SITE SURVEY REPORT

3G Overlay Comcel Haiti_Minilink TN


SITE NAME: ROUSSEAU
SITE ID: 1047
2 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

GENERAL INFORMATION

Site ID: 1047 Site name: Rousseau

1 Site Information

1.1 Address:*)

1.2 System to be installed: Minilink TN

1.3 Date of site visit: Jun 17, 2011

1.4 Site visit performed by: VTE

1.5 Participants at the site visit: Nelson Azuaje, Yham echezuria

1.6 Preliminary installation start:

2 Customer References

2.1 Company name: COMCEL Phone no:

2.2 Address: Canapevert

2.3 Contact person (1): Rudy Jugne Phone no: 34410244


2 Co Phone no:…………………………..

2.4 Contact person (2): Phone no:

3 Property Owner / Facilities Contact References (If Cosite)

3.1 Company name: VTE GLOBAL Phone no:

3.2 Owner contact person: Orlando Lopez Phone no: 31803916

3.3 Facilities contact person: Pedro Gonzalez Phone no: 31261385

4 Ericsson References (ASP Responsible)

4.1 Company name: Phone no:

4.2 Address:

4.3 Contact person (1): Daniela Casco Phone no: 34052328

4.4 Contact person (2): Phone no:


3 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

5 Local regulations

5.1 Are there any special health and safety regulations that need to be
considered? Yes Casilla
Node✘ verificación
Casilla
N/Ade verificación
664
Casilla de664
verificación
If yes, note which ones: You can open the door with te combination, and you have to look the key
of the shelter at the noc

5.2 Is the site located in an earthquake area? Yes ✘ Casilla


Node verificación
Casilla
N/Ade verificación
664
Casilla de664
verificación

5.3 Are there any other local regulations, which will effect the installation
on this site? Yes ✘ Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If yes, note which ones: Have to notificate to NOC

5.4 Other:

6 Site Access

6.1 Are there any special site accessibility requirements that need
to be considered? Yes Node✘ verificación
Casilla N/Ade verificación
Casilla 664
Casilla de 664
verificación
If yes, note which ones:

6.2 Mark on the map if any, where the site is located.


You have to see the map in folder PDF
6.3 Note the road description: *)

6.4 Do the visitors need to register and/or obtain working pass? Yes Node✘ verificación
Casilla N/A
Casilla Casilla de664
de verificación
664 verificación
If yes, note location of security office / Fire Command Center:

6.5 Are there any working hours restrictions? Yes Node✘ verificación
Casilla N/A
Casilla Casilla de664
de verificación
664 verificación
If yes, note allowed working hours:

6.6 Are there any other site access restrictions? *) Yes Node✘ verificación
Casilla N/A
Casilla de verificación
664
Casilla de664
verificación
If yes, note what:

6.7 Is use of GPS receiver instrument allowed at the site? Yes ✘ Casilla
Node verificación
N/A
Casilla Casilla de664
de verificación
664 verificación
Which are the geographical coordinates for the site? 18.511290° -72.289520°

Map datum used in GPS: WGS 84

6.8 Other:
4 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

7 Material Transportation and Handling

7.1 Are the roads to the site suitable for material transportation and
working vehicles? *) Yes ✘ Node verificación
Casilla N/A
Casilla Casilla de664
de verificación
664 verificación

7.2 Check the material handling at the site. *)


Is the site area suitable for material handling? Yes ✘ Node verificación
Casilla N/A
Casilla Casilla de664
de verificación
664 verificación
If no, note why not:

Is there a loading bay or ramp for unloading? Yes Node✘ verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
Is there a freight elevator or hoist for unloading? Yes Node✘ verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
Is there a separate unpacking and storage room? Yes Node✘ verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If no, where can the goods be stored? have to according with building person

Is there any risk for leakage or flooding in the room? Yes Node✘ verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
Is the room fire protected? Yes Node✘ verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
Can the room be locked? Yes ✘ Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación

Check the material transport routes. *)


Are door openings wide enough? Yes ✘ Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
Note measurements if critical:
Are stairway cases enough? Yes ✘ Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
Note measurements if critical:

Is there an elevator/lift? Yes Node✘ verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
If yes, note following: Dimensions: Max load:
Casilla de verificación
Casilla de verificación
664
Casilla de664
verificación
7.3 Other:

8 Other Casilla de verificación


Casilla de verificación
664
Casilla de664
verificación

8.1 Verify necessary measurements on the building drawing, if any.

8.2 Is photographing allowed at the site? Yes ✘ Node verificación


Casilla N/Ade verificación
Casilla 664
Casilla de664
verificación
Take pictures, if allowed.
Fill in information about the pictures in the Picture Overview List.

