You are on page 1of 39

SITE SURVEY REPORT

3G Overlay Comcel Haiti_Minilink TN


SITE NAME:
SITE ID:
2 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

GENERAL INFORMATION

Site ID: Site name:

1 Site Information

1.1 Address:*)

1.2 System to be installed: Minilink TN

1.3 Date of site visit:

1.4 Site visit performed by:

1.5 Participants at the site visit:

1.6 Preliminary installation start:

2 Customer References

2.1 Company name: COMCEL Phone no:

2.2 Address: Canapevert

2.3 Contact person (1): Phone no:


2 Co Phone no:…………………………..

2.4 Contact person (2): Phone no:

3 Property Owner / Facilities Contact References (If Cosite)

3.1 Company name: Phone no:

3.2 Owner contact person: Phone no:

3.3 Facilities contact person: Phone no:

4 Ericsson References (ASP Responsible)

4.1 Company name: Phone no:

4.2 Address:

4.3 Contact person (1): Phone no:

4.4 Contact person (2): Phone no:


3 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

5 Local regulations

5.1 Are there any special health and safety regulations that need to be
considered? Yes Casilla
No de verificación
Casilla
N/Ade verificación
664
Casilla de 664
verificación
If yes, note which ones:

5.2 Is the site located in an earthquake area? Yes Casilla


No de verificación
Casilla
N/Ade verificación
664
Casilla de 664
verificación

5.3 Are there any other local regulations, which will effect the installation
on this site? Yes Casilla
No de verificación
Casilla
N/Ade verificación
664
Casilla de 664
verificación
If yes, note which ones:

5.4 Other:

6 Site Access

6.1 Are there any special site accessibility requirements that need
to be considered? Yes No de verificación
Casilla N/Ade verificación
Casilla 664
Casilla de 664
verificación
If yes, note which ones:

6.2 Mark on the map if any, where the site is located.

6.3 Note the road description: *)

6.4 Do the visitors need to register and/or obtain working pass? Yes No de verificación
Casilla N/Ade verificación
Casilla Casilla de664
664 verificación
If yes, note location of security office / Fire Command Center:

6.5 Are there any working hours restrictions? Yes No de verificación


Casilla N/Ade verificación
Casilla Casilla de664
664 verificación
If yes, note allowed working hours:

6.6 Are there any other site access restrictions? *) Yes No de verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If yes, note what:

6.7 Is use of GPS receiver instrument allowed at the site? Yes No de verificación
Casilla N/Ade verificación
Casilla Casilla de664
664 verificación
Which are the geographical coordinates for the site?

Map datum used in GPS:

6.8 Other:
4 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

7 Material Transportation and Handling

7.1 Are the roads to the site suitable for material transportation and
working vehicles? *) Yes No de verificación
Casilla Casilla de664
N/Ade verificación
Casilla 664 verificación

7.2 Check the material handling at the site. *)


Is the site area suitable for material handling? Yes Casilla
No de verificación
Casilla Casilla de664
N/Ade verificación
664 verificación
If no, note why not:

Is there a loading bay or ramp for unloading? Yes Casilla


No de verificación
Casilla
N/Ade verificación
664
Casilla de 664
verificación
Is there a freight elevator or hoist for unloading? Yes No de verificación
Casilla N/Ade verificación
Casilla 664
Casilla de 664
verificación
Is there a separate unpacking and storage room? Yes No de verificación
Casilla N/Ade verificación
Casilla 664
Casilla de 664
verificación
If no, where can the goods be stored?

