SHOP DWG .k
M
Principles of Shop Dwg
Design DWG.
el
am
Drawings developed by the design office is to providing the details and
.k
information as per design.
M
Shop DWGs.
el
thru RFIs. Its actually a phase between design and construction and shop
am
drawings are integrated drawings with architectural and MEP.
.k
M
As Built DWG.
el
from the contract documents. Think of these drawings as a record of the
final constructed product.
am
.k
M
Shop DWGs steps.
Blocks:
Replace design blocks with Shop DWG blocks (Or add shop DWGs element to
el
design blocks).
am
1. Add ceiling box for fixtures blocks.
2. Add back box for every element fixed in wall (Sockets, Fixture,….).
.k
M
Wiring.
Design: Only internal wiring (Arc) and no type or diameter for
conduits and No Hatch mark.
Shop DWG:
Internal wiring between (sockets, fixtures, els..) for the same
branch circuits Noted that all wiring must be straight (Poly Line )
with fillet (R=50) in mm scale and use cutting for good
presentation.
el
am
.k
M
Draw Home run wiring from Panel board to (first and
nearest) element in branch circuit and put pull box every
15-20 meter (and every two 90 Deg) and junction Box if
needed.
Take into your consideration types of wiring as following
el
am
.k
M
Put Hatch mark and text (Showing circuit No., Panel Name,
Wiring size and type of conduits).
eng.Mahmoud kamel
Hatch Mark.
el
am
.k
M
Power Wiring.
el
am
.k
M
el
am
.k
M
el
am
.k
M
el
am
.k
M
el
am
.k
M
Types of conduits
el
EMT (Electrical Metalic Tube).
am
RGS (Rigid Galvanized Steel).
.k
M
Back Box and Ceiling Box.
In shop DWG we put back or ceiling Box and pull box every
15-20 meter and junction Box if needed.
el
am
.k
M
Socket Box - PVC
el
am
.k
M
Switch & Socket Box - Metal
el
am
.k
M
Types of ceiling box
el
am
.k
M
Clear all Calculation (V.D and S.C) for all branch circuits,
Length of Home run and internal wiring, type and diameter
el
for conduit and the method of installation.
am
.k
M
M
.k
am
el
Cable Routing.
el
Make sure that No conflict between two cables.
am
Recalculate V.D and S.C for all cables depended on the
new length in Shop DWG.
Coordinate with other teams (Arch, Mech, Comm,
.k
Structure) to avoid claches in DWG.
M
MV Cables to be Put in a seperated cable tray and above L.V.
But your level from F.F.L.
el
am
.k
M
Cable Tray Calculation.
el
am
.k
M
el
Lighting.
am
Routing.
Earthing.
Schedules.
.k
Cable Routing Sections.
M