Picture Overview List

Picture No Notes Picture No Notes


1
5 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

Project name: Overlay Comcel Haiti Minilink project

Site ID: 1047 Site name: Rosseau

1 Equipment Information

Fill in the type of equipment to be installed and data for the equipment in the table below:

Type of equipment Quantity Dimensions Load/weight Configuration Power cons.


W x D x H (mm) (kg) (At extension from → to) (W)
RAU2X 15GHz 1 260x97x321 4 N/A 96

2 Site Requirements

2.1 Product/Design properties: Minilink TN

2 Design properties: …………………………………………………………………………………………….

2.2 Power requirements:


Minilink TN needs to install two breakers of -48vdc and 8 Amp.

2.3 Power consumption: Needs two breacker to 8 amp for the new equipment AMM6P

2.4 Grounding requirements : The site needs one grounding bar to 0,50 mts x 0,10 mts on the tower to
ground of the new equipment to install, needs 10 meters of ground cable to conect the new equipment
with the proposal grounding bar

3 Equipment Location Investigation

3.1 Equipment location area for: RAU 2X 15GHz

3.2 Note the route description to the equipment location area: You have to install the new equipment to 8 mts
at the tower existing

3.3 Check preparation activities.


Will the equipment be located on:
ground Casillaroof wallde verificación
de✘verificación
Casilla 664 pole
Casilla mast/tower
de verificación
664Casilla de verificación 664✘ Casilla deother
664 verificación
Casilla
664 de verificación 664
If other, specify what:

If the equipment will be installed on the ground, answer following:


Casilla de verificación
Casilla de verificación
664
✘ Casilla de664
verific
Does it seem like the ground needs to be leveled? Yes No N/A
Which conditions are there around the ground?

If the equipment will be installed on the roof, answer following:


Does it seem like the roof need to be leveled? Yes ✘ Casilla
Node verificación
Casilla de verificación
N/A 664Casilla de664
verific
Load capacity, if available: yes
Which are the construction materials of the roof?
6 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

If equipment will be installed on the wall, answer following:


Is it necessary to smooth the wall? Yes Casilla
Node verificación
Casilla de verificación
N/A 664
✘ Casilla de664
verific

Which is the construction material of the wall?

If equipment will be installed on a pole, note following:


Existing or new? Dimensions:

If equipment will be installed in a mast/tower, note following:


Installation height:

Are there power outlets for tools? Yes Node✘ verificación


Casilla N/A
Casilla de verificación
664Casilla de664
verific
Is there an existing access control for the equipment? Yes ✘ Node verificación
Casilla N/A
Casilla de verificación
664Casilla de664
verific
If yes, which type of access control? Have to notificate to building person
If no, which type of access control is required?

Are there any existing external alarms installed? Yes Node✘ verificación
Casilla N/A
Casilla de verificación
664Casilla de664
verific
If yes, which type of alarms?

Is there any existing equipment that physically/mechanically will


affect the new equipment? Yes Node✘ verificación
Casilla N/A
Casilla de verificación
664Casilla de664
verific
If yes, note what:

3.4 Make a sketch of the equipment location area incl. any existing equipment on the Aerial Placing
Sketch.
Take all necessary measurements and note them on the Aerial Placing Sketch.
At extension and if existing Aerial Placing Information is used as basis, check and verify the
information on the drawing.
Select a location for the equipment to be installed and draw it on the Aerial Placing Sketch/Aerial
Placing Information.
Note all necessary installation measurements.
3.5 Other: The especifications are in the photo report, You can see this to more information.

4 Power and Battery Back-up

4.1 Are there existing AC-mains? Yes Node✘ verificación


Casilla N/A
Casilla de verificación
664Casilla de664
verific
If yes, note following :
Voltage (V): Phases: Frequency (Hz):
Main circuit breaker size (A):

4.2 Is there an existing AC-mains back-up? Yes ✘ Node verificación


Casilla N/A
Casilla de verificación
664Casilla de664
verific
If yes, note following:
Type: SDMO
Capacity: 120 V - 220 V 2 PHASES, 60 Hz

✘ Casilla de verificación
Casilla de verificación
664Casilla de664
verific
7 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

4.3 Is there an existing AC distribution? Yes ✘ Node verificación


Casilla N/A
Casilla de verificación
664Casilla de664
verific
If yes, note following :
Type: No label
Voltage (V): 120 V - 220 V Phases: 2 Frequency (Hz): 60 Hz
Note details of AC circuit breakers in the table below:

Type Quantity Rating (A) Position


Main circuit breaker no label 1 no label
Required circuit breakers 2 8 amp
Available circuit breakers no

