You are on page 1of 9

Ronald Ardales Reales

2
SORO-SORO ILAYA BATANGAS CITY,
PHILIPPINES
Contact No: 09569100045/09269205370/
nald.reales@yahoo.com
Position applied: QA/QC WELDING INSPECTOR/WELDING
TRAINER

OBJECTIVES
An entry that fit my application with opportunities to career growth.

EDUCATION
College
Course : BIT- ShipBuilding and Offshore Engineering
Technology
School : Batangas State University
Year : 2001-2004

Secondary
School : Batangas National High School
Year : 1997-2001

Primary
School : Sorosoro Ilaya Elementary School
Year : 1991-1997

SKILLS
QUALIFICATION AND
CERTIFICATIONS:
Philippine Welding Society(PWS) Certified Welding Inspector
Cert. No: 2014-I00256 ( CWI)

Passed-CWI Average 86.56%

Philippine Welding Society(PWS) SEMINAR – Certified Welding


Inspector
Ronald Ardales Reales

Philippine Welding Society(PWS)–Member. No. I-08-1298


AG&P Company of manila Inc. Welding Technology Testing Center,
GTAW/SMAW6”Ǿ, Sch. 120. Carbon steel/ 6G SMAW 6”Ǿ, Sch.
120. Carbon steel

ALHOTY STANGER CO. LTD. – GTAW/SMAW 6G 6”Ǿ,


10.97mm thickness FCAW 1G/3G 25mm thickness, SMAW 3G
16mm thickness carbon steel.

TESDA – Trainer’s Methodology 1

Philippine Welding Society(PWS) SEMINAR – Safety in


welding/Safety in the use of welding gases

TESDA National Certificate – SMAW NC II & GMAW NC II

EXPERIENCE

Position : QA/QC Inspector


Company : JGC Philippines Inc.
Industry : Engineering and maintenance
Project : Major and minor Shutdown / Running plant EMSA-
Coral Bay Nickel Corp. Hydrometallurgical processing plant.
Address : Rio Tuba, Bataraza, Palawan, Philippines
Date : June 9, 2020 to December 18, 2020

Position : QA/QC Inspector


Company : JGC Philippines Inc.
Industry : Engineering and maintenance
Project : THPAL Minor shutdown Taganito, High Pressure
Acid leach plants
Address : Taganito, Claver , Surigao del norte, Phils.
Date : March 7, 2020 to April 18, 2020

Position : QA/QC Inspector


Company : JGC Philippines Inc.
Industry : Engineering and maintenance
Project : Major and minor Shutdown EMSA-Coral Bay Nickel
Corp. Hydrometallurgical processing plant.
Address : Rio Tuba, Bataraza, Palawan, Philippines
Date : Oct 28, 2019 to Dec 7, 2019,

Position : QA/QC Inspector

Page 2
Ronald Ardales Reales

Company : JGC Philippines Inc.


Industry : Engineering and maintenance
Project : THPAL Major shutdown Taganito, High Pressure
Acid leach plants
Address : Taganito, Claver , Surigao del norte, Phils.
Date : Sept 3 2019 to Oct 5, 2019,

Duties and Responsibilities:

 Perform quality control through checking testing, Inspection and


witnessing of all the maintenance activities to ensure conformance
to the existing specifications and drawings as approved by client .
 Conduct rotating and static inspection.
 Doing mechanical inspection on tanks, Thickeners and Vessels.
 Witnessing coupling alignment.
 Rubber lining inspection of tanks and spool through spark testing.
Peel test and Visual inspection.
 Ensure that all drawings to be used in fabrication and erection are
current revision.
 Record all necessary inspection data.
 Ensure that all NDE (non-destructive examination) requirements
are carried-out prior releasing for hydro testing and painting.
 Perform non-destructive test such as DPT
 Perform all non-destructive tests of welding works at site
including shop fabrication.
 Witnessed torqueing and conduct BTC on equipment’s manhole
covers and drain nozzle covers and all flanges.
 Ensure that all welds were accepted thru acceptance criteria
ASME B31.3 and AWS D1.1
 Final inspection of autoclave, tanks, vessels prior to box-up and de
blinding points.
 Conduct gasket and rubber lining inspection.
 Assigned to H2S plants, MS and Scrubbers area and line 1 and
line 2 HPAL area.
 Review and sign all necessary records and reports.

