序号 Sequence of job steps 工作主要步骤 Potential Hazards 潜在危害 Mitigation / Controls 危害控制
Miscommunication. Prepare PTW, Supplementary certificates and JSA
Lack of attention. Conduct Tool Box Talk (TBT)
1. Job Preparation
Bypass procedure Proper PPEs
Un-experienced Select competent persons.
2. Hang off blocks and slip and cut Improper tools or lifting gears Use correct procedure for using man riding tugger
drill line. to install hang off slings on to travelling blocks,
care should be taken not to pinch hands or fingers
Blocks dropping to rig floor between the drill lines. Clear area below.
Personal injury. Check the shackles are fitted correctly.
Slipping line off the drum to fast causing injury or Lower the blocks slowly until the weight has been
damage to wire.. taken by the hang off lines.
Wicker wires damaging hands while handling line. Set safety clamp at the required slipping distance.
Caught in draw works drum. Check everything is safe before slacking off the
dead man anchor bolts. Do not remove clamp
completely.
Slip line slowly off the cable spool on to draworks
drum checking the line is not hanging up on
anything and is coming freely off the storage drum
on the deck, Man on brake at deadline anchor to
allow the line through slowly, be ready to put on
brake if problem occurs. Keep hands and feet
clear of the line; take care for wire wickers on the
line which could damage hands.
Check line is spooling correctly on to draworks
CNPC Iraq Branch HSE-MS record No. 22
Wire wicker damage to hands. damage from broken strands when manually
handling wire.
5. Reeve & Un reeve drill line, Use improper hand tools Use proper tools and PPEs
Crush injury, Caught in draw works drum. Stay in safe place.
Clamp not secured correctly and blocks dropping. Proper communication
Equipment damage. Area barrication / warning signs
Dropped objects. Proper supervision
Miscommunication Use proper signals / communication.
Where working at height use aloft tools (ref.
working at height JSA.
6. Use of oxyacetylene torch Fire Inspect the tools prior to use.
Injury or Fatal Flash back arrestor to be installed.
Property damage Spry water in hot sparks.
Rope swing Area should be
Barricaded the work area
Put fire extinguisher in the work area
7. Re-torque drilling line clamps & Fatal Ensure the clamp tighten as per recommended
check. torque.
drops
Tool pusher is responsible triple check.
property damage
8.
9. Clear work area upon completion. Trips and falls. Clear up work area of tools etc, upon completion
of the job.
CNPC Iraq Branch HSE-MS record No. 22
Recovery In case of any human injury, the victim shall be shifted from rig floor to clinic through man basket, spinal board, tagline and crane or air winch...
Method 后 (Obtain assistance from Rig Medic for serious accident, alert Supervisor for emergency procedures).
果控制 In case of any emergency alarm (Fire, H2S, Kick, Security), stop the work in safe manner and move to the designated muster point.