4.4 Is there existing DC distribution? Yes Node✘ verificación


Casilla N/A
Casilla de verificación
664Casilla de664
verific
If yes, note following:
Type: Voltage (V):
Note details about DC circuit breaker in the table below:

Type Quantity Rating (A) Position


Main circuit breaker
Required circuit breakers
Available circuit breakers

4.5 Is there an existing battery back-up? Yes Node✘ verificación


Casilla N/A
Casilla de verificación
664Casilla de664
verific
If yes, note following:
Type:
Capacity:

4.6 Other:

5 Optical Interface (if applicable)

5.1 Will an optical interface link be connected to the equipment? Yes Node verificación
Casilla N/A
Casilla de verificación
664
✘ Casilla de664
verific

5.2 Other:

6 Grounding

6.1 Is there an existing ground electrode (earth conductor/ring),


which can be used? Yes ✘ Node verificación
Casilla N/A
Casilla de verificación
664Casilla de664
verific

Does a new ground electrode need to be installed? Yes Node✘ verificación


Casilla N/A
Casilla de verificación
664Casilla de664
verific

6.2 Mark the existing ground electrode on the Aerial Placing Sketch. At extension and if existing
Aerial Placing Information is used as basis, check and verify the information on the drawing.
Note all necessary installation measurements.
The especifications are in the photo report, You can see this to more information.

6.3 Other:
8 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

7 Transmission

7.1 Is there an existing outdoor cabinet for the transmission equipment? Yes ✘ Casilla
Node verificación
N/A
Casilla de verificación
664Casilla de664
verific
If yes, note following:
Outdoor cabinet type including standard for mounting brackets: Unknnow
Available depth for the equipment in the cabinet: 1 x 0,6
Available height for the equipment in the cabinet: 2,20 mts
Make a sketch of the space assigned in the outdoor cabinet for the transmission equipment in
the Equipment Allocation Sketch.
The especifications are in the photo report, You can see this to more information.
8 Distribution Frames (DFs)

8.1 Distribution Frames (DFs):


Are there any existing DFs? Yes ✘ Node verificación
Casilla N/A
Casilla de verificación
664Casilla de664
verific
If yes, note details in the table below:

DF type Cable type Connector type Traffic interface


(DDF, ODF, etc.) (coax., pair, optical, etc.) (E1, T1, STM-1, etc.)
Path Panel Coax RJ 45 E1

8.2 Make a DF allocation sketch in the Equipment Allocation Sketch for each concerned DF type,
if this shall be documented.

Note details about DF connection points in the table below:

DF type 1: Quantity Position

Required connection: N/A


Available connection:

DF type 1: Quantity Position

Required connection: N/A


Available connection:

Is a special tool required? Yes Node verificación


Casilla N/A
Casilla de verificación
664
✘ Casilla de664
verific
If yes, which type:

8.3 Other:
9 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

9 Cable Routes

9.1 Are there any existing cable routes, which can be used? Yes ✘ Node verificación
Casilla N/A
Casilla de verificación
664Casilla de664
verific
If yes, note following:
Type: Ladder Dimensions: 0,40 x 9 mts
Available space:

9.2 Do new cable routes need to be installed? Yes Node✘ verificación


Casilla N/A
Casilla de verificación
664Casilla de664
verific
If yes, note following:
Type: Ladder Dimensions:

9.3 Draw the cable routes on the Aerial Placing Sketch. At extension and if existing Aerial Placing
Information is used as basis, check and verify the information on the drawing.
Note all necessary installation measurements.
The especifications are in the photo report, You can see this to more information.
9.4 Other:

10 Site dependent material data (to be supplied by Ericsson)

10.1 Site cables lengths

Investigate the needed lengths of relevant site cables.

Type of site cables (power, traffic, external alarms, grounding, etc.) Required length (m)
Radio Cable 25 mts
Grounding Cable 10 mts

10.2 External cabling mechanics

Investigate data for relevant external cabli 1

Type of external cabling mechanics Type of support Required total length


(cable ladder, cable chute, cable tray, etc.) (wall/ground) (m)
Take a note, how is the type of external cabling mechanics

10.3 Other:

### Other
Take pictures to back up the notes, if allowed.
Fill in information about the pictures in the Picture Overview List
10 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

Sketch (Aerial Placing)


11 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

Sketch (Equipment Allocation)


12 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

Picture Overview List

Picture No Notes Picture No Notes


13 (42)

✘ Casilla de verificación 664

Casilla de verificación 664


14 (42)

✘ Casilla de verificación 664

Casilla de verificación 664


Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664


15 (42)

Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664

✘ Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664


16 (42)

Casilla de verificación 664

Casilla de verificación 664

✘ Casilla de verificación 664


17 (42)