Position : Welding Instructor


Company : CJI/ Hinch Technology for business inc.
Industry : Construction and General services/Training.
Project : Chevron/ Papua new guinea government
Address : Sarmiento Rd. Brgy. Danglayan, San Pascual
Batangas
Date : February 5, 2018 to July 31, 2019

Duties and Responsibilities:

Page 3
Ronald Ardales Reales

 Conducts training for welder and trainees in Shielded Metal Arc


Welding (SMAW), Gas Metal Arc Welding (GTAW) processes,
both structural and piping manpower requirement of a specified
project.
 Plan, prepare and deliver instructional activities that facilitate
active learning experiences
 Develop schemes of work and session plans
 Establish and communicate clear objectives for all learning
activities
 Prepare classroom for class activities
 Provide a variety of learning materials and resources for use in
educational activities
 Identify and select different instructional resources and methods to
meet students' varying needs
 Instruct and monitor students in the use of learning materials and
equipment
 Use relevant technology to support instruction
 Observe and evaluate student's performance and development
 Provide appropriate feedback on work
 Encourage and monitor the progress of individual students
 Maintain accurate and complete records of students' progress and
development

 Program includes both theoretical and practical examination per


welding process.
 Performs dimensional and visual check of test specimens and
judge them according to applicable codes and standards or project
specification.

Position : QC Welding Inspector


Company : Brunel Technical Services Manpower corp.
Industry : Construction of processing plant
Project : Sunpower Philippines Manufacturing Limited.
Address : Laguna Techno, Park Phil.
Date : Jan 19, 2016 to Nov 15, 2016

Duties and Responsibilities:

Page 4
Ronald Ardales Reales

 Review contract specification / technical requirements, drawings


etc.
 Review Inspection & test plans in accordance with International
codes and Client Specification.
 Review Project Weld drawing, weld and NDT map and welding
Procedure Specification.
 Review and witness WPS, PQR, Welders & Welding Operator
Qualification.
 Review and control the fabrication activities as per the ITP /
Contract Specification / codes and Approved Drawing.
 Executing inspection and control of RAW materials, welding
consumables.
 Execute Welding ,NDE Inspection Radiographic film interpretation
 Overall quality control project responsibility such as interaction
and
Coordination with clients, design planning, projects production,
welding.
& NDT in Process inspection verification stage from material
Identification.
 Perform Surveillance during inspection to verify compliance with
specified yard procedure including preheat, inter pass
temperature control and post heat requirements.
 Witnessing of dimension check for completed weld as per
drawing and
Specification
 Review of NDT reports and Witness of NDT Inspections
 Witnessing of piping chemical flushing where ever required (Ex).
Portable water Tanks.
 Witnessing Hydro testing of Piping system and Tanks and
pressure.
 Operators are working in accordance to approved welding
procedure.

Position : Welding Training Supervisor


Company : AG&P Company of manila Inc.
Industry : Steel Fabrication
Project : Ichthys LNG
Address : San Roque Bauan, Batangas Phil.

Page 5
Ronald Ardales Reales

Date : Aug1,2014– Feb 15, 2016

Duties and Responsibilities:

 Directly responsible for ensuring qualified welders and welding


operators are working in accordance to approved welding
procedure data sheets on the training school.

 Provides work direction for my welding trainers and ensure that a


high quality product is being produced.

 Responsible for the set ups and operations of various welding


equipment. 

 Organizes and schedules work, assigns job duties and monitor


progress to ensure that assigned operations are performed in a
smooth and efficient manner.

 Develops, recommends and implements new procedures and


methods to improve welding operations and efficiencies.

 Supervises and manages support personnel as it relates to all


projects or related work, establishes performance requirements,
clarifies responsibilities of those supervised, conducts
performance appraisals and plans for individual employee
improvement.

 Keeps co- workers informed of important developments,


potential problems and related information necessary for
effective management

 Performs other duties as apparent or assigned.  