Is there any risk for leakage or flooding in the room? Yes No de verificación
Casilla N/Ade verificación
Casilla 664
Casilla de 664
verificación
Is the room fire protected? Yes No de verificación
Casilla N/Ade verificación
Casilla 664
Casilla de 664
verificación
Can the room be locked? Yes No de verificación
Casilla N/Ade verificación
Casilla 664
Casilla de 664
verificación

Check the material transport routes. *)


Are door openings wide enough? Yes No de verificación
Casilla N/Ade verificación
Casilla 664
Casilla de 664
verificación
Note measurements if critical:
Are stairway cases enough? Yes No de verificación
Casilla N/Ade verificación
Casilla 664
Casilla de 664
verificación
Note measurements if critical:

Is there an elevator/lift? Yes No de verificación


Casilla N/Ade verificación
Casilla 664
Casilla de 664
verificación
If yes, note following: Dimensions: Max load:
Casilla de verificación
Casilla de verificación
664
Casilla de 664
verificación
7.3 Other:

8 Other Casilla de verificación


Casilla de verificación
664
Casilla de 664
verificación

8.1 Verify necessary measurements on the building drawing, if any.

8.2 Is photographing allowed at the site? Yes No de verificación


Casilla N/Ade verificación
Casilla 664
Casilla de 664
verificación
Take pictures, if allowed.
Fill in information about the pictures in the Picture Overview List.

Picture Overview List

Picture No Notes Picture No Notes


1 Pictures must have a order
first take pictures in part of the outdoor
then take pictures in part of the indoor
5 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A


6 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

Project name: Overlay Comcel Haiti Minilink project

Site ID: Site name:

1 Equipment Information

Fill in the type of equipment to be installed and data for the equipment in the table below:

Type of equipment Quantity Dimensions Load/weight Configuration Power cons.


W x D x H (mm) (kg) (At extension from → to) (W)
RAU2X 15GHz 260x97x321 4 N/A 96
RAU2X 7GHz 260x97x321 4 N/A 96

2 Site Requirements

2.1 Product/Design properties: Minilink TN

2 Design properties: …………………………………………………………………………………………….

2.2 Power requirements:


Minilink TN we need to -48vdc

2.3 Power consumption: 96 W

2.4 Grounding requirements : Need to be grounded to the nearest grounding bar

3 Equipment Location Investigation

3.1 Equipment location area for: RAU

3.2 Note the route description to the equipment location area:

3.3 Check preparation activities.


Will the equipment be located on:
ground Casillaroofde verificación
wallde verificación
Casilla 664 pole
Casilla mast/tower
de verificación
664Casilla de
664
verificación 664 Casilla deother
verificación
Casilla
664 de verificación 664
If other, specify what:

If the equipment will be installed on the ground, answer following:


Casilla de verificación
Casilla de verificación
664Casilla de
664
verific
Does it seem like the ground needs to be leveled? Yes No N/A
Which conditions are there around the ground?

If the equipment will be installed on the roof, answer following:


Does it seem like the roof need to be leveled? Yes Casilla
Node verificación
Casilla de verificación
N/A 664Casilla de
664
verific
Load capacity, if available:
Which are the construction materials of the roof?
7 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

If equipment will be installed on the wall, answer following:


Is it necessary to smooth the wall? Yes Casilla
Node verificación
Casilla de verificación
N/A 664Casilla de
664
verific

Which is the construction material of the wall?

If equipment will be installed on a pole, note following:


Existing or new? Dimensions:

If equipment will be installed in a mast/tower, note following:


Installation height:

Are there power outlets for tools? Yes Node verificación


Casilla N/A
Casilla de verificación
664Casilla de
664
verific
Is there an existing access control for the equipment? Yes Node verificación
Casilla N/A
Casilla de verificación
664Casilla de
664
verific
If yes, which type of access control?
If no, which type of access control is required?

Are there any existing external alarms installed? Yes Node verificación
Casilla N/A
Casilla de verificación
664Casilla de
664
verific
If yes, which type of alarms?