Casilla de verificación 664

Casilla de verificación 664


18 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

Project name: Overlay Comcel Haiti Minilink project

Site ID: 1047 Site name: Rousseau

1 EQUIPMENT INSTALLATION DATA

1.1 Link Facing to: Canapevert RCN

EXISTING MW NEW MW
Antenna 0.6, 15 GHz 0.6, 15 GHz
Number of antennas 1 1
Antenna Azimuth (Deg) 315 315
Antenna Elevation (Deg) Unknow Unknow
Antenna module type (GHz) 15 15
Antenna diameter (m) 0.6 0.6
Antenna height (m a g l) 8.9 8.3
Antenna Polarization V V
Antenna Mounting Minilink Support Minilink Support Existing
Waveguide length (m) 18 25
Antenna support type (mast) 2" diameter and 1 meter long 2" diameter and 1 meter long

Radio
Radio unit type Microwave ODU RAU ERICSSON
Radio unit sub-band 14795 - 15215 14795 - 15215
Number of radio units 1 1

Power Splitter
Type Asymmetric
Mounting type
Waveguide length (m)
Radio cable
Radio cable length (m) 18 25
19 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

Project name: Overlay Comcel Haiti Minilink project

Site ID: 1047 Site name: Rosseau

1 Antenna Information

Fill in the type of antenna products to be installed and data for the antenna products
in table below:

Type of antenna product Dimensions Weight Quantity Direction Tilting Height


WxDxH (kg) sector & (m.a.g.l.)
(mm) bearing
0,6 15 Ghz 663x 298x663 12 1 315 8

2 Site Requirements

2.1 Product/Design properties: Minilink Tn

2 Design properties: …………………………………………………………………………………………….


2.2 Grounding requirements: The site needs one grounding bar to 0,50 mts x 0,10 mts on the tower to
ground of the new equipment to install, needs 10 meters of ground cable to conect the new equipment
with the proposal grounding bar
2.3 Environment requirements: Needs a grounding bar on the tower to 7,2 meters

2.4 Proposed minimum placement area: 0,7 mts

2.5 Other:
20 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

3 Antenna Placement Investigation

3.1 Antenna system for: Minilink TN

3.2 Note the route description to the antenna placement area: The new antenna is going to be instal
on the existing tower

3.3 Check preparation activities.


Is there an existing antenna support structure,
which can be used? Yes ✘ Node verificación
Casilla N/A
Casilla de verificación
664
Casilla de664
verific

Does a new antenna support structure need to be supplied? Yes Node✘ verificación
Casilla N/A
Casilla de verificación
664
Casilla de664
verific

Mark type of antenna support structure and fill in data:

Qty Dimensions
Guyed mast on ground
Self-supported tower on ground
Other structure on ground:

Qty Building Dimensions


height
Guyed mast on roof
Self-supported tower on roof 1 19 mts 1 m x 2"
Pole on roof
Building wall
Other structure on roof:

Qty Dimensions
Other:

If existing antenna support structure is used, is there enough space


for the new antennas and new feeder cables at the calculated
antenna height? Yes ✘ Node verificación
Casilla N/A
Casilla de verificación
664
Casilla de664
verific
If no, describe the problem:
21 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

If there is an existing mast or tower, note following:


Number of legs in the mast/tower: 3 Legs
Shape and size of mast/tower leg at the calculated antenna height: 90° of tower Leg and
The tower is triangle
Distance between legs at the calculated antenna height: 1 mts
Are the mast/tower diagonals placed on the outside of
the mast/tower? Yes Node✘ verificación
Casilla N/A
Casilla de verificación
664
Casilla de664
verific
Is the mast/tower inclined where the antenna support is to be fitted? Yes Node✘ verificación
Casilla N/A
Casilla de verificación
664
Casilla de664
verific
If yes, how many degrees?
Are there any existing antennas installed in the mast/tower? Yes ✘ Casilla
Node verificación
N/A
Casilla de verificación
664
Casilla de664
verific
If yes, note following:
Type: RF
Placement: One on them is in the same height of microwave antenna, the others two are up the microwave antenna
Feeder cable support type on the mast/tower: No existing
Existence of climbing ladder? Yes ✘ Casilla
Node verificación
N/A
Casilla de verificación
664
Casilla de664
verific

If a new mast or tower is going to be supplied, answer following:


Will the mast/tower be located on: ground roof
Casilla de verificación 664Casilla de verificación 664

If the mast/tower will be installed on the ground, answer following:


Does it seem like the ground needs to be leveled? Yes Node verificación
Casilla N/A
Casilla de verificación
✘664
Casilla de664
verific
Which conditions are there around the ground?