Position : Sr. Welding Trainer


Company : AG&P Company of manila Inc.
Industry : Steel Fabrication
Project : In-House
Address : San Roque Bauan, Batangas Phil.
Date : May 16, 2012 – July 31, 2014

Page 6
Ronald Ardales Reales

Duties and Responsibilities:

 Conducts training for welder and trainees in Shielded Metal Arc


Welding (SMAW), Gas Metal Arc Welding (GTAW) and Flux
Cored Arc Welding (FCAW) processes, both structural and piping
manpower requirement of a specified project.
 Enforce a competitive and reliable program for welder trainees for
various welding processes under strict compliance and applicable
design code/standard and project specification in preparation for
the actual welder qualification test (WQT). Training program
includes both theoretical and practical examination per welding
process.
 Performs dimensional and visual check of test specimens and
judge them according to applicable codes and standards or project
specification.
 Supports human resources department in conducting the welder
applicant’s final interview.
 Conducts for welder and trainee applicants in orientation. The
house rules, welding rules, and safety rules.

Position : Welder
Company : BEMCO STEEL INDUSTRIES CO.
Industry : Steel Fabrication
Address : JEDDAH KSA
Project : PP9/PP10
Qualification : 6G GTAW/SMAW, 1G/3G FCAW, 3G SMAW
Date : Oct. 24, 2008 – Nov. 30, 2011

Duties and Responsibilities:

 Ensures the quality of welds we performed.


 Ensures U.T.R.T is 100% passed and no coming repair.
 We always follow the instruction of our foreman so that we ensure
the quality of our weld.
 Before welding I clean the metal to make sure that there is no oil,
dirt or water and chipper to clean, then after cleaning we can start
welding.
 Full weld of frames, brackets, gusset plate, connector plate, beams
for pipe rack structure,
 Understand various weld symbols on blue prints and understand
size of fillet weld,
 Follow the work place safety.
 Practice housekeeping in work area.

Page 7
Ronald Ardales Reales

Position : Welding Trainer/Welding Inspector


Company : AG&P Company of Manila Inc.
Industry : Steel Fabrication
Project : Goro Nickel/ Foster Wheeler
Address : San Roque Bauan, Batangas Phil.
Date : Jun 25, 2007 – October 15, 2008

Duties and Responsibilities:

 Conducts training for welder and trainees in Shielded Metal Arc


Welding (SMAW), Gas Metal Arc Welding (GTAW) and Flux
Cored Arc Welding (FCAW) processes, both structural and piping
manpower requirement of a specified project.
 Enforce a competitive and reliable program for welder trainees for
various welding processes under strict compliance and applicable
design code/standard and project specification in preparation for
the actual welder qualification test (WQT). Training program
includes both theoretical and practical examination per welding
process.
 Performs dimensional and visual check of test specimens and
judge them according to applicable codes and standards or project
specification.
 Handle and assist Procedure Qualification Tests (PQT), welders
and Welding Operators Qualification and Testing Center.

ON THE JOB TRAINING

Company : JFM Marine


Industry : Sub Contractor in Shipping
Address : Manghinao, Bauan Batangas Phil.
Date : June 2002 – Nov. 2002

Company : Filipino Contractor Fabrication Inc.


Industry : Inspection and Testing
Address : Bolbok, Batangas Phil.
Date : Dec. 2002 – April 2003

Company : KEPPEL Batangas Shipyard Inc.


Industry : Ship Repair
Address : San Miguel Bauan, Batangas Phil.
Date : June 2003 – March 2004

PERSONAL DATA
Date of Birth : March 24, 1984

Page 8
Ronald Ardales Reales

Height : 5’10”
Weight : 90 kg
Civil Status : Married
Sex : Male
Language : English/Tagalog
Citizenship : Filipino

Character References:
Mr. Tress Sision III
CJI/hinch tech.
Scaffolding Insructor
09286642527

Mr. Solomon Abad


CJI/hinch tech.
Piping Instructor
09498224957

Mr. Adrian Del Mundo


AG&P Batangas
Welding inspector
09288605689

I hereby certify that the above information is true and correct to


the best of my knowledge and belief.

Ronald A, Reales
Signature Applicant

Page 9

You might also like