Customer Name : Beta Tech Specimen : Cylinder Project : STC-NEIDC-P2-4DC Makkah strength @ 28d : 40 Mpa مركز بيانات لشركةSTC Slump at site : 150±30 mm Location : Makkah N Max Size CA : 19 mm Temperature : 32 ˚c Batch wt /m³
Materiale unit Type Quantity Source Sp . Gr Reference
Cement Kg SRC 440 Yanbu 3.15 ASTM C150 Microsilica Kg m.s 0 Masheed 2.2 ASTM C1240 3/4" Aggregates Kg Crushed 548 saud alsaadi 2.85 ASTM C33 1/2" Aggregates Kg Crushed 0 saud alsaadi 2.84 ASTM C33 3/8" Aggregates Kg Crushed 448 saud alsaadi 2.82 ASTM C33 Sand Kg natural 828 Makkah 2.63 ASTM C33 free water Kg 168 Tahlia 1 ASTM C94 Admixture 1 Kg Sp 8.5 Weber 1.218 ASTM C494 Admixture 2 Kg Ret. 0.0 Weber 1.100 ASTM C494 Air Voids 2.0% ASTM C231 Total 2441 volume/m³ proportion of aggregates Water cement 0.1397 0.9 45.4% Free water 168 Micro silica 0.0000 C. Agg 54.6% Adjustment 18 Water 0.1680 3/4 C.Agg 55% Total water 186 Volume of Air Voids 0.0200 Volume of 3/4" 0.1923 3/8 C.Agg 45% Volume of 1/2" 0.0000 Volume of 3/8" 0.1589 Volume of sand 0.3148 Volume of Add1 0.0070 Volume of Add2 0.0000 Total Volume 1.00 F.M 2.7 W/C 0.38 Remarks *to increase workability at site type F plasticizer can be add 1 liter /m3 *During the trial mix we can use the actual absorption and moisture *During the trial mix we can increase or reduce admixture depending on nature of material
Note prepared by Use concrete before 120 minutes from the time of batching Eng / Shamshad Ali QA/QC Manager