WRITTEN ASSIGNMENT WORK (85%)

PRINCIPLES OF BIM - DIBAM MSC PROGRAMME

Written Assignment Brief 2020/21

Written Assignment Brief (85% of Module mark)

You are a consultant engineer with TB Solutions Ltd (TBS). TBS is a large firm of consultants (similar to ARUP –
see www.arup.com) who are often asked to give an opinion on business solutions in general areas of the built
environment.

You have been asked by an English Premier League football club, Diamond Castle FC (DCFC), to give an
opinion on the advantages of using modern BIM techniques throughout the various development phases for their
new stadium from inception through to post occupancy. In particular, your clients wish to know if it is normal,
safe and secure to have no traditional plans as a back-up system.

The new stadium is located close to a business park, which has recently been developed on the outskirts of a
small town just outside the London ring road, the M25. The only unusual aspect in relation to this development is
a large decorative arch, which will rise high above the closing roof. The initial ideas for the stadium have been
compared by many in concept to Wembley Stadium London – this may therefore be a useful comparable for
professional purposes.

DCFC are keen to benefit from modern digital development systems and tools that they have been told will help
create a more cost effective long-term environment for fans and staff. They also wish the new premises to be
more environmentally friendly.

MSc in Digital Innovation in the Built asset Management


Institute for Digital Innovation in the Built Environment
WRITTEN ASSIGNMENT WORK (85%)

PRINCIPLES OF BIM - DIBAM MSC PROGRAMME

You have been asked to give an opinion in report form (but fully referenced) on the advantages and
disadvantages of adopting BIM in the development. Whilst your report should deal with the design and
construction phases, DCFC are particularly keen to establish the long-term value of the BIM model in the
management of the stadium as an asset and in its operation as a facility.

You should make such other assumptions as are necessary to effectively address the brief. You are limited to
2000 words and the work should be fully referenced. See Moodle for deadline and submission details.

Marks (see attached marking scheme) – these total to 100% of the 85% attainable for the written assignment
Outline of problem: 20
Discussion and analysis: 50
Conclusions: 20
Overall quality: 10

MSc in Digital Innovation in the Built asset Management


Institute for Digital Innovation in the Built Environment
WRITTEN ASSIGNMENT WORK (85%)

PRINCIPLES OF BIM - DIBAM MSC PROGRAMME


Marking scheme 2019-2020

Section Wgts. A B C D E
70% plus 60-69% 50-59% 40-49% 39% and less
Outline of 20% Evidence of significant reading Evidence of wide reading Some evidence of extra- Very little evidence Little or no
problem followed by original and excellent understanding curricular reading. Main of reading with no evidence of
interpretation of the of literature. Some original objectives of the clear focus to the reading. Little
assignment brief within a interpretation of the assignment brief covered assignment and understanding of
focused conceptual assignment brief that to a competent standard. poorly developed what was
framework and context. Clear addresses the module Generally descriptive in context. required.
and challenging position learning outcomes. Clear approach with a limited
statement that addresses the position statement and position statement.
module learning outcomes. context.
Discussion 50% An excellent selection of Good grasp of the key issues Good familiarity with A general All aspects of the
and analysis information, theory, principles and concepts related to the concepts underpinning the understanding of project have been
and concepts used to address learning outcomes. Depth of learning outcomes, but concepts with handled badly,
the learning outcomes. understanding and good little evidence of original general descriptive with no
Depth of understanding, evidence of original thought thought. Correct analysis of material and little understanding or
original and critical thought demonstrated. A good the problem evaluated to a evidence of critical confusion of
clearly demonstrated. critical approach to the competent standard, but thought. techniques used
Discussion arguments based question, argued from a little critical reflection.
on sound evidence applied in number of points of view.
an imaginative way.
Conclusions 20% Conclusion provides concrete Conclusion provides Conclusion provides Conclusion Conclusions
points that have the potential concrete points supported in generic points that lack provides less absent or
to make a significant the discussion and analysis. clear focus. developed points unformed.
contribution to field. from discussion.

Overall 10% Excellent write up – structure, Good project write up with Write up is not fully Write up is poor, Major failure in
quality grammar and references – very clear logical structure coherent, rushed, and unstructured, some write up structure
with only minor faults, highly and good presentation of contains some errors or parts missing, and with missing

MSc in Digital Innovation in the Built asset Management


Institute for Digital Innovation in the Built Environment
WRITTEN ASSIGNMENT WORK (85%)

PRINCIPLES OF BIM - DIBAM MSC PROGRAMME


readable, extremely clear with data with good and accurate irrelevant material with writing needing parts, very poor
excellent structure Excellent use of reference material general references. significant readability, not at
use of reference material improvement. all clear.
correctly and consistently
cited.