Is there any existing equipment that physically/mechanically will


affect the new equipment? Yes Node verificación
Casilla N/A
Casilla de verificación
664Casilla de
664
verific
If yes, note what:

3.4 Make a sketch of the equipment location area incl. any existing equipment on the Aerial Placing
Sketch.
Take all necessary measurements and note them on the Aerial Placing Sketch.
At extension and if existing Aerial Placing Information is used as basis, check and verify the
information on the drawing.
Select a location for the equipment to be installed and draw it on the Aerial Placing Sketch/Aerial
Placing Information.
Note all necessary installation measurements.
3.5 Other:

4 Power and Battery Back-up

4.1 Are there existing AC-mains? Yes Node verificación


Casilla N/A
Casilla de verificación
664Casilla de
664
verific
If yes, note following :
Voltage (V): Phases: Frequency (Hz):
Main circuit breaker size (A):

4.2 Is there an existing AC-mains back-up? Yes Node verificación


Casilla N/A
Casilla de verificación
664Casilla de
664
verific
If yes, note following:
Type:
Capacity:

Casilla de verificación
Casilla de verificación
664Casilla de
664
verific
8 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

4.3 Is there an existing AC distribution? Yes Node verificación


Casilla N/A
Casilla de verificación
664Casilla de
664
verific
If yes, note following :
Type:
Voltage (V): Phases: Frequency (Hz):
Note details of AC circuit breakers in the table below:

Type Quantity Rating (A) Position


Main circuit breaker
Required circuit breakers
Available circuit breakers

4.4 Is there existing DC distribution? Yes Node verificación


Casilla N/A
Casilla de verificación
664Casilla de
664
verific
If yes, note following:
Type: Voltage (V):
Note details about DC circuit breaker in the table below:

Type Quantity Rating (A) Position


Main circuit breaker
Required circuit breakers
Available circuit breakers

4.5 Is there an existing battery back-up? Yes Node verificación


Casilla N/A
Casilla de verificación
664Casilla de
664
verific
If yes, note following:
Type:
Capacity:

4.6 Other:

5 Optical Interface (if applicable)

5.1 Will an optical interface link be connected to the equipment? Yes Node verificación
Casilla N/A
Casilla de verificación
664Casilla de
664
verific

5.2 Other:

6 Grounding

6.1 Is there an existing ground electrode (earth conductor/ring),


which can be used? Yes Node verificación
Casilla N/A
Casilla de verificación
664Casilla de
664
verific

Does a new ground electrode need to be installed? Yes Node verificación


Casilla N/A
Casilla de verificación
664Casilla de
664
verific

6.2 Mark the existing ground electrode on the Aerial Placing Sketch. At extension and if existing
Aerial Placing Information is used as basis, check and verify the information on the drawing.
Note all necessary installation measurements.

6.3 Other:
9 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

7 Transmission

7.1 Is there an existing outdoor cabinet for the transmission equipment? Yes Node verificación
Casilla N/A
Casilla de verificación
664Casilla de
664
verific
If yes, note following:
Outdoor cabinet type including standard for mounting brackets:
Available depth for the equipment in the cabinet:
Available height for the equipment in the cabinet:
Make a sketch of the space assigned in the outdoor cabinet for the transmission equipment in
the Equipment Allocation Sketch.

8 Distribution Frames (DFs)

8.1 Distribution Frames (DFs):


Are there any existing DFs? Yes Node verificación
Casilla N/A
Casilla de verificación
664Casilla de
664
verific
If yes, note details in the table below:

DF type Cable type Connector type Traffic interface


(DDF, ODF, etc.) (coax., pair, optical, etc.) (E1, T1, STM-1, etc.)

8.2 Make a DF allocation sketch in the Equipment Allocation Sketch for each concerned DF type,
if this shall be documented.

Note details about DF connection points in the table below:

DF type 1: Quantity Position

Required connection: N/A


Available connection:

DF type 1: Quantity Position

Required connection: N/A


Available connection:

Is a special tool required? Yes Node verificación


Casilla N/A
Casilla de verificación
664Casilla de
664
verific
If yes, which type:

8.3 Other:
10 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

9 Cable Routes

9.1 Are there any existing cable routes, which can be used? Yes Node verificación
Casilla N/A
Casilla de verificación
664Casilla de
664
verific
If yes, note following:
Type: Dimensions:
Available space:

9.2 Do new cable routes need to be installed? Yes Node verificación


Casilla N/A
Casilla de verificación
664Casilla de
664
verific
If yes, note following:
Type: Dimensions:

9.3 Draw the cable routes on the Aerial Placing Sketch. At extension and if existing Aerial Placing
Information is used as basis, check and verify the information on the drawing.
Note all necessary installation measurements.

