1. Introduction
2. Company Profile
3. Certification / Accreditation
4. Machine Details
5. Operation Sequence/Method Statement
6. Quality Control Program
7. Product Information / Data
8. Material Test Certificate
9. List of Client / Approvals
10. Project Pictures / References
11. Duct Construction Standard
12. Source of Raw Material
1-Introduction
Al Bawani is categorized "Class 1" Construction Company
by Saudi classification agency and ISO 9001: 2008
certified for Quality Management System for design,
Engineering Works and Construction Management of
Housing Complex, Industrial and Commercial Buildings,
Hospitals, Educational, Institutions, Governmental,
Diplomat Missions, Air Base and Defense Facilities.
Corporate MOTTO “We Deliver What We Promise”.
Bawani Duct Factory credo “We Deliver What We Promise” serves
to illustrate the commitment of our management and staff to
provide and deliver the highest standards in products, solutions and
services level.
To our customers, we will deliver high quality products, best-
in-class solutions, and on-time responses and services.
To our management we will take responsibility to provide
truthful and transparent information and commit full effort to
bring enhanced value to the company.
To our supporting technical partners we will provide full
support and timely information to develop win-win
propositions and achieve sustainable growth.
To our employees we will provide a conductive work
environment which encourages teamwork and enterprise,
promotes creativity, offering opportunities for career growth
with the company.
To the community, we shall maintain a high standard of
corporate social responsibility in the discharge of our
responsibilities, ensuring best workplace health and safety
practices.
Our strengths
Integrated capabilities: our goal is to build it right-
and right from the start. We believe in providing
quality duct works at a competitive rate through
vertical integration of our capabilities.
Established track record: Everyday, we explore new
ways to do things better. We strive to respond more
rapidly to customer’s needs and build more
constructive, collaborative relationships. This
relentless drive to excel has served to strengthen our