If the mast/tower will be installed on the roof, answer following:


Does it seem like the roof needs to be leveled? Yes Node verificación
Casilla N/A
Casilla de verificación
✘664
Casilla de664
verific
Load capacity, if available:
If a mast is going to be supplied, is there space enough for
guy wires? Yes Node verificación
Casilla N/A
Casilla de verificación
✘664
Casilla de664
verific
Comments:

Is it necessary to smooth the wall? Yes Node✘ verificación


Casilla N/A
Casilla de verificación
664
Casilla de664
verific
Which is the construction material of the wall?

Are there power outlets for tools? Yes Node✘ verificación


Casilla N/A
Casilla de verificación
664
Casilla de664
verific
Is there an existing access control for the antenna placement area? Yes ✘ No N/A
Casilla de verificación
Casilla de verificación
664
Casilla de664
verific
If yes, which type of access control? Have to cordinate with the building personal
If no, which type of access control is required?

Is there any existing equipment that physically/mechanically will affect


the antenna support structure? Yes Node✘ verificación
Casilla N/A
Casilla de verificación
664
Casilla de664
verific
If yes, note what:
22 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

3.4 Make a sketch of the antenna placement area including any existing equipment and existing or
new antenna support structure on the Aerial Placing Sketch.
Take all necessary measurements and note them on the Aerial Placing Sketch. At extension
and if existing Aerial Placing Information is used as basis, check and verify the information on
the drawing.
The especifications are in the photo report, You can see this to more information.
3.5 Mark type of antenna support necessary:
Qty Dimensions Weight
Tubes
Beams
Other:

3.6 Is use of GPS receiver instrument allowed at the site? Yes ✘ Node verificación
Casilla N/Ade verificación
Casilla 664
Casilla de664
verific

3.7 Which are the geographical coordinates for the antenna system? 18.511290° -72.289520°
Or if applicable, specify geographical coordinates for each antenna in the table below:

Antenna Geographical coordinates


0.6, 15 GHz 18.511290° -72.289520°

Map datum used in GPS: WGS 84

3.8 Fill in antenna directions on the Protractor Sketch.

3.9 Check the compass direction towards a fixed construction e.g. the building and note it on
the Aerial Placing Sketch/Aerial Placing Information.

3.10 Establish suitable antenna locations and mark them on the Aerial Placing Sketch/Aerial Placing
Information.
Note all necessary installation measurements.

3.11 Are there any possible obstacles in the antenna directions? Yes Node✘ verificación
Casilla N/A
Casilla de verificación
664
Casilla de664
verific
If yes, make a note in the Protractor Sketch.

3.12 Other: The especifications are in the photo report, You can see this to more information.
23 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

4 Feeder Cable Routes

4.1 Are there any existing feeder cable routes, which can be used? Yes ✘ Node verificación
Casilla N/A
Casilla de verificación
664
Casilla de664
verific
If yes, note following:
Type: Ladder Dimensions: 0,20 x 0,19
Available space:

4.2 Do new feeder cable routes need to be installed? Yes ✘ Node verificación
Casilla N/A
Casilla de verificación
664
Casilla de664
verific
If yes, note following:
Type: Dimensions:

4.3 Draw the feeder cable routes on the Aerial Placing Sketch. At extension and if existing Aerial
Placing Information is used as basis, check and verify the information on the drawing.
Note all necessary installation measurements.

The especifications are in the photo report, You can see this to more information.

4.4 NOTE! Calculate required feeder lengths and fill in site dependent feeder cables data

4.5 Indicate the location of the equipment room/outdoor cabinet on the Aerial Placing Sketch.
At extension and if existing Aerial Placing Information is used as basis, check and verify the
information on the drawing.

4.6 Other: The especifications are in the photo report, You can see this to more information.

5 Grounding

5.1 Is there an existing ground electrode (earth conductor/ring),


which can be used? Yes ✘ Node verificación
Casilla N/A
Casilla de verificación
664
Casilla de664
verific

Does a new ground electrode need to be installed? Yes Node✘ verificación


Casilla N/A
Casilla de verificación
664
Casilla de664
verific

5.2 If there is an existing mast/tower, is there an existing bonding bar


in the mast/tower, which can be used? Yes ✘ Node verificación
Casilla N/A
Casilla de verificación
664
Casilla de664
verific
If yes, note following:
Free positions: 6
Terminal screw dimensions: 0,40 x 0,10 mts

Does a new bonding bar have to be installed? Yes ✘ Node verificación


Casilla N/A
Casilla de verificación
664
Casilla de664
verific

Is there an existing lightning conductor in the mast/tower,


which can be used? Yes ✘ Node verificación
Casilla N/A
Casilla de verificación
664
Casilla de664
verific

Does a new lightning conductor have to be installed? Yes Node✘ verificación


Casilla N/A
Casilla de verificación
664
Casilla de664
verific

5.3 Mark the existing ground electrode, bonding bar and lightning conductor on the Aerial Placing Sketch.
At extension and if existing Aerial Placing Information is used as basis, check and verify
the information on the drawing
Note all necessary installation measurements.

