You are on page 1of 15

Dome Internal Stiffening (160-27)

DOME INTERNAL STIFFENING:

LdwTeWL  LBTP  2 DwTpD

LdwWbWL  CsW  2 DwTk

T.R.:
1. Visual inspection of weld seams to be done as per HW0620099, Classification group
CS/CK.
2. Non Destructive Examination of welds seams as per HW 0850199, part-10.
3. All weld joints to be coated with steam washable paint.
4. Misalignment of pipe centerline not to exceed 5 mm.
5. Stiffening pipe item no 2 & 4 include 50 mm extra length for site adjustment.
6. Site erection of dome internal stiffening & L.P. Heater supports assembly should be
done simultaneously.
7. Stiffening pipes item no 12 to 20 include 20 mm extra length for site adjustment. Edge
preparation at their plain end is to be made at site as per detail-IV.
8. E denotes erection welding.

* Optional user input ** Input taken by program other than expression 1


Dome Internal Stiffening (160-27)

1. Stiffening Pipe (316027A01P01):

T.R.: Painting is to be done as per HE77001.

VspL  LdwUIb  UdwLIb  Slab

2. Stiffening Pipe (316027A01P02):

T.R.: Painting is to be done as per HE77001.

Slab
VspL1  UdwLIb  UdwUIb  VspPL   VpSm
2

* Optional user input ** Input taken by program other than expression 2


Dome Internal Stiffening (160-27)

3. Stiffening Pipe (316027A01P03):

T.R.: Painting is to be done as per HE77001.

VspL2  LdwMIB  LdwUIb  Slab

4. Stiffening Pipe (316027A01P04):

T.R.: Painting is to be done as per HE77001.


VspL3  UdwLIb  UdwUIb  Slab  VpSm

5. Stiffening Pipe (316027A01P05):

T.R.: Painting is to be done as per HE77001.

HspL1  TeSpD 1  Slab


6. Stiffening Pipe (316027A01P06):
* Optional user input ** Input taken by program other than expression 3
Dome Internal Stiffening (160-27)

T.R.: Painting is to be done as per HE77001.

VspL4  LdwLIb  LdwMIb  Slab

7. Stiffening Pipe (316027A01P07):

T.R.: Painting is to be done as per HE77001.

HspL2  TeSpD 2  Slab

8. Stiffening Pipe (316027A01P08):

T.R.: Painting is to be done as per HE77001.

CNeckL Slab
VspL 6   TeSpD1  PdTk 
2 2
9. Stiffening Pipe (316027A01P09):

* Optional user input ** Input taken by program other than expression 4


Dome Internal Stiffening (160-27)

T.R.: Painting is to be done as per HE77001.


HspL 4  2WbSpD  Slab

10. Stiffening Pipe (316027A01P10):

T.R.: Painting is to be done as per HE77001.

CNeckW Slab
VspL7   WbSpD  PdTk 
2 2

11. Round (316027A01P11):

T.R.: Painting is to be done as per HE77001

SrodL  2WbSpD  Slab

12. Stiffening Pipe (316027A01P12):

* Optional user input ** Input taken by program other than expression 5


Dome Internal Stiffening (160-27)

T.R.: Painting is to be done as per HE77001.

LdwTeWL  LBTP  DwTpD

LdwInc  LdwTeWL  Tan  IcAng  

  WbHt  2WbFW   LdwInc


LdwFHt  TgCL  LdwUEL  WbCL     
  2  2
 LdwTeWL  CNeckL 
LdwFang  tan 1  
 2.LdwFHt 

CneckL
FeMspD   LdwMIb  LdwUEL  tan LdwFang   
2

FeHspInc  HspOD Tan  LdwFang  


FeHspL  FeMspD  TeSpD1  TeSpD 2  PdTk Cos 1  Ldwfang    Slab FeHspInc
2

2
 SpSm

* Optional user input ** Input taken by program other than expression 6


Dome Internal Stiffening (160-27)

13. Stiffening Pipe (316027A01P13):

T.R.: Painting is to be done as per HE77001.


CneckL
FeLspD   LdwLIb  LdwUEL   tan LdwFang   
2


FeHspL 2  FeLspD  TeSpD1  TeSpD 2  PdTk Cos 1  Ldwfang    Slab FeHspInc
2

2
 SpSm

14. Stiffening Pipe (316027A01P14):

T.R.: Painting is to be done as per HE77001.


  WbHt  2WbFW   LdwInc
LdwRHt  TgCL  LdwUEL  WbCL     
  2  2
 LdwTeWL  CNeckL 
LdwRang  tan 1  
 2.LdwRHt 
Re HspInc  HspOD Tan  LdwRang  

CneckL
Re MspD   LdwMIb  LdwUEL   tan LdwRang   
2


Re HspL3  Re MspD  TeSpD1  TeSpD 2  PdTk Cos 1  LdwRang    Slab Re HspInc
2

2
 SpSM

* Optional user input ** Input taken by program other than expression 7


Dome Internal Stiffening (160-27)

15. Stiffening Pipe (316027A01P15):

T.R.: Painting is to be done as per HE77001.


