: TG-HSE-JSA-SCF-001
JOB SAFETY ANALYSES Issue Date: 01-Nov-23
Issue No.: 01
Associated Permit No.: RO-3620621275 29-Sep-23
Location/Area: Onshore Facilities
Work/Job/Project (Contract No. ) PCTSB-SA-0922-217
Brief Descriptión (Work/Operation): Scaffolding
No. Activities Reason Of The Risk Prevention And Control Actions
Keep centered in the boat, stay away from
edges while travelling on the ferry, life
1 On-boat transfer Falling from boat, dizziness, seasickness
saving equioment (life jacket and life buoy),
anti-nausea pills
Transfer from boat to offshore Correct manual material handling procedure
2 Slips, falling from frog, frog damage
platform
Establish lines of communication. Only
Hold a pre-job safety meeting with all Miscommunication, equipment/property personal authorized and trained by DQ may
3
personal involved. damage or injury due to lack of training. operate, Mke sure everybody indrstood the
JSA.
Prepare tools materials for scaffold Correct manual material handling procedure
4 Manual handling personal injury
erection/dismanting
Check location for the condition of ground,
obstruction overhead wires and tie-in
Setting the scaffold by obtaining mud Mechanical Failure, stuck between problems, ensure that the transom are
5
sills or base plates objects tightly inserted to the lowest V connectors,
attach ledgers when holding standards in
place. Use protective hand and footwear.
Proper manual handling technique, buddy
system for goods 25 kg / use mechanical
6 Start erection of scaffold Body injury hoisting appliance if necessary wear proper
gloves if applicable. Watch out for footsteps