NOTE! Fill in site dependent grounding cables data

5.4 Other: The especifications are in the photo report, You can see this to more information.
24 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

6 Site dependent material data (to be supplied by Ericsson)

6.1 Feeder and site cables lengths

Investigate the needed lengths of relevant feeder and site cables.

Antenna Type of feeder cable Feeder cable length (m)


0.6, 15 GHz TZC 595 25 mts

Type of site cables (grounding, etc.) Required length (m)


Cable for grounding 16mm2 10 mts

6.2 External cabling mechanics

Investigate data for relevant external cabling mechanics.

Type of external cabling mechanics Type of support Required total length


(cable ladder, cable chute, cable tray, etc.) (wall/ground) (m)
N/A N/A N/A

6.3 Other:
25 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

7 Other

7.1 Take pictures if allowed.


Fill in information about the pictures in the Picture Overview List.

Sketch (Aerial Placing)


26 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

Sketch (Protractor)

Comments: (e.g. obstacles seen from site within a radius of Casilla de100-500m
verificaciónor
664 1-5
Casilla dekm)
verificación 664
27 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

Picture Overview List

Picture No Notes Picture No Notes


28 (42)

Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664


29 (42)

Casilla de verificación 664


Casilla de verificación 664

Casilla de verificación 664

ame height of microwave antenna, the others two are up the microwave antenna

Casilla de verificación 664

✘ Casilla de verificación 664

✘ Casilla de verificación 664

✘ Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664


Casilla de verificación 664

Casilla de verificación 664


30 (42)

Casilla de verificación 664

Casilla de verificación 664


31 (42)

Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664

Casilla de verificación 664


32 (42)
33 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

Project name: Overlay Comcel Haiti Minilink project

Site ID: 1047 Site name: Rousseau

1 Equipment Information

Fill in the type of equipment to be installed and data for the equipment in the table below:

Type of equipment Quantity Dimensions Floor load/ Configuration Power cons.


W x D x H (mm) weight (kg) (At extension from → to) (W)
AMM6P 1 4383x 240 x133 6.4 Kg 4 E1 to 63 E1 30-110 W

2 Site Requirements

2.1 Product/Design properties: Minilink Tn

2 Design properties: …………………………………………………………………………………………….

2.2 Power requirements: Minilink TN needs to install two breakers of -48vdc and 8 Amp.

2.3 Power consumption: Needs two breacker to 8 amp for the new equipment AMM6P

2.4 Heat dissipation: Unknow

2.5 Grounding requirements: You can use the existing grounding bar, you have to use 10 meters of grounding cable

2.6 Environment requirements: Operational temperature -50°C to+60°C (Outdoor full functionality)
Operational temperature -25°C to+55°C (Indoor full functionality)

2.7 Proposed minimum equipment room dimensions: We need 6u in 1 rack 19''

2.8 Other:
34 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

3 Equipment Room Investigation

3.1 Equipment room for: AMM6P

3.2 Note the route description to the equipment room: The equipment is going to be install insite the
existing outdoor equipments

3.3 Check preparation activities.


Note construction materials in the room:
Walls: Floor: Ceiling:

Will painting of walls, floor and/or ceiling be necessary? Yes Node✘ verificación
Casilla N/A
Casilla de verificación
664
Casilla de664
verificación
If yes, note where:

Will new flooring be necessary? Yes Node✘ verificación


Casilla N/A
Casilla de verificación
664
Casilla de664
verificación
Does it seem like the floor needs to be leveled? Yes Node✘ verificación
Casilla N/A
Casilla de verificación
664
Casilla de664
verificación
Load capacity, if available:

Is there an existing raised floor? Yes ✘ Node verificación


Casilla N/A
Casilla de verificación
664
Casilla de664
verificación
Type: Concret Height:
Tile dimension: Load capacity, if available:

Are there any windows that might have to be covered? Yes Node verificación
Casilla N/A
Casilla de verificación
✘664
Casilla de664
verificación
Are there power outlets for tools? Yes No ✘ N/A
Casilla de verificación
Casilla de verificación
664
Casilla de664
verificación
Is there sufficient lighting? Yes Node verificación
Casilla N/A
Casilla de verificación
✘664
Casilla de664
verificación
Is the room tidy and clean? Yes Node verificación
Casilla N/A
Casilla de verificación
✘664
Casilla de664
verificación
If no, what needs to be taken care of?