repute as an organization of quality that not just
delivers, but exceed customer expectations.
Focus on establishing VALUES: We’re focused on the
key drivers of our business performance. To this
extent, we’re sharply focused on growing and
expanding our business into region. Combined with
our trusted brand, quality product and service
offerings, our strong customer focus and
commitment to excellence will drive our ability to
deliver VALUE.
2. Company Profile
This factory is equipped with automated ducting machines
(Auto Duct Former, CNC Plasma, Nuloc, and Rollformer). At
such, the manpower requirement is usually lesser than the
traditional ducting factory
Total= 60 (120)
Qualified Manpower and Projects are supported by
Al Bawani Co. Ltd.
Technical Support & Agreements:
ﺗﺸﻬﺪ اﻟﻬﻴﺌﺔ اﻟﻌﺎﻣﺔ ﻟﻠﺰﻛﺎة واﻟﺪﺧﻞ ﺑﺄن اﳌﻜﻠﻒ :ﴍﻛﺔ اﻟﺒﻮاﻲﻧ ) اﳌﺤﺪودة (
ﻣﺴﺠﻞ ﰲ ﴐﻳﺒﺔ اﻟﻘﻴﻤﺔ اﳌﻀﺎﻓﺔ ﺑﺘﺎرﻳﺦ ١٤٣٨/١٢/٠١ :ﻫـ ،وﺗﺤﻤﻞ اﻟﺮﻗﻢ اﻟﴬﻳﺒﻲ ٣٠٠٠٥٦٤٣٢٢٠٠٠٠٣ :
ﺷﻬﺎﺩﺓ
ﻛﺘﺎﺑﺔ ﺭﻗﻤﺎ
ﺗﺴﻌﻤﺎﺋﺔ ﻭ ﺳﺘﺔ ﻭ ﺧﻤﺴﻮﻥ ﻣﺸﺘﺮﻛﺎ ٩٥٦ ﻋﺪﺩ ﺍﻟﻤﺸﺘﺮﻛﻴﻦ ﺍﻟﺴﻌﻮﺩﻳﻴﻦ
ﺧﻤﺴﺔ ﺍﻻﻑ ﻭ ﺛﻤﺎﻧﻤﺎﺋﺔ ﻭ ﺛﻼﺛﺔ ﻭ ﻋﺸﺮﻭﻥ ﻣﺸﺘﺮﻛﺎ ٥٨٢٣ ﻋﺪﺩ ﺍﻟﻤﺸﺘﺮﻛﻴﻦ ﻏﻴﺮ ﺍﻟﺴﻌﻮﺩﻳﻴﻦ
ﺳﺘﺔ ﺍﻻﻑ ﻭ ﺳﺒﻌﻤﺎﺋﺔ ﻭ ﺗﺴﻌﺔ ﻭ ﺳﺒﻌﻮﻥ ﻣﺸﺘﺮﻛﺎ ٦٧٧٩ ﺍﻟﻤﺠﻤﻮﻉ
ﺗﺸﻬﺪ ﺍﻟﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻹﺟﺘﻤﺎﻋﻴﺔ ﺑﺄﻥ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺃﻋﻼﻩ ﻗﺪ ﺃﻭﻓﺖ ﺑﺈﻟﺘﺰﺍﻣﺎﺗﻬﺎ ﺗﺠﺎﻩ ﺍﻟﻤﺆﺳﺴﺔ
ﻭﻓﻖ ﺍﻟﺒﻴﺎﻧﺎﺕ ﺍﻟﻤﻘﺪﻣﺔ ﻣﻨﻬﺎ ﺣﺘﻰ ﺗﺎﺭﻳﺦ ﺇﺻﺪﺍﺭ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ،ﻭﺍﻟﺘﻲ ﺗﻢ ﻣﻨﺤﻬﺎ ﻟﺘﻘﺪﻳﻤﻬﺎ ﻷﻳﺔ ﺟﻬﺔ ﺗﻄﻠﺒﻬﺎ ،ﻭﻫﻲ
ﺻﺎﻟﺤﺔ ﻟﺠﻤﻴﻊ ﺍﻷﻏﺮﺍﺽ ﺍﻟﺘﻲ ﻧﺺ ﻋﻠﻴﻬﺎ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻹﺟﺘﻤﺎﻋﻴﺔ ﻓﻲ ﺍﻟﻤﺎﺩﺓ ) (٦/١٩ﻣﻨﻪ.
ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﺳﺎﺭﻳﺔ ﺍﻟﻤﻔﻌﻮﻝ ﺣﺘﻰ ١٤٤٢/١١/١٧ﻫـ.
ﻋﻦ ﻃﺮﻳﻖ ﺍﺳﺘﺨﺪﺍﻡ ﺃﻭ ﻳﻠﺰﻡ ﺍﻟﺘﺤﻘﻖ ﻣﻦ ﺻﺤﺔ ﻭﺻﻼﺣﻴﺔ ﺍﻟﺸﻬﺎﺩﺓ ﻋﺒﺮ ﺯﻳﺎﺭﺓ ﺍﻟﺮﺍﺑﻂ
ﺍﻟﺮﻣﺰ ﺍﻟﻤﻌﺮﻑ ﺍﻟﺘﺎﻟﻲ : ﺃﺩﻧﺎﻩ ﻓﻲ ﺍﻟﻤﻮﻗﻊ ﺍﻹﻟﻜﺘﺮﻭﻧﻲ ﻟﻠﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻹﺟﺘﻤﺎﻋﻴﺔ
www.gosi.gov.sa/vc
ﺗﻌﺪ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﻣﻦ ﺍﻟﻮﺛﺎﺋﻖ ﺍﻻﻟﻜﺘﺮﻭﻧﻴﺔ ﺍﻟﺤﻜﻮﻣﻴﺔ ﺍﻟﺮﺳﻤﻴﺔ ،ﻭﻳﺤﻈﺮ ﻗﻄﻌﻴﺎ ﺗﻘﻠﻴﺪﻫﺎ ﺃﻭ ﺇﺩﺧﺎﻝ ﺃﻱ ﺗﻌﺪﻳﻼﺕ ﻋﻠﻴﻬﺎ ﺳﻮﺍﺀ ﺑﺎﻹﺿﺎﻓﺔ ﺃﻭ ﺍﻟﺤﺬﻑ
ﺃﻭ ﺍﻟﺘﻐﻴﻴﺮ ﻓﻲ ﺑﻴﺎﻧﺎﺗﻬﺎ ﺃﻭ ﻏﻴﺮ ﺫﻟﻚ ﻣﻦ ﺍﻧﻮﺍﻉ ﺍﻟﺘﻌﺪﻳﻞ ،ﻭﺗﻌﺪ ﺍﻟﺸﻬﺎﺩﺓ ﻻﻏﻴﺔ ﺇﺫﺍ ﺷﺎﺑﻬﺎ ﺷﻲﺀ ﻣﻦ ﺫﻟﻚ ،ﻛﻤﺎ ﺗﻌﺮﺽ ﺻﺎﺣﺒﻬﺎ ﻟﻠﻤﻼﺣﻘﺔ ﺍﻟﻨﻈﺎﻣﻴﺔ
ﺃﻣﺎﻡ ﺍﻟﺠﻬﺎﺕ ﺍﻟﻤﺨﺘﺼﺔ ﺑﺎﻹﺿﺎﻓﺔ ﺇﻟﻰ ﻣﺎﻳﻔﺮﺿﻪ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ﻣﻦ ﻋﻘﻮﺑﺎﺕ ،ﻭﻻﻳﺠﻮﺯ ﺗﺪﺍﻭﻝ ﺍﻟﺸﻬﺎﺩﺓ ﺇﻻ ﻓﻲ ﺍﻷﻏﺮﺍﺽ ﺍﻟﺘﻲ