9.4 Other:

10 Site dependent material data (to be supplied by Ericsson)

10.1 Site cables lengths

Investigate the needed lengths of relevant site cables.

Type of site cables (power, traffic, external alarms, grounding, etc.) Required length (m)
Radio Cable
Grounding Cable
Power supply DC
Cable UTP

10.2 External cabling mechanics

Investigate data for relevant external cabl 1

Type of external cabling mechanics Type of support Required total length


(cable ladder, cable chute, cable tray, etc.) (wall/ground) (m)
Take a note, how is the type of external cabling mechanics

10.3 Other:

### Other
Take pictures to back up the notes, if allowed.
Fill in information about the pictures in the Picture Overview List
11 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

Sketch (Aerial Placing)


12 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

Sketch (Equipment Allocation)


13 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

Picture Overview List

Picture No Notes Picture No Notes


14 (39)

Casilla de verificación 664

Casilla de verificación 664


15 (39)

Casilla de verificación 664

Casilla de verificación 664


Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664


16 (39)

Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664


17 (39)

Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664


18 (39)

Casilla de verificación 664

Casilla de verificación 664


19 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

Project name: Overlay Comcel Haiti Minilink project

Site ID: Site name:

1 EQUIPMENT INSTALLATION DATA

1.1 Link Facing to:

EXISTING MW NEW MW
Antenna
Number of antennas
Antenna Azimuth (Deg)
Antenna Elevation (Deg)
Antenna module type (GHz)
Antenna diameter (m)
Antenna height (m a g l)
Antenna Polarization
Antenna Mounting
Waveguide length (m)
Antenna support type (mast)

Radio
Radio unit type RAU ERICSSON
Radio unit sub-band
Number of radio units

Power Splitter
Type Asymmetric
Mounting type
Waveguide length (m)
Radio cable
Radio cable length (m)
20 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

Project name: Overlay Comcel Haiti Minilink project

Site ID: Site name:

1 Antenna Information

Fill in the type of antenna products to be installed and data for the antenna products
in table below:

Type of antenna product Dimensions Weight Quantity Direction Tilting Height


WxDxH (kg) sector & (m.a.g.l.)
(mm) bearing
0.6 , 7/8 GHz 658x390x658 14
0.6, 15 GHz 663x 298x663 12
1.20, 7 GHz 1286x666x1286 54
2.4, 7 GHz 2576x1690x2576 247

2 Site Requirements

2.1 Product/Design properties: Minilink Tn

2 Design properties: …………………………………………………………………………………………….


2.2 Grounding requirements: We need -48vdc

2.3 Environment requirements: 30-110 W each terminal

2.4 Proposed minimum placement area: 1-3m2 (each antenna)

2.5 Other:
21 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

3 Antenna Placement Investigation

3.1 Antenna system for:

3.2 Note the route description to the antenna placement area:

3.3 Check preparation activities.


Is there an existing antenna support structure,
which can be used? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació

Does a new antenna support structure need to be supplied? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació

Mark type of antenna support structure and fill in data:

Qty Dimensions
Guyed mast on ground
Self-supported tower on ground
Other structure on ground:

Qty Building Dimensions


height
Guyed mast on roof
Self-supported tower on roof
Pole on roof
Building wall
Other structure on roof:

Qty Dimensions
Other:

If existing antenna support structure is used, is there enough space


for the new antennas and new feeder cables at the calculated
antenna height? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació
If no, describe the problem:
22 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

If there is an existing mast or tower, note following:


Number of legs in the mast/tower:
Shape and size of mast/tower leg at the calculated antenna height:

Distance between legs at the calculated antenna height:


Are the mast/tower diagonals placed on the outside of
the mast/tower? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació
Is the mast/tower inclined where the antenna support is to be fitted? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació
If yes, how many degrees?
Are there any existing antennas installed in the mast/tower? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació
If yes, note following:
Type:
Placement:
Feeder cable support type on the mast/tower:
Existence of climbing ladder? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació

If a new mast or tower is going to be supplied, answer following:


Will the mast/tower be located on: ground roof
Casilla de verificación 664Casilla de verificación 664

If the mast/tower will be installed on the ground, answer following:


Does it seem like the ground needs to be leveled? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació
Which conditions are there around the ground?