Is the room fire protected? Yes Node✘ verificación


Casilla N/A
Casilla de verificación
664
Casilla de664
verificación
Is the room lockable? Yes ✘ Node verificación
Casilla N/A
Casilla de verificación
664
Casilla de664
verificación

Is there an existing air-conditioning? Yes Node verificación


Casilla N/A
Casilla de verificación
✘664
Casilla de664
verificación
Type:
Capacity:

Are there any existing external alarms installed? Yes Node✘ verificación
Casilla N/A
Casilla de verificación
664
Casilla de664
verificación
If yes, which type of alarms?

Is there any existing equipment that physically/mechanically will


affect the new equipment? Yes Node✘ verificación
Casilla N/A
Casilla de verificación
664
Casilla de664
verificación
If yes, note what:

3.4 Make a sketch of the equipment room including any existing equipment on the Floor Plan Sketch.
Take all necessary measurements including ceiling height and note them on the Floor Plan Sketch.
At extension and if existing Floor Plan Drawing is used as basis, check and verify the information
on the drawing.
Select a location for the equipment to be installed and draw it on the Floor Plan Sketch/Floor
Plan Drawing.
Note all necessary installation measurements including installation height above floor level
if applicable.

3.5 Other: The especifications are in the photo report, You can see this to more information.
35 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

4 Power and Battery Back-up

4.1 Are there incoming AC-mains available? Yes Node✘ verificación


Casilla N/A
Casilla de verificación
664
Casilla de664
verificación
If yes, note following :
Voltage (V): Phases: Frequency (Hz):
Main circuit breaker size (A):

4.2 Are the AC-mains provided with Over Voltage Protection (OVP)? Yes Node verificación
Casilla N/A
Casilla de verificación
✘664
Casilla de664
verificación
If yes indicate type of OVP:

4.3 Is there an existing AC-mains back up? Yes ✘ Node verificación


Casilla N/A
Casilla de verificación
664
Casilla de664
verificación
If yes, note following:
Type: SDMO
Capacity: 120 V - 220 V, 60 Hz

4.4 Is there an existing AC distribution? Yes ✘ Node verificación


Casilla N/A
Casilla de verificación
664
Casilla de664
verificación
If yes, note following:
Type: No label
Voltage (V): 120 V - 220 V Phases: 2 Frequency (Hz): 60 Hz
Note details of AC circuit breakers in the table below:

Type Quantity Rating (A) Position


Main circuit breaker no label 1 no label
Required circuit breakers 2 8 amp
Available circuit breakers no

4.5 Is there existing DC distribution? Yes Node✘ verificación


Casilla N/A
Casilla de verificación
664
Casilla de664
verificación
If yes, note following:
Type: Voltage (V):
Note details about DC circuit breaker in the table below:

Type Quantity Rating (A) Position


Main circuit breaker
Required circuit breakers
Available circuit breakers

4.6 Is there an existing battery back-up? Yes Node✘ verificación


Casilla N/A
Casilla de verificación
664
Casilla de664
verificación
If yes, note following:
Type:
Capacity:

4.7 Other: The especifications are in the photo report, You can see this to more information.
36 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

5 Optical Interface (if applicable)

5.1 Will an optical interface link be connected to the equipment? Yes Node verificación
Casilla N/A
Casilla de verificación
✘664
Casilla de664
verificación

5.2 Other:

6 Grounding

6.1 Is there incoming earth available? Yes ✘ Node verificación


Casilla N/A
Casilla de verificación
664
Casilla de664
verificación

6.2 Is there an existing Main Earth Terminal (MET) in the equipment room,
which can be used? Yes ✘ Node verificación
Casilla N/A
Casilla de verificación
664
Casilla de664
verificación
If yes, note following:
Free positions: 5
Terminal screw dimensions: 0,40 x 0,10 mts

Does a new MET have to be installed? Yes Node✘ verificación


Casilla N/A
Casilla de verificación
664
Casilla de664
verificación

6.3 Mark the MET on the Floor Plan Sketch. At extension and if existing Floor Plan Drawing
is used as a basis, check and verify the information on the drawing.
Note all necessary installation measurements including installation height above floor level.

The especifications are in the photo report, You can see this to more information.

6.4 Other:

7 Transmission

7.1 Is there an existing rack/cabinet for the transmission equipment? Yes ✘ Casilla
Node verificación
N/A
Casilla de verificación
664
Casilla de664
verificación
If yes, note following:
Rack/cabinet type: no label
Rack/cabinet hole pattern:
Available depth for the equipment in the rack/cabinet: 1 x 0,60 mts
Available height for the equipment in the rack/cabinet: 1,70 mts
Make a sketch of the space assigned in the rack/cabinet for the transmission equipment in
the Equipment Allocation Sketch.

