Professional Documents
Culture Documents
Green. Intelligent. Global: Presentation To The Philippine Investment Conference Tokyo, Japan
Green. Intelligent. Global: Presentation To The Philippine Investment Conference Tokyo, Japan
GLOBAL
Presentation to the
PHILIPPINE INVESTMENT CONFERENCE
Tokyo, Japan
June 2015
THE PHILIPPINES:
LEGEND:
4-HR FLIGHT ROUTE
6-HR FLIGHT ROUTE
4-HR FLIGHT RADIUS
STRATEGICALLY LOCATED AT THE CROSSROADS 6-HR FLIGHT RADIUS
OF INTERNATIONAL SHIPPING AND AIRLINES. Vietnam
Timor Leste
Thailand
Taiwan
Sri Lanka
South Korea
Solomon Islands
Singapore
Saipan
Papua New Guinea
Palau
Pakistan
North Korea
Nepal
Nauru
Myanmar
Mongolia
Micronesia
Maldives
Malaysia
Laos
Japan
Indonesia
India
Hongkong
Guam
Australia
China
Cambodia
Brunei
Bhutan
Bangladesh
Raise funds
through the sale of Metro Manila Camps to
finance the conversion of former US military
bases.
6
BCDA Diversified Portfolio
1 Tollway
2 Seaports
Public-Private
Partnerships 3 Airports
Preferential tax
rates
Fiscal & Non-Fiscal Zero VAT
Incentives
Exemptions on Real
Property Tax
Public-Private Partnerships Bonifacio Global City
MAP
McKinley Hill, Newport City and
Public-Private Partnerships McKinley West
Clark’s Thriving Business Center
Special Economic
and Freeport Zone
QUICK STATS
(31,400 hectares) (2014)
Special Economic Zone
(27,000 hectares)
1M TOURISTS
Airport Area
740 LOCATORS
(2,300 has)
Japanese Contractors:
- Kajima-Obayashi-JFE Engineering-Mitsubishi Heavy Industries Inc.
- Hazama-Taisei-Nippon Steel Joint Venture
CLARK GREEN CITY – City in a Farm
16
Clark Green City The Agricultural Heartland
Clark Green City The New Ph Metropolis
Baguio City
20
Clark Green City Active Fault Lines (Clark Green City and Metro Manila)
Materials
Clark Green City Residential & Employment Projections
Population Projection, Clark Green City, Based on Different Capture Rate, 2020F to 2050F
1,679,800
population
233K
existing/resettled
929,600
Capture 5%
Rate 10%
Scenarios 15% 419,950
20% 288,400 319,250
232,400
72,100
Employment Projection, Clark Green City, Based on Different Capture Rate, 2020F to 2050F
1,288,400
more than
Recommended
@1 mil
801,200
800,000 jobs
Capture 5%
Rate 10%
Scenarios 15% 427,000
20% 322,100
# Workers
200,300
139,400 106,750
34,850
3. Central Park
4. Expo 20
5. Retail/Interchange 19
6. Sports Hub 18 21
8
7. Institutional Block 16 15
10
54
FUTURE
403 CONNECTION
TO SCTEX
266
91
315
San Nicolas Road
501
318
314
CALRK-BAMBAN-CAPAS RD
Landfill
Water Feature
Road ROW
Transport Hub
Sports & Recreation
Open Space
Industrial
Light Industrial
Institutional
Residential
RD RD
CALRK-BAMBAN-CAPAS
Industrial Park
CALRK-BAMBAN-CAPAS
Manufacturing Sector
Agricultural Sector
Food Terminal Farm
Clark Green City Conceptual Master Plan
COMMERCIAL
• lively urban core
FINANCIAL DISTRICT
• scenic urban landscape with iconic structures
• large central park at the center
COMMERCIAL CENTER
• mixed-use components
Kalangitan Road
• to create a distinct skyline and identity for
CGC FUTURE
CONNECTION
TO SCTEX
RD RD
CALRK-BAMBAN-CAPAS
CALRK-BAMBAN-CAPAS
Mixed Use Zone
Commercial Core
Commercial Areas
Expo
Clark Green City Conceptual Master Plan
RESIDENTIAL CONDOMINIUMS
MIXED-INCOME
HOUSING
Affordable Housing
RD RD
CALRK-BAMBAN-CAPAS
CALRK-BAMBAN-CAPAS
Residential Areas
Clark Green City Conceptual Master Plan
INSTITUTIONAL HEALTHCARE CENTER
• public realm facilities interconnected CIVIC CENTER
with open space connectors
MIT RESEARCH
CENTER
• includes educational, religious, sports,
and medical facilities as well as SPORTS CENTER
government offices Kalangitan Road
NEW UP
• new University of the Philippines (UP) CAMPUS
FUTURE
Campus focused on research and CONNECTION
TO SCTEX
internationalization
RD RD
CALRK-BAMBAN-CAPAS
CALRK-BAMBAN-CAPAS
Stadium Civic Plaza
Institutional Areas
CGC Infrastructure Projects: ACCESS ROADS
Primary Access Roads
• Joint project by BCDA & DPWH
• Total Length: 24 km
