PLOT DETAILS

SY NO : 281/2

COMPLETED ALUMINIUM MANUFACTURING UNIT & RESIDENCE FOR Mr. NIDHISH RAJU, SY NO 281/2 , BLOCK : 10
VILLAGE : KULAKKADA N
THALUK : KOTTARAKKARA
KALAYAPURAM DISTRICT : KOLLAM
ALL DIMENSIONS ARE IN METERS

EXTENT : 1 ha,7 are,90 sq.m


COMPLETED ALUMINIUM SHEET
MANUFACTURING UNIT &
SCHEDULE OF JOINERIES
RESIDENCE FOR,
DESCRIPTION SIZE (cm)

G L D GRILLED DOOR 300X250 Mr. NIDHISH RAJU


THACHAN MUKKU D1 WOODEN FLUSH DOOR 90x210 NIDHISH NIVAS
KALAYAPURAM PO
1.45

D2 WOODEN FLUSH DOOR 80x210


KOTTARAKKARA
V VENTILATOR 60x40
1.50 KOLLAM
0.10

W3 WOODEN GLAZED WINDOW 150X150


SECTION SECTION KW3 WOODEN GLAZED WINDOW 150X100
ALUMINIUM SHEET MANUFACTURING
UNIT
NO OF WORKERS : 3
1.90

GF PLINTH AREA : 698.28 Sq.m


PATHALA JN NO OF POWER MACHINERIES USED- 20 HP
RESIDENCE
PRESSURE MOTOR
GF PLINTH AREA : 33.58 Sq.m
0.20 3.00 0.20 0.20 1.10 0.20
TABLE -1 COLOUR SCHEME
BUILT UP AREA : 731.86 Sq.m
PLAN PLAN Sl.No Description Notational
colouring PARKING AREA
1 Plot line
SEPTIC TANK SOAK PIT TOTAL AREA : 360.00 Sq.m
2 Street ( existing)
._
SCALE - 1:50 3 Street (proposed) ............... FOR SCHOOTER PARKING : 38.78 Sq.m
4 Permissible building line ...............

5 Building (existing) _ . _. _
F .S.I : 0.07
6 Building (proposed to be demolished) COVERAGE : 7.0%
7 Building (proposed)
SITE LOCATION ............... SIGNATURE OF OWNER
8 Drainage sewerage work

9 _ . _ . _. _ .
Water supply works
Man Electric line
10
Hole

Spil Over Hole GL


River sand
Flush
Unit
Filter
Unit
Broken Stone
BrokenTile CERTIFICATE
3.10

Rain Water Percolation pit


RCC Wall Certified that,

CERTIFICATE
SECTION
1. The plot boundaries
,measurements and other details
shown in the plan are correct.
1. The document in support of the
Flush Filter
ownership of plot have been verified
Unit Unit
Percolation pit 2. The drawings are conformity and that the applicant have every right
with the provisions of the of construction in the plot
Master plan/Detailed Town 2. The plot
Planning Scheme / Interim boundaries,measurementsand other
0.23 4.00 0.23
PLAN
Development Order as details shown in the plan have been
applicable under verified at site and found to be correct.
the Kerala Town Planning Act 3. The drawings are confirmity with the
PLAN 2016. provisions of the Master plan/detailed
PERUMKULAM town planning scheme / interim
CHAVANIPLAVILA JN development order as applicable under
RAIN WATER STORAGE TANK 3.The drawings are in the the Kerala Town Planning Act 2016.
conformity with the provisions 4.The drawings are conformity with the
SCALE - 1:100 of the Kerala Panchyat Buiding provisions of the Kerala
Rules ,2019and other Panchayat Buillding Rules,2019 and
applicable statuses. other applicable statuses.
LOCATION SKETCH
Place:
(Not to scale) Date:

(Signature)
Name:
Reg. No : (Signature)
Address:
(Registered Institution/ Secretary
Architect/ Engineer/ Supervisor ....................................Panchayat