If new rack/cabinet is going to be installed, suggest fastening type:

Make sure to include the transmission rack/cabinet on the Floor Plan Sketch.

7.2 Other: The especifications are in the photo report, You can see this to more information.
37 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

8 Distribution Frames (DFs)

8.1 Are there any existing DFs? Yes ✘ Node verificación


Casilla N/A
Casilla de verificación
664
Casilla de664
verificación
If yes, note details in the table below:

DF type Cable type Connector type Traffic interface


(DDF, ODF, etc.) (coax., pair, optical, etc.) (E1, T1, STM-1, etc.)
Path Panel Coax RJ 45 E1

8.2 Make a DF allocation sketch in the Equipment Allocation Sketch for each concerned DF type,
if this shall be documented.

Note available DF connection points in the tables below:

DF type 1: Quantity Position

Required connection: N/A


Available connection:

DF type 2: Quantity Position

Required connection: N/A


Available connection:

Is a special tool required? Yes Node verificación


Casilla N/A
Casilla de verificación
664
Casilla de664
verificación
If yes, which type:

8.3 Other:

9 Synchronization (if applicable)

9.1 Is there any existing synchronization source? Yes Node verificación


Casilla N/A
Casilla de verificación
✘664
Casilla de664
verificación
If yes, note following:
Type:
Connection points for synchronization:
Numbers of connectors: Connector type:
Is there a synchronization scheme for the equipment at the site? Yes Node verificación
Casilla N/A
Casilla de verificación
664
Casilla de664
verificación

Is there a priority diagram for the equipment at the site? Yes Node verificación
Casilla N/A
Casilla de verificación
664
Casilla de664
verificación

9 Other: The especifications are in the photo report, You can see this to more information.
38 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

10 Cable Inlets and Routes

10.1 Are there any existing cable inlets, which can be used? Yes Node verificación
Casilla N/A
Casilla de verificación
✘664
Casilla de664
verificación
If yes, note following:
Dimensions: Inlet height:
Available cable glands:

10.2 Do new cable inlets need to be installed? Yes Node verificación


Casilla N/A
Casilla de verificación
✘664
Casilla de664
verificación
If yes, note following:
Dimensions: Inlet height:

10.3 Draw the cable inlets on the Floor Plan Sketch. At extension and if existing Floor Plan
Drawing/Cable Way Drawing is used as basis, check and verify the information on the drawing.
Note all necessary installation measurements including installation height above floor level.
The especifications are in the photo report, You can see this to more information.
10.4 Are there any existing cable routes, which can be used? Yes ✘ Casilla
Node verificación
N/A
Casilla de verificación
664
Casilla de664
verificación
If yes, note following:
Type: Ladder Height: 0,40 mts
Dimensions: 0,40 x 3 mts Available space: Enough

10.5 Do new cable routes need to be installed? Yes Node✘ verificación


Casilla N/A
Casilla de verificación
664
Casilla de664
verificación
If yes, note following:
Type: Ladder Height:
Dimensions:

10.6 Draw the cable routes on the Floor Plan Sketch. At extension and if existing Floor Plan
Drawing/Cable Way Drawing is used as a basis, check and verify the information on the drawing.
Note all necessary installation measurements including installation height above floor level.

The especifications are in the photo report, You can see this to more information.

10.7 Other:
39 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

11 Site dependent material data (to be supplied by Ericsson)

11.1 Site cables lengths

Investigate the needed lengths of relevant site cables.

Type of site cables (power, traffic, external alarms, grounding, etc.) Required length (m)
Power DC ###
Grounding Cable ###
UTP cable 5

11.2 External cabling mechanics

Investigate data for relevant external cabling mechanics.

Type of external cabling mechanics Type of support Required total length


(cable ladder, cable chute, cable tray, etc.) (ceiling/wall/floor) (m)
If something is requiered like a cable ladder

11.3 Other:
40 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

Sketch (Floor Plan)


41 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

Sketch (Equipment Allocation)


42 (42)

SITE INVESTIGATION REPORT


Preparado por (también responsable si otro) - Prepared (also subject responsible if other) No. - Nr

EPR/O/C/R/AB Gilberto Esparza


Responsable / Aprobado - Doc respons/Approved Revisado - Checked Fecha - Date Rev Tipo Instalación - Site Type

EPR/O/C/P/A Zoran Milcic Comcel/ Alok Mishra 20-Jun-11 A

Picture Overview List

Picture No Notes Picture No Notes

You might also like