You are on page 1of 2

Score:

Republic of the Philippines


Department of Education
Region III – Central Luzon
Division of Science City of Muñoz
Muñoz National High School-Main Junior High School
Bantug West, Bantug, Science City of Muñoz, Nueva Ecija _________________
Parent’s Signature
LEARNING ACTIVITY SHEETS
Grade 9 – Mathematics
Week 2 Quarter 2
Module 2-Applications of Variations

Name of Learner: _________________________________________Grade and Section: ____________________

Activity 1. Choose the most reasonable answer listed for each item. Write your answer on the space
provided before each item. (1 point each)

_____1. The number of days (d) needed in repairing a house varies inversely as the number of men (m)
working. What is the constant (k) of variation?
d m
a. k= b. k= c. k = dm d. m = kd
m d
_____2. The area of the wall to the amount of paint used to cover it. Which variation is correct?
a. Direct Variation b. Joint Variation c. Inverse Variation d. Combined Variation
_____3. The time spent biking to the rate at which the person bikes. Which of the following variation
corresponds to the given statement?
a. Direct Variation b. Joint Variation c. Inverse Variation d. Combined Variation
_____4. The amount of gasoline used by a car varies jointly as the distance travelled and the square
root
of the speed. Suppose a car used 25 liters on a 100-kilometer trip at 100 km/hr. About how
many liters will it use on a 150- kilometer trip at 64 km/hr?
a. 7 liters b. 30 liters c. 25 liters d. 4 liters
_____5. The intensity I of light from the bulb is inversely proportional to the square of the distance s
from the bulb. If I = 35 w/m2 when the distance s = 10 m. Find the intensity of the light from
the bulb at a distance of 5 m.
140 180
a. w/m2 b. w/m2 c. 180 w/m2 d. 140 w/m2
35 35
Activity 2. Solve the problem below and show your solutions.

Problem: The number of hours required to paint a Math room varies inversely as the number of
persons on the job. If 6 persons require 8 hours to finish the job, how long should it take for 12
persons to paint the Math room? (5 points – Follow the steps and show your solutions at the back)

Ang LAL na ito ay ilalagay ng guro sa huling bahagi ng WHLP.

LEARNING ACTIVITY LOG o LAL (TALAAN NG MGA GAWAING PANGKAALAMAN)

Lagyan ng Tsek ( / ) ang Oo kung nagawa ng mag-aaral ang gawain at


Asignatura: lagyan naman ng Tsek (/) ang Hindi kung hindi nagawa.. Isulat ang inyong
/ suhestiyon: maaring ito ay dahilan bakit hindi natapos o nagawa ang 
Pamagat /Bilang ng
Araw/ Oras gawain,  puna o problema, isyu at tanong na naranasan na nais bigyan
Gawain
linaw sa pagsubaybay sa mag-aaral para sa pagsasagawa ng mga Gawain.
Modyul __

Oo Score Hindi Suhestiyon


1. What’s More

LUNES MATH 2. What I Can Do

7:40 – 12:00 Module 2 3. Assessment

4. LAS
Note: Practice Personal Hygiene Protocols at all times.

You might also like