CneckL
Re LspD   LdwLIb  LdwUEL   tan  LdwRang   
2


Re HspL 4  Re LspD  TeSpD1  TeSpD 2  PdTk Cos 1  LdwRang    Slab Re HspInc
2

2
 SpSM

16. Stiffening Pipe (316027A01P16):

T.R.: Painting is to be done as per HE77001.


 CsW  CneckW  2 DwTk 
LdwTang  tan 1  
 2.LdwRHt 

CneckW
TeUspD   LdwUIb  LdwUEL  tan LdwTang   
2

TeHspInc  HspOD Tan  LdwTang  


TeHspL1  TeUspD  WbSpD  PdTk Cos 1  LdwTang    Slab TeHspInc
2

2
 SpSM

* Optional user input ** Input taken by program other than expression 8


Dome Internal Stiffening (160-27)

17. Stiffening Pipe (316027A01P17):

T.R.: Painting is to be done as per HE77001.


CneckW
TeMspD   LdwMIb  LdwUEL   tan  LdwTang   
2

TeHspL  TeMspD  WbSpD  PdTk Cos 1  LdwTang  
Slab TeHspInc
2

2

 SpSM

18. Stiffening Pipe (316027A01P18):

T.R.: Painting is to be done as per HE77001.


CneckW
TeLspD   LdwLIb  LdwUEL   tan  LdwTang   
2


TeHspL 2  TeMspD  WbSpD  PdTk Cos 1  LdwTang    Slab TeHspInc
2

2
 SpSM

* Optional user input ** Input taken by program other than expression 9


Dome Internal Stiffening (160-27)

19. Stiffening Pipe (316027A01P19):

T.R.: Painting is to be done as per HE77001.


CneckL
FeUspD   LdwUIb  LdwUEL  tan  LdwFang   
2


FeHspL1  FeUspD  TeSpD1  TeSpD 2  PdTk Cos 1  Ldwfang    Slab FeHspInc
2

2
 Sp Sm

20. Stiffening Pipe (316027A01P20):

T.R.: Painting is to be done as per HE77001.


CneckL
ReUspD   LdwUIb  LdwUEL  tan  LdwRang   
2

Re HspInc  HspOD Tan  LdwTang  


Re HspL5  ReUspD  TeSpD1  PdTk  Cos 1  LdwRang   
Slab Re HspInc
  Sp Sm
2 2

* Optional user input ** Input taken by program other than expression 10


Dome Internal Stiffening (160-27)

21. Slab (316027A01P21):

T.R.: Painting is to be done as per HE77001.

22. Pipe Assembly (316027A01P22):

PAHt= VsPL5+SpPLTk

T.R.:
1. Visual inspection of weld seams to be done as per HW0620099, Classification group
CS/CK.
2. Non Destructive Examination of welds seams as per HW 0850199, part-10.
3. Painting is to be done as per HE77001.

* Optional user input ** Input taken by program other than expression 11


Dome Internal Stiffening (160-27)

4. 22-1. Stiffening Pipe (316027S01P01):

Slab
VsPL5  LdwMIb  LdwUIb  SpPLTk  SpSh 
2

22-2. Plate (816027S01P02):

* Optional user input ** Input taken by program other than expression 12


Dome Internal Stiffening (160-27)

23. Stiffening Pipe Assembly (216027A01P23):

T.R.:
5. Visual inspection of weld seams to be done as per HW0620099, Classification group
CS/CK.
6. Non Destructive Examination of welds seams as per HW 0850199, part-10.
7. Painting is to be done as per HE77001.

LSpD  LdwLIb  LdwMIb

MSpD  LdwMIb  LdwUIb

USpD  LdwUIb  UdwLIb

* Optional user input ** Input taken by program other than expression 13


Dome Internal Stiffening (160-27)

23-1. Stiffening Pipe (316027A01P01): This item is same as item no.1

23-2. Stiffening Pipe (316027A01P03): This item is same as item no.3

23-3. Stiffening Pipe (316027A01P05): This item is same as item no.5

23-4. Stiffening Pipe (316027A01P06): This item is same as item no.6

23-5. Slab (316027A01P21): This item is same as item no.21

23-6. Stiffening Pipe (316027A01P25): This item is same as item no.25

24. Stiffening Plate (316027A01P24):

SpLHc  2 SpSh

SpLHt  LdwUIb  LdwUEL  SpLWL  SpLHc

SpCw  VspOD  Wr1

SpHD  Slab

* Optional user input ** Input taken by program other than expression 14


Dome Internal Stiffening (160-27)

25. Stiffening Pipe (316027A01P25):

VspL8  TeSpD1  Slab

26. Stiffening Pipe (316027A01P26):

VspL9  2WbSpD  Slab

* Optional user input ** Input taken by program other than expression 15