Development of road from Bannerghatta on SH-87 to Besthamanahalli on SH-35 (Including Anekal Bypass, Grade Separator across Chandapura Road

and ROB across railway line) jigani, Haragadde


and Indalwadi (Km 0+000 to 22+980) in Bengaluru (Package – 3B).
RFI / PROGRAMME FOR 12/06/2021
Highway
BOQ Submission Inspection
Sl no. RFI no. Description From To Length Side Time Remarks
item no Date date

1 20.6.2 KRDCL/KMV/HWY/486 Level Checking and FDD test for GSB Top Layer 09+920 10+220 300 RHS 6/11/2021 6/12/2021 10.00 AM

2 19.62 KRDCL/KMV/HWY/487 FDD test for GSB 1st Layer Shoulder 11+740 11+870 130 LHS 6/11/2021 6/12/2021 10.30 AM
3 0 6/11/2021 6/12/2021

Structure
BOQ Submission Inspection
Sl no. RFI no. Description From To Length Side Time Remarks
item no Date date
Shuttering and Reinforcement Checking for Drain
1 28.8.2 KRDCL/KMV/STR/6088 02+185 02+195 10 LHS 6/11/2021 6/12/2021 10.30 AM
Raft
2 27.27 KRDCL/KMV/STR/6089 RCC M-20 Concrete Pouring for Drain Raft 02+185 02+195 10 LHS 6/11/2021 6/12/2021 10.45 AM
Shuttering and Reinforcement Checking for Drain
3 28.8.2 KRDCL/KMV/STR/6090 02+280 02+288 8 LHS 6/11/2021 6/12/2021 11.00 AM
Raft
4 27.27 KRDCL/KMV/STR/6091 RCC M-20 Concrete Pouring for Drain Raft 02+280 02+288 8 LHS 6/11/2021 6/12/2021 11.15 AM
Shuttering and Reinforcement Checking for Drain
5 28.8.2 KRDCL/KMV/STR/6092 03+575 03+583 8 RHS 6/11/2021 6/12/2021 11.30 AM
Slab
6 27.27 KRDCL/KMV/STR/6093 RCC M-20 Concrete Pouring for Drain Slab 03+575 03+583 8 RHS 6/11/2021 6/12/2021 11.45 AM
Shuttering and Reinforcement Checking for Drain
7 28.8.2 KRDCL/KMV/STR/6094 03+601 03+606 5 RHS 6/11/2021 6/12/2021 12.15 PM
Slab
8 27.27 KRDCL/KMV/STR/6095 RCC M-20 Concrete Pouring for Drain Slab 03+601 03+606 5 RHS 6/11/2021 6/12/2021 12.30 PM
LAB
1 KRDCL/KMV/LAB/38 0 6/11/2021 6/12/2021
2 0

SURVEY
1 KRDCL/KMV/SUR/22 0 6/11/2021 6/12/2021
2
3