If the mast/tower will be installed on the roof, answer following:


Does it seem like the roof needs to be leveled? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació
Load capacity, if available:
If a mast is going to be supplied, is there space enough for
guy wires? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació
Comments:

Is it necessary to smooth the wall? Yes Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació
Which is the construction material of the wall?

Are there power outlets for tools? Yes Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació
Is there an existing access control for the antenna placement area? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació
If yes, which type of access control?
If no, which type of access control is required?

Is there any existing equipment that physically/mechanically will affect


the antenna support structure? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació
If yes, note what:
23 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

3.4 Make a sketch of the antenna placement area including any existing equipment and existing or
new antenna support structure on the Aerial Placing Sketch.
Take all necessary measurements and note them on the Aerial Placing Sketch. At extension
and if existing Aerial Placing Information is used as basis, check and verify the information on
the drawing.

3.5 Mark type of antenna support necessary:


Qty Dimensions Weight
Tubes
Beams
Other:

3.6 Is use of GPS receiver instrument allowed at the site? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació

3.7 Which are the geographical coordinates for the antenna system?
Or if applicable, specify geographical coordinates for each antenna in the table below:

Antenna Geographical coordinates

Map datum used in GPS:

3.8 Fill in antenna directions on the Protractor Sketch.

3.9 Check the compass direction towards a fixed construction e.g. the building and note it on
the Aerial Placing Sketch/Aerial Placing Information.

3.10 Establish suitable antenna locations and mark them on the Aerial Placing Sketch/Aerial Placing
Information.
Note all necessary installation measurements.

3.11 Are there any possible obstacles in the antenna directions? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació
If yes, make a note in the Protractor Sketch.

3.12 Other:
24 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

4 Feeder Cable Routes

4.1 Are there any existing feeder cable routes, which can be used? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació
If yes, note following:
Type: Dimensions:
Available space:

4.2 Do new feeder cable routes need to be installed? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació
If yes, note following:
Type: Dimensions:

4.3 Draw the feeder cable routes on the Aerial Placing Sketch. At extension and if existing Aerial
Placing Information is used as basis, check and verify the information on the drawing.
Note all necessary installation measurements.

4.4 NOTE! Calculate required feeder lengths and fill in site dependent feeder cables data

4.5 Indicate the location of the equipment room/outdoor cabinet on the Aerial Placing Sketch.
At extension and if existing Aerial Placing Information is used as basis, check and verify the
information on the drawing.

4.6 Other:

5 Grounding

5.1 Is there an existing ground electrode (earth conductor/ring),


which can be used? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació

Does a new ground electrode need to be installed? Yes Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació

5.2 If there is an existing mast/tower, is there an existing bonding bar


in the mast/tower, which can be used? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació
If yes, note following:
Free positions:
Terminal screw dimensions:

Does a new bonding bar have to be installed? Yes Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació

Is there an existing lightning conductor in the mast/tower,


which can be used? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació

Does a new lightning conductor have to be installed? Yes Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificació

5.3 Mark the existing ground electrode, bonding bar and lightning conductor on the Aerial Placing Sketch.
At extension and if existing Aerial Placing Information is used as basis, check and verify
the information on the drawing
Note all necessary installation measurements.

NOTE! Fill in site dependent grounding cables data

5.4 Other:
25 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A


26 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

6 Site dependent material data (to be supplied by Ericsson)

6.1 Feeder and site cables lengths

Investigate the needed lengths of relevant feeder and site cables.

Antenna Type of feeder cable Feeder cable length (m)


TZC 595

Type of site cables (grounding, etc.) Required length (m)


Cable for grounding 16mm2

6.2 External cabling mechanics

Investigate data for relevant external cabling mechanics.

