PROJECT PROPOSAL
I. IDENTIFYING INFORMATION

PROJECT TITLE: RENOVATION OF HANDWASHING FACILITY


PROJECT SITE: Upper Tugar Elementary School, Tugar, Kauswagan, Lanao del Norte
PROJECT PROPONENT: Jane D. Generosa, School Gender and Development (GAD) Coordinator
TARGET DATES: June-July 2021

II.GENERAL INFORMATION
A. DESCRIPTION:
This renovation of handwashing facility project is in line with policy guidelines in the preparation
of Gender and Development Program (GAD) plan and utilization of GAD budget in light with the COVID-
19 preparations of schools.
The projects’ budget will be charge against the 5% Gender and Development fund of the
school amounting P 9,262.50 based from the school’s MOOE.

B. MANAGEMENT LEVEL OF THE PROJECT: School-Based

C. DELIVERY MODE: Provision of Handwashing Facilities

D. RATIONALE

School environment and safety are important factors affecting pupils learning especially I this
trying times of COVID pandemic. It has been always emphasized by the World Health Organization
(WHO), Inter-Agency Task Force (IATF) that frequent handwashing is one of ways to combat the spread
of the virus.
For the previous years, the school have been using the shared faucet as the common hand
washing area which was constructed years ago. Thus, its present condition seems to be unpleasant for
the users especially the learners of Upper Tugar Elementary School.
As a school, our responsibility to our learners encompasses every aspect of their health, safety
and comfort. One area of that responsibility that is going to overlook is the handwashing facilities, but
the fact is that to maintain an acceptable level of cleanliness and hygiene, the handwashing area
should also have a constant water supply and must be upgraded into a standard handwashing counter.
With this, in response to the call of WHO and in line with the Minimum health standards in
schools provided by the DepEd, the primary concern now is to renovate the existing handwashing
counter for the learners in order for them comfortably use it for their sanitation and to fight the spread
of the virus in the school.

E. OBJECTIVE:
To renovate a school handwashing facility at the end month of July 2021 through the use of the
5% Gender and Development (GAD) Fund of the school.

MONITORING AND EVALUATION PLAN


Republic of the Philippines
Department of Education
Region X – Northern Mindanao
Division of Lanao del Norte
Kauswagan District
UPPER TUGAR ELEMENTARY SCHOOL

Responsible Support Needed


Target Milestone Actions Target Date
Person from:
Conduct of physical facilities and School Physical
maintenance needs assessment Facilities School Head April 2021
Conduct form Coordinator
Assessment of
School Head
school situation Online Meeting with the teachers GAD Coordinator April 2021
Teachers

Meeting and coordination with the School Head


GAD Coordinator April 2021
members of SGC Teachers

Creation of Project Program of School Head


GAD Coordinator May 2021
Works Division Engineer

GAD Coordinator, School Head


Planning of the Project area ocular inspection May 2021
Division Engineer Teachers
Project
Division Engineer,
Approval of Project Program of
SGOD Chief, School Head May 2021
Works
SDS
Start of renovation of hand GAD Coordinator
Mason, Carpenter June 2021
washing facilities School Head
Project Update of the development of the
GAD Coordinator School Head June 2021
Implementation renovation project
Documentation of project
GAD Coordinator School Head June 2021
development
Assessment of project School Head
GAD Coordinator July 2021
accomplishment Division Engineer
Project
Monitoring and GAD Coordinator, School Head
Turn-over ceremony July 2021
Evaluation School Head Teachers

School Head,
Documentation GAD Coordinator July 2021
Teachers

REQUIRED RESOURCES

Milestone Resources Needed Budget Approvals needed

Conduct Assessment of Office Supplies from


Bond papers, camera, ballpen School Head
school situation MOOE
Republic of the Philippines
Department of Education
Region X – Northern Mindanao
Division of Lanao del Norte
Kauswagan District
UPPER TUGAR ELEMENTARY SCHOOL

Bond papers, camera, ballpen, Office Supplies from School Head,


Planning of the Project
projector MOOE Municipal Engineer

Construction materials, Office Supplies from School Head,


construction workforce, MOOE, Division Engineer,
Project Implementation
camera, bond papers, ballpen Pls. see project program SGOD Chief,
of works SDS

School Head,
Project Monitoring and
Office Supplies from Division Engineer,
Evaluation Bond papers, camera, ballpen
MOOE SGOD Chief,
SDS

Prepared by:

JANE D. GENEROSA
School GAD Coordinator

Noted by: Reviewed by:

MARK P. PAGUIDOPON ARLENE D. MANGINSAY, Ph.D.


School Principal EPS, SGOD/ Division GAD Focal Person

Approved:

MARIA CARMELA T. ABLIN, Ed.D


Chief Education Supervisor, SGOD

PROJECT PROGRAM OF WORK


Work Description: Renovation of school handwashing facility
Location: Upper Tugar Elementary School, Purok 3, Tugar, Kauswagan, Lanao del
Norte
Funding Requirement: 9,262.50
Source of Funds: 5 % GAD Fund
Implementation: By Administration
DETAILED COST ESTIMATES
A. MATERIALS FOR CARPENTRY WORKS
60 pc Tiles (30 cm X 30 cm) @ 45.00 / pc 2,700.00
Republic of the Philippines
Department of Education
Region X – Northern Mindanao
Division of Lanao del Norte
Kauswagan District
UPPER TUGAR ELEMENTARY SCHOOL
10 pc Tile trim @ 65.00 / pc 650.00
2 bag cement @ 225 .00 / bag 450.00
1 bag Tile adhesive @ 295.00 / bag 295.00
2 bag Tile grout @ 105.00 / bag 210.00
1/2 kilo Concrete nails #2 @ 125.00 / kilo 62.50
10 pc Stick 1x2x8 @ 30.00 / pc 300.00
1 roll Nylon #40 @ 95.00 / roll 95.00
4,762.50
B. LABOR
1 Mason for 5 days @ 550.00 / day 2,750.00
1 Laborer for 5 days @ 350.00 / day 1,750.00
4,500.00
SUMMARY
TOTAL COST OF MATERIALS
4,762.50
-----------------------------------------------------------------------------
TOTAL COST OF LABOR
4,500.00
-----------------------------------------------------------------------------------
TOTAL ESTIMATED PROJECT COST
9,262.50
------------------------------------------------------------

Prepared by: Reviewed by:

MARK P. PAGUIDOPON NOR JANAH G. MACASIMPAN


School Principal Division Engineer

Recommending Approval: Approved by:

ARLENE D. MANGINSAY, Ph.D MARIA CARMELA T. ABLIN,


Ed.D.
EPS, SGOD/ Division GAD Focal Person Chief Education Supervisor, SGOD