Professional Documents
Culture Documents
16/02/2021
SURAT 392007
EXPERIMENT 4
ROLL NO – U18EE074
SOFTWARE – MATLAB
Aim: To observe variable of rotor angle and to find critical clearing time when
fault occurs at:
1. Sending end of the line
2. Mid-point of the line
3. When the fault at mid-point is cleared by removing the faulty line
of SMIB system
Apparatus: MATLAB
d2δ
Q- To model the swing equation M
d t2
= Pm - P e
A 60-Hz synchronous generator having inertia constant H = 5 MJ/MVA and a
direct axis transient reactance of X’d = 0.3 P.U is connected to an infinite bus
through a purely reactive circuit the reactance are marked on common base
system. The generator is delivering real power Pe = 0.8 P.U Q = 0.074 P.U to
infinite bus of V=1 P.U.
a ) A temporary three phase fault occur at sending end of line at point F
U18EE074 Date –
16/02/2021
when the fault is cleared, both lines are intact. Determine critical clearing angle
and critical clearing time.
b ) a three phase fault occur at middle of one of lines, the fault is cleared and
the fault line is isolated. Determine the critical clearing angle.
Simulation of question A
For t>0.453
Simulation –
U18EE074 Date –
16/02/2021
For various values of the T critical = 0.41 then fault will be cleared
which we obtained from trial and error
For t<0.41