ﺃﺻﺪﺭﺕ ﻷﺟﻠﻬﺎ ﻭﻓﻘﺎ ﻷﺣﻜﺎﻡ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ،ﻭﺍﻟﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ﻏﻴﺮ ﻣﺴﺆﻭﻟﻪ ﻋﻦ ﺃﻱ ﺁﺛﺎﺭ ﺃﺧﺮﻯ ﻣﺘﺮﺗﺒﺔ
ﻗﺒﻞ ﺍﻟﻐﻴﺮ ﻋﻦ ﺍﻟﺸﻬﺎﺩﺓ ﻭﻏﻴﺮ ﻣﺴﺆﻭﻟﺔ ﻋﻦ ﺃﻱ ﻋﻤﻠﻴﺔ ﺗﺰﻭﻳﺮ ﺃﻭ ﺗﻌﺪﻳﻞ ﺗﺘﻢ ﻋﻠﻰ ﺍﻟﺒﻴﺎﻧﺎﺕ ﺍﻟﻮﺍﺭﺩﺓ ﻓﻴﻬﺎ .
1110845402
ﺷﻬﺎﺩﺓ
CERTIFICATE
ﺗﺸﻬﺪ ﺍﻟﻬﻴﺌﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺰﻛﺎﺓ ﻭﺍﻟﺪﺧﻞ ﺑﺄﻥ ﺍﻟﻤﻜﻠﻒ /ﺷﺮﻛﺔ ﺍﻟﺒﻮﺍﻧﻲ ) ﺍﻟﻤﺤﺪﻭﺩﺓ (
ﻭﻗﺪ ﻣﻨﺢ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﻩ ﻟﺘﻤﻜﻴﻨﻪ ﻣﻦ ﺇﻧﻬﺎﺀ ﺟﻤﻴﻊ ﻣﻌﺎﻣﻼﺗﻪ ﺑﻤﺎ ﻓﻲ ﺫﻟﻚ ﺻﺮﻑ ﻣﺴﺘﺤﻘﺎﺗﻪ
ﺍﻟﻨﻬﺎﺋﻴﺔ ﻋﻦ ﺍﻟﻌﻘﻮﺩ.
1- Germany
4- Italy
5- Durma Turkey
Client : General
Consultant : General
Contractor : Al Bawani
Site : General
1 X
2 X
3 X
4 X
5 X
6 X
7 X
8 X
9 X
10 X
11 X
12 X
13 X
14 X
15 X
16 X
17 X
18 X
Note: The revised parts from the last issue is indicated by Arrow and revision number
Doc. No. BDF-MS-001
Table of Contents
1.0 Purpose 4
2.0 Scope 4
1.0 PURPOSE
The purpose of this procedure is to describe the general methodology and requirements for
the Fabrication of HVAC Duct Work. This method statement serves as a guide in carrying out
the work in accordance with the project specifications, codes, industry standards and safe
working practices.
2.0 SCOPE
The work scope for the fabrication of HVAC Duct Work consist of Rectangular straight
duct and fitting like Elbow, taper (concentric, eccentric).offset ,shoe collar/Branches etc f
abrication works.
• SMACNA 3rd addition 2005 Sheet Metal and Air conditioning contractor National
• Association, NC
4.1 Production Manager shall be responsible for carried out Fabrication of HVAC Duct work
and also responsible to ensure the process compliance with the procedure and proper
documentation as per approved formats.
4.2 QC/QA Engineer shall review the Drawing/Procedure and other specifications. He
should carry out inspection during fabrication and other inspections and offer to Engineer
for witness from their side if require as per level of inspection. He shall document all the
inspection values comments in respective formats and compile the same as per
customers / contractual requirement as test pack.
4.3 Safety Supervisor shall monitor the implementation of all safety procedure and
regulations as per our HSE plan.