• Row: 20 m (initial) CLARK 1
• Total Cost: Php 1 Billion GREEN
CITY
FUTURE
1. MacArthur-CGC Road CONNECTION
TO SCTEX
Lanes: 2 (initial)
2
Length: 9 km
Budget: 50 M (2015)
Notice to Proceed issued to
Status: Contractor by DPWH (April
20, 2015 – Day 01)
CALRK-BAMBAN-CAPAS RD
2. Clark-Bamban-Capas Road
Lanes: 2 (initial)
CLARK
Length: 15 km
INT’L
Budget: 150 M (2015) AIRPORT
CLARK
Topographic Survey for
Status:
approval by DPWH & BCDA FREEPORT
ZONE
CGC Infrastructure Projects: ACCESS ROADS
CGC Infrastructure Projects: TRANSPORTATION
Clark Rail
Transit System
CGC
• extension of the North-
South Commuter
Approx. 88 kms
NORTH-SOUTH
COMMUTER RAIL
(NSCR) PHASE 1
METRO
MANILA
PROPOSED ALIGNMENT
CGC Infrastructure Projects: TRANSPORTATION
Clark Rail Transit System
START
Integrated
Utility Tunnel
• Special underground
TELECOM construction to house
all major utility lines
• Allows for
unobstructed views of
the city
• Significantly reduce
costs and disruptions
due to recurrent
UTILITY TUNNEL excavation works
WATER • Better access to utility
lines for maintenance
works/repair
• Provides added
protection to utility
GAS lines
CGC Infrastructure Projects: UTILITIES
City-wide public services operated by Integrated Operation Center (IOC) make
new city to be more convenient with not only efficiency but also financial benefit.
Integrated
Energy
Intelligent Building System
In-Building Communication
Operations Center
Mgmt Service Network
Smart Office and Business
Solutions
Operation Service for
Integrated Operation Center Smart Signal public benefit
Transportation Control
Service Traffic
Underground Facility Information
• Public services categorized
Facility
Mgmt Service
Identification Parking in Transportation, Safe &
Water-pipe Monitoring Information Security, Environment
Streetlight Monitoring Illegal
Parking • Pursuit social benefit
Detection for public
Environment
Service
RFID Ticketing
Operation Service for
Environment business
Info
Weather Info • Utility services for citizen
and business : Facility
CCTV Camera control mgmt, Smart Card etc..
Real-time video Crime
Analysis Prevention • Public-Private Partnership
Monitoring & Decision Service model
Making
Opportunities with BCDA Land Development
BCDA is looking for Joint Venture
Partners for:
Mixed-Use
Development
Industrial
Estates
Innovation
District
BUSINESS MODEL LEASE
TERMS
LEASE PERIOD • 50 years, renewable for another 25 years
• 25 years, renewable for another 25 years
FIXED LEASE 5% of the Fair Market Value of the Property
VARIABLE LEASE Percentage of Gross Revenues from operations
(e.g., commercial, rental)
OTHER TERMS • Advance Lease Payment – first 3 years
• Incentives Offered
• Performance Commitments
• 100% Foreign-Owned Company is Allowed
BUSINESS MODEL EQUITY JOINT VENTURE FRAMEWORK
EQUITY JOINT
VENTURE
CORPORATION (JVC)
1. Power
• Generation (renewable energy)
• Distribution
• Back-Up/Storage
• Energy Management System
2. Water
• Supply
• Wastewater Treatment
3. District Cooling System
4. Telecommunication & Information Systems
5. Solid Waste Management
6. (Natural) Gas Supply & Distribution
Opportunities with BCDA Target Locators
• Electronics Manufacturing
• Renewable Energy Systems
• Information and Communication
Technology/Business Process
Outsourcing (ICT/BPO)
• Nano-Electronics
• Light Manufacturing
• Biotechnology and Pharmaceuticals
• Agro-Industries
• Schools/Universities
• Creative Industries/Animation
• Research Centers
• Medical Facilities
• Government Offices
• Housing Developers
• Tourism Development
• Others
Clark Green City Tax and Fiscal Incentives
Food Terminal
TO SUBIC VIA
FUTURE SCTEX
CONNECTION
GK Farm University
Affordable Housing
Botanical Garden
DIRECT LINK TO
CLARK
INTERNATIONAL
CGC Access Roads
Innovation Center AIRPORT
PRIORITY DEVELOPMENT PLAN 2014-2016
CONSTRUCTION OF PRIMARY
ACCESS ROADS
REAL ESTATE DISPOSITION
(PHASE 1)
SITE DEVELOPMENT
Thank You
45
Thank You!