autodesk® BIM 360™ at May 03, 2021 9:28 AM Page 1 of 2
R00OMP Shurayrah MP The Red Sea Development Company

OFFICIAL RESPONSE

By Suresh Babu - Mar 02, 2021 11:50 AM Jacobs Engineering Group

Created with Autodesk® BIM 360™ at May 03, 2021 9:28 AM Page 2 of 2

You might also like