You are on page 1of 3

University of Nueva Caceres

City of Naga
COLLEGE OF ENGINEERING & ARCHITECTURE
---------------------------------------------------------------------------------------------------------------------

I. PROJECT SUMMARY

Name of Activity : Solar Panel Familiarization, Installation and Hand-s On Training


Purpose : To promote the CSR
Date : May 11, 2021
Beneficiaries : Angat Buhay Village Lupi, Cam Sur
Participants : 20 persons recommended by the Brgy. Captain
Project Proponent : UNC-Mechanical Engineering Department

II. RATIONALE

This project is a community extension venture that will benefit the residents of: Angat Buhay
Village in Lupi Camarines Sur. The College of Engineering & Architecture, ME Department will
sponsor training on the basic concepts on Solar Panel through Technical Information including
installation. Likewise, this project intends to strengthen Community Social Responsibility of
the UNC by providing free training to those who need the most and wanted to upgrade their
technical skills.

III. OBJECTIVE

This proposed activity principally aims to provide the beneficiaries the basic skills in Solar
Installation and provide more career opportunities for them. Also, this project seeks to:
 Sharing knowledge and skills through technical information and a hands – on
training for Solar Panel;
 Make a positive impact to the lives of both the beneficiaries and benefactors
which will, consequently, strengthen the community
 Gain a greater understanding of the roles of Mechanical Engineers in the society,
as well as the impact of their contributions to the society

IV. PROJECT DESCRIPTION

The Training on Solar Panel Installation is a Project of the Mechanical Engineering Department
for the second semester, academic year 2020 – 2021.
The project will involve the Philippine Society of Mechanical Engineers Student Unit – UNC
(PSME Student Unit-UNC), all ME faculty members in cooperation with the College of
Engineering and Architecture, and UNC ICES. The training will be facilitated by ME faculty who
has an experience on Solar installation.

The training will be held on May 29 and June 5 ,2021 at 8:00-12:00 noon

V. COMPLETION STRATEGIES

 May 7-15, 2021


o General Planning
o Designation of Working Committees
o Formulation of the General Program of the Project
o Approval of the project
o Coordination with the barangay in Lupi

 May 17 – 20, 2017


o Preparation for the training
o Purchase of Materials

-------------------------------------------------------------------------------------------------------------------------------------
We serve fast, we serve right…. 472-6100 Loc. 121
University of Nueva Caceres
City of Naga
COLLEGE OF ENGINEERING & ARCHITECTURE
---------------------------------------------------------------------------------------------------------------------
 May 29 and June 5, 2021
o Day of Training

VI. PROJECT TIMELINE

 April 26, 2021- Project Concept


 May 2, 2021 - Consultation
 May 12, 2021 – Submission of Project Proposal
 May 19, 2021 – Purchase of Solar Panel Kit and accessories
 May 29, 2021 – Training on Solar Installation

Project : Solar Panel Installation Training


Project Proponent: CEA Mechanical Engineering Dept.
University of Nueva Caceres

Days to
Task Description Start Date complete
Task 1 Project Concept 16-Apr-21 8
Task 2 Consultation 24-Apr-21 8
Task 3 General Planning 02-May-21 9
Task 4 Formulation of the General Program of the Project 11-May-21 2
Task 5 Designation of Working Committees 13-May-21 2
Task 6 Approval of the project 15-May-21 2
Task 7 Coordination with the barangay in Lupi 17-May-21 2
Task 8 Purchase of Materials 19-May-21 1
Task 9 Preparation for the training Day 1 20-May-21 9
Task 10 Day 1 of Training 29-May-21 1
Task 11 Preparation for the training Day 2 30-May-21 6
Task 12 Day 2 of Training 5-June-21 1

-------------------------------------------------------------------------------------------------------------------------------------
We serve fast, we serve right…. 472-6100 Loc. 121
University of Nueva Caceres
City of Naga
COLLEGE OF ENGINEERING & ARCHITECTURE
---------------------------------------------------------------------------------------------------------------------

VII. PROPOSED BUDGET ALLOCATION AND SOURCE OF FUND

BUDGET ALLOCATION

Kit (See attached Quotation) P 5,000.00


Snacks 2,000.00
Secretariat 1,000.00
Miscellaneous 2,000.00

TOTAL: P 10,000.00

All expenses will be taken from the community extension budget of the college.

VIII. WORKING COMMITTEE

In order to ensure the success of the activity, core groups will form committees from the
PSME Student Unit– UNC Student Chapter and the Mechanical Engineering Department. The
said committees are:
- Logistics Committee
- Secretariat Committee
- Committee on Finance
- Technical and Documentation Committee

Prepared by:

ENGR. JOSE ANTONIO RODAVIA JR.


Project Lead

Noted:

ENGR. DIANA QUINONES


ICES Coordinator

ENGR. EDWIN BADIOLA


Program Head- ME

ENGR. CHRISTINE BAUTISTA


Dean

FRANCISCA M. SABDAO
ICES Director

Approved:

NORA ELIZABETH F. MANIQUIZ


VP for Research and Extension

-------------------------------------------------------------------------------------------------------------------------------------
We serve fast, we serve right…. 472-6100 Loc. 121

You might also like