Doc. No. BDF-MS-001
The required number of equipment units and manpower will generally consist of the foll
owing, but may vary as the condition warrants. The listed equipment and manpower bel
ow are intended for the structure construction.
5.1 EQUIPMENT
4 35mm Flange Roll former 0.55 to 1.2mm 1 CGF-1/ CGF-2 Integrated flange 35 mm
5.2 MANPOWER
1 Production Manager 1
2 HVAC Engineer 1
3 QA/QC Engineer 1
4 QC Inspector 1
5 Safety Supervisor 1
6 Production Supervisor 1
7 Logistic Supervisor 1
8 Purchase Officer 1
9 Store Keeper 1
14 Duct Fabricator 10
15 Duct Man 5
16 Helper 8
17 Accountant 1
Doc. No. BDF-MS-001
Fig.001
Doc. No. BDF-MS-001
a. After receiving the correct approved drawings from customer, BDF design team
need to confirm CAD files is 100% match with approved stamped files.
6.2 Duct Construction Schedule Preparation and get Approval from customer
Fig.002
Doc. No. BDF-MS-001
a. After receiving the confirm fabrication standard BDF team is start Takeoff and
numbering drawing for start the HVAC Duct fabrication work.
Fig.003
Doc. No. BDF-MS-001
After preparation of Takeoff and numbering drawing, send cutting list takeoff with tag
numbering drawing to customer for final confirmation prior to start fabrication.
After receiving the final take off and numbering drawing confirmation from customer,
after that our production team need to make scheduling of fabrication in the light of site
priorities.
As per fabrication setup for all HVAC Duct Work, some pieces are called Rectangular
straight ducts and some are fittings like Taper, Elbow, Shoe collar, branches Offsets etc.
so two parts are one is Straight duct and the other is fittings as stated above, for Straight
we use Auto duct forming system and the fitting work we use CNC Plasma cutting
machine.
a. Take off/cutting list for fitting work our CNC programmer is doing programming first
as per approved take off cutting list.
Fig.004
Doc. No. BDF-MS-001
b. After Programming CNC Plasma operator load the GI sheet as per project approved
fabrication standard. Operator check program simulation on CNC machine attached
computer, after satisfaction operator start the CNC machine ON buttons.
Fig.005
Fig.006
Doc. No. BDF-MS-001
C. Pittsburg Lock:
After cut the sheets as per program sizes and shapes from plasma the next procedure
is Pittsburg locking Male/Female joints.
Fig.007
D. Auto Flanger
For round shape duct parts like elbow we need to use auto flanger machine process.
Fig.008
Doc. No. BDF-MS-001
E.CGF-1/CGF-2 FLANGE
After the sequence of process for flange we check as per approved standard
which type of flange is recommended approved, this machine is one side making CGF-1
type and the other side is CGF-2 type flange.
Fig.009
F. Folding Machine
After completion of above stated process, we use this machine for some fitting parts
folding.
Fig.010
Doc. No. BDF-MS-001
G.SEAM CLOSING
H. Corner Fixing
Final process of fabrication of HVAC Duct fitting work is corner fixing, after checking the
corner correct alignment make fix it with duct pieces strongly.
FIG.011
Fig.012
Doc. No. BDF-MS-001
Fig.014
Doc. No. BDF-MS-001
Fig.015
7.1 The following Safety Requirements and provisions are excerpts from the submitted
Proposed Safety Control Plan:
a. Lifting Appliances
All Lifting appliance shall be inspected and should be certified accordingly with ap
propriate test. The lifting appliances shall be used on plant upon certificate in plac
e, and inspection by competent person.
nduction on the job shall be given to all those workers involved with the work dir
ectly.
All hazards that any personnel could be exposed to as the result of working will be
identified. Once identified, they will be assessed in terms of their potential to cause harm.
To assess this risk, two factors will be considered.
a. The likelihood that the situation will develop or the event will occur; and
b. The severity of harm that could result
Once hazards are identified, the hierarchy of control comes into play. These control
s are not mutually exclusive but will be used to reduce the risk as far as practicabl
e.
8.0 COMMUNICATION AND COOPERATION
8.1 Prior to commencement of HVAC Duct work fabrication, a meeting will be held and
attended by all employees.
The purpose of this meeting will be to ensure that all personnel are
a. Site inducted.
b. Aware of the contents of this project method statement and risk assessment.
c. Aware of the tasks which have been allocated to them and capable of carrying
them out safely.
d. Aware of the activities and locations of their colleagues and others.
8.2 Wherever practicable, work will be rotated so as to provide all employees with ongoing
experience of all aspects of the work
8.3 The site works supervisor will attempt at all times to maintain close liaison between
HHIC and the Engineer and any other site sub-contractors. He will always endeavor not
to obstruct or delay other site activities, but only where this can be achieved without
compromising health and safety standards.
Attached Documents
1. Annex-1 Quality Plan
2. Annex-2 Checklists
3. Annex-3 HSE Plan
1
AL BAWANI DUCT FACTORY
PRODUCT CATALOG
CONTENTS : Page
Size : W x H x L
W - width of duct
H - height of duct
L - length of duct
Single Wall straight ducts are made with GI sheet metal (in accordance
with ASTM 653 , G90 coating) but can also be made various metals :
Double Wall ducts are made for two different type of application:
1. Acoustical double wall duct for noise control
2. Thermal double wall duct for temperature control
1. S & C Joints
Size : W x H x R
W - Width of elbow
H - Height of elbow
R - Inner radius of elbow
Size : W x H x S1 x S2 x Ø°
4. OFFSETS
Size : W x H x L x X
W - Width
H - Height
L - Length
X - Offset
Size : W x H x D x L
W - Width
H - Height
D - Diameter
L - Length
Size : W x H x L
W - Width
H - Height
L - Length ( 150mm standard )
This fitting is provided to take out branched from main duct line.
Its seam will be pittsburgh joint and one connector will be same as
duct connector but other connector will be reversed flange. The
taper part is kept at 45 degree angle as per standard.
Size : W1 x H1 / W x H / W2 x H2 - R
W - Width of duct at inlet
H - Height of duct at inlet
W1 - Width at right side
H1 - Height at right side
W2 - Width at left side
H2 - Height at left side
R - Inner radius
This fitting is used when the duct routing turns both sides.Its
seam will be pittsburgh joint and connector will be same duct.
Splitter is provided (as shown in above picture) to control air flow
on either side.
Size : W x H x L
W - Width
H - Height
L - Length (50mm standard)
13
AL BAWANI DUCT FACTORY
PRODUCT CATALOG
Size : W x H x G x L x D
W - Width of plenum box (depend on collar dia)
H - Height of plenum box (depend on grill neck width)
L - Length of plenum box
G - Neck width of grill
D - Diameter of spigot / collar for flexible duct connection
LINEAR PLENUM BOX WITH INNER LINER FIBERGLASS BLACK FABRIC FACED AND PERFORATED SHEET
This type of plenum box is required as per the site requirement.It’s body is made of G-90 GI sheet metal of Gauge-24 (0.7mm
thickness) with black faced fiberglass liner applied in inner surface. Glue and sticker pin are used to fix this liner inside the
plenum box. After that perforated sheet of Gauge-22 (0.9mm thickness) having 2.4mm dia hole and 23% open area is fixed using
self tapping screw.
Screw type VCD is used where its operation access is limited. It can be operated from the neck of grill using screw driver and
there is no need to access it through ceiling. There is 6mm bolt of 120mm length and fly nut connected with lever to blade.
Movement of fly nut causes the blade to open and close when the bolt is rotated.
Size : W x H x G x D
W - outer width of diffuser box ( square size )
H - Height of diffuser box ( depends on neck diameter )
G - Diffuser neck size (square size)
D - Diameter of spigot / collar for flexible duct connection
Size : W x H
W - Width of VCD
H - Height of VCD
This type of VCD is made with single blade or multi blade depending on
the size. It is of two types :
1. Parallel blade
2. Opposed blade
The frame and the blade of VCD is made using G-90 GI sheet metal
of 18-Gauge.
Transverse connection joint (Connectors) for this VCD can be
either CGF-2, CGF-1 or S-C joint as per the same size duct construction
standard , or as required on the site.
The blade is constructed by crimping V-shape in center and on
edges so that it will be strong enough to sustain air flow pressure and
easily operable. Single blade are operated by shaft , directly connected
to manual quadrant. Multi blades are connected to each other and to
quadrant by linkage and shaft.
At the end of each shaft , bush is provided to avoid leakages and
its proper movement. The shaft on the blade is held by strap with bolt
and also welded to the blade.
The manual quadrant handle is mounted on bracket attached to
either left or right side of VCD. The quadrant is provided with indication
for OPEN and SHUT.
16
AL BAWANI DUCT FACTORY
PRODUCT CATALOG
VOLUME CONTROL DAMPER (VCD-CHANNEL FRAME)
RECTANGULAR ( MULTI-BLADE )
Size : W x H
W - Width of VCD
H - Height of VCD
This type of VCD is made with single blade or multi blade depending on
the size. It is of two types :
3. Parallel blade
4. Opposed blade
Type-1
Size : D x L
D - diameter
L - length
The frame and its blade is made using G-90 GI sheet metal as
follows :
Diameter Frame Blade
D 150 , 200 22G 18G
250 , 300 20G 18G
350 , 400 18G 18G
Blades are crimped with V-shape in center and is held with axle
Type - 1
welded to it.
End connections are made to use round coupling for connecting
other fittings.
The quadrant is mounted on bracket with indication for OPEN and
SHUT.
Type-2
Size : D x L
D - diameter
L - length (400mm standard)
Frame Size W x H x L , W= H = (D + 100mm) and L = 250mm (standard)
W - width of louver
H - height of louver
Sand trap louver is used to separate sands from fresh air intake ,
made of GI sheet metal 18 gauge thickness.
U-strip - 100mmx25mm
Frame depth - 75mm
Gap between U-strip - 50mm
Collar depth - 50mm
Holes at bottom - 20mm dia
Size : W x H x L x A x B
W - Width of sound attenuator duct
H - Height of sound attenuator duct
L - Length of sound attenuator duct
A - Width of aerodynamic splitter
B - Distance between splitter
All round spiral duct and fittings shall be manufactured from G-90
galvanized steel , conforming to ASTM and SMACNA standards.
Standard elbows will have 1.5 center line radius. Other radii and
vaned elbows are available as needed. Elbows through 4”shall be ,
with stitch welded joints. Elbows 6”through 50”shall be gore
locked construction. All elbows above 51” shall also be gored , but
with tack weld and sealed construction for use to 4”w.g. , or solid
welded for use to 10”w.g. Branch connections in medium pressure
systems shall be conical for 90 degree taps , and straight for 45deg
Available sizes :
Ø100mm dia , Ø150mm dia , Ø200mm dia , Ø250mm dia ,
Ø300mm dia , Ø355mm dia , Ø400mm dia , Ø450mm dia ,
Ø500mm dia , Ø560mm dia , Ø600mm dia , Ø650mm dia ,
SPIRAL DUCT Ø710mm dia , Ø750mm dia , Ø800mm dia etc
20
AL BAWANI DUCT FACTORY
PRODUCT CATALOG
21
AL BAWANI DUCT FACTORY
PRODUCT CATALOG
SHEET METAL GAUGE TOLERANCE FOR ROUND DUCT
22
AL BAWANI DUCT FACTORY
PRODUCT CATALOG
23
AL BAWANI DUCT FACTORY
PRODUCT CATALOG
24
AL BAWANI DUCT FACTORY
PRODUCT CATALOG
25
AL BAWANI DUCT FACTORY
PRODUCT CATALOG
26
AL BAWANI DUCT FACTORY
PRODUCT CATALOG
27
AL BAWANI DUCT FACTORY
PRODUCT CATALOG
28
AL BAWANI DUCT FACTORY
PRODUCT CATALOG
29
AL BAWANI DUCT FACTORY
PRODUCT CATALOG
KACC / LD Project
1
(King Faisal Hospital Riyadh)
EMS Building
4
(King Faisal Hospital Riyadh)
FPMD
CSSD Building
5
(King Faisal Hospital Riyadh)
FPMD
Single Female Housing
6
(King Faisal Hospital Riyadh)
Page 1 of 4
Al BAwAni Duct FActory ApproveD project list
20
21
23
24
25
Page 2 of 4
Al BAwAni Duct FActory ApproveD project list
33
34
KKIA- Alfursan Lounges
Saudi Airlines Catering - Jeddah
FPMD
Royal Wing Building Ext.
35
(King Faisal Hospital Riyadh)
Page 3 of 4
Al BAwAni Duct FActory ApproveD project list
Page 4 of 4
10 - Project Pictures /
References.
Private Aviation Terminal Riyadh
11-Duct Construction
Standard
(Just only Specimen we have to follow the Project Requirements)
12 –Source of Raw
Materials
1- AGIS (UAE)
2- KIMMCO
3- FOSTER
4- NTEICO
Al Bawani Duct Factory
Address: P.O. Box 65697 Riyadh 11566
Tel: +966 920033155
Mobile : +966 59 303 4367
Mobile : +966 59 303 4195
Email: chkhalid@albawani.net / bdf@albawani.net
Website: http://www.albawani.net.