Professional Documents
Culture Documents
𝑘𝑊 − ℎ𝑟 𝐺𝑒𝑛𝑒𝑟𝑎𝑡𝑒𝑑 𝑖𝑛 𝑎 𝑦𝑒𝑎𝑟
𝐶𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝐹𝑎𝑐𝑡𝑜𝑟𝑦𝑒𝑎𝑟𝑙𝑦 =
ℎ𝑟
𝑘𝑊 𝑖𝑛𝑠𝑡𝑎𝑙𝑙𝑒𝑑 × 8,760
𝑦𝑟
𝑃𝑙𝑎𝑛𝑡 𝐶𝑎𝑝𝑎𝑐𝑖𝑡𝑦, 𝑘𝑊 𝐿𝑜𝑎𝑑 𝐹𝑎𝑐𝑡𝑜𝑟
3. 𝑅𝑒𝑠𝑒𝑟𝑣𝑒 𝐹𝑎𝑐𝑡𝑜𝑟 = =
𝑀𝑎𝑥𝑖𝑚𝑢𝑚 𝐿𝑜𝑎𝑑, 𝑘𝑊 𝐶𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝐹𝑎𝑐𝑡𝑜𝑟
22.5𝑀𝑊
𝐿𝑜𝑎𝑑 𝐹𝑎𝑐𝑡𝑜𝑟𝑠𝑡𝑎𝑛𝑑−𝑏𝑦 = = 0.75
30
𝐿𝑜𝑎𝑑 𝐹𝑎𝑐𝑡𝑜𝑟 𝑓𝑜𝑟 𝑡ℎ𝑒 70𝑀𝑊 𝐵𝑎𝑠𝑒 − 𝐿𝑜𝑎𝑑 𝑃𝑜𝑤𝑒𝑟 𝑃𝑙𝑎𝑛𝑡
30𝑀𝑊×6 + 70𝑀𝑊×6 + 60𝑀𝑊×4 + 70𝑀𝑊×6 + 60𝑀𝑊×2 1380𝑀𝑊−ℎ𝑟
𝐴𝑣𝑒. 𝐿𝑜𝑎𝑑𝐵𝑎𝑠𝑒−𝐿𝑜𝑎𝑑 = = = 57.5𝑀𝑊
24ℎ𝑟 24ℎ𝑟
57.5𝑀𝑊
𝐿𝑜𝑎𝑑 𝐹𝑎