Type of external cabling mechanics Type of support Required total length


(cable ladder, cable chute, cable tray, etc.) (wall/ground) (m)
N/A N/A N/A

6.3 Other:
27 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

7 Other

7.1 Take pictures if allowed.


Fill in information about the pictures in the Picture Overview List.

Sketch (Aerial Placing)


28 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

Sketch (Protractor)

Comments: (e.g. obstacles seen from site within a radius of Casilla de100-500m
verificaciónor
664 1-5
Casilla dekm)
verificación 664
29 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

Picture Overview List

Picture No Notes Picture No Notes


30 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

Project name: Overlay Comcel Haiti Minilink project

Site ID: Site name:

1 Equipment Information

Fill in the type of equipment to be installed and data for the equipment in the table below:

Type of equipment Quantity Dimensions Floor load/ Configuration Power cons.


W x D x H (mm) weight (kg) (At extension from → to) (W)
AMM6P 4383x 240 x133 6.4 Kg 4 E1 to 63 E1 30-110 W
AMM20P 4383x240 x300 7 Kg 4 E1 to 63 E1 (Each link) 30-110 W

2 Site Requirements

2.1 Product/Design properties: Minilink Tn

2 Design properties: …………………………………………………………………………………………….

2.2 Power requirements: We need -48vdc

2.3 Power consumption: 30-110 W each terminal

2.4 Heat dissipation:

2.5 Grounding requirements: Need to be grounded to the nearest grounding bar

2.6 Environment requirements: Operational temperature -50°C to+60°C (Outdoor full functionality)
Operational temperature -25°C to+55°C (Indoor full functionality)

2.7 Proposed minimum equipment room dimensions: We need 6u in 1 rack 19''

2.8 Other:
31 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

3 Equipment Room Investigation

3.1 Equipment room for:

3.2 Note the route description to the equipment room:

3.3 Check preparation activities.


Note construction materials in the room:
Walls: Floor: Ceiling:

Will painting of walls, floor and/or ceiling be necessary? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If yes, note where:

Will new flooring be necessary? Yes Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
Does it seem like the floor needs to be leveled? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
Load capacity, if available:

Is there an existing raised floor? Yes Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
Type: Height:
Tile dimension: Load capacity, if available:

Are there any windows that might have to be covered? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
Are there power outlets for tools? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
Is there sufficient lighting? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
Is the room tidy and clean? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If no, what needs to be taken care of?

Is the room fire protected? Yes Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
Is the room lockable? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación

Is there an existing air-conditioning? Yes Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
Type:
Capacity:

Are there any existing external alarms installed? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If yes, which type of alarms?

Is there any existing equipment that physically/mechanically will


affect the new equipment? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If yes, note what:

3.4 Make a sketch of the equipment room including any existing equipment on the Floor Plan Sketch.
Take all necessary measurements including ceiling height and note them on the Floor Plan Sketch.
At extension and if existing Floor Plan Drawing is used as basis, check and verify the information
on the drawing.
Select a location for the equipment to be installed and draw it on the Floor Plan Sketch/Floor
Plan Drawing.
Note all necessary installation measurements including installation height above floor level
if applicable.

3.5 Other:
32 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

4 Power and Battery Back-up

4.1 Are there incoming AC-mains available? Yes Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If yes, note following :
Voltage (V): Phases: Frequency (Hz):
Main circuit breaker size (A):

4.2 Are the AC-mains provided with Over Voltage Protection (OVP)? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If yes indicate type of OVP:

4.3 Is there an existing AC-mains back up? Yes Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If yes, note following:
Type:
Capacity:

4.4 Is there an existing AC distribution? Yes Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If yes, note following:
Type:
Voltage (V): Phases: Frequency (Hz):
Note details of AC circuit breakers in the table below:

Type Quantity Rating (A) Position


Main circuit breaker
Required circuit breakers
Available circuit breakers

4.5 Is there existing DC distribution? Yes Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If yes, note following:
Type: Voltage (V):
Note details about DC circuit breaker in the table below:

Type Quantity Rating (A) Position


Main circuit breaker
Required circuit breakers
Available circuit breakers

4.6 Is there an existing battery back-up? Yes Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If yes, note following:
Type:
Capacity:

4.7 Other:
33 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

5 Optical Interface (if applicable)

5.1 Will an optical interface link be connected to the equipment? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación

5.2 Other:

6 Grounding

6.1 Is there incoming earth available? Yes Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación

6.2 Is there an existing Main Earth Terminal (MET) in the equipment room,
which can be used? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If yes, note following:
Free positions:
Terminal screw dimensions:

Does a new MET have to be installed? Yes Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación

6.3 Mark the MET on the Floor Plan Sketch. At extension and if existing Floor Plan Drawing
is used as a basis, check and verify the information on the drawing.
Note all necessary installation measurements including installation height above floor level.

6.4 Other:

7 Transmission

7.1 Is there an existing rack/cabinet for the transmission equipment? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If yes, note following:
Rack/cabinet type:
Rack/cabinet hole pattern:
Available depth for the equipment in the rack/cabinet:
Available height for the equipment in the rack/cabinet:
Make a sketch of the space assigned in the rack/cabinet for the transmission equipment in
the Equipment Allocation Sketch.

If new rack/cabinet is going to be installed, suggest fastening type:

Make sure to include the transmission rack/cabinet on the Floor Plan Sketch.

7.2 Other:
34 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

8 Distribution Frames (DFs)

8.1 Are there any existing DFs? Yes Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If yes, note details in the table below:

DF type Cable type Connector type Traffic interface


(DDF, ODF, etc.) (coax., pair, optical, etc.) (E1, T1, STM-1, etc.)

8.2 Make a DF allocation sketch in the Equipment Allocation Sketch for each concerned DF type,
if this shall be documented.

Note available DF connection points in the tables below:

DF type 1: Quantity Position

Required connection: N/A


Available connection:

DF type 2: Quantity Position

Required connection: N/A


Available connection:

Is a special tool required? Yes Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If yes, which type:

8.3 Other:

9 Synchronization (if applicable)

9.1 Is there any existing synchronization source? Yes Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If yes, note following:
Type:
Connection points for synchronization:
Numbers of connectors: Connector type:
Is there a synchronization scheme for the equipment at the site? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación

Is there a priority diagram for the equipment at the site? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación

9 Other:
35 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

10 Cable Inlets and Routes

10.1 Are there any existing cable inlets, which can be used? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If yes, note following:
Dimensions: Inlet height:
Available cable glands:

10.2 Do new cable inlets need to be installed? Yes Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If yes, note following:
Dimensions: Inlet height:

10.3 Draw the cable inlets on the Floor Plan Sketch. At extension and if existing Floor Plan
Drawing/Cable Way Drawing is used as basis, check and verify the information on the drawing.
Note all necessary installation measurements including installation height above floor level.

10.4 Are there any existing cable routes, which can be used? Yes Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If yes, note following:
Type: Height:
Dimensions: Available space:

10.5 Do new cable routes need to be installed? Yes Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If yes, note following:
Type: Height:
Dimensions:

10.6 Draw the cable routes on the Floor Plan Sketch. At extension and if existing Floor Plan
Drawing/Cable Way Drawing is used as a basis, check and verify the information on the drawing.
Note all necessary installation measurements including installation height above floor level.

10.7 Other:
36 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

11 Site dependent material data (to be supplied by Ericsson)

11.1 Site cables lengths

Investigate the needed lengths of relevant site cables.

Type of site cables (power, traffic, external alarms, grounding, etc.) Required length (m)
Power DC
Coaxial Cable 75 Ohmios
UTP cable
Grounding Cable
And others you suggest

11.2 External cabling mechanics

Investigate data for relevant external cabling mechanics.

Type of external cabling mechanics Type of support Required total length


(cable ladder, cable chute, cable tray, etc.) (ceiling/wall/floor) (m)
If something is requiered like a cable ladder

11.3 Other:
37 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

Sketch (Floor Plan)


38 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

Sketch (Equipment Allocation)


39 (39)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 14-Mar-11 A

Picture Overview List

Picture No Notes Picture No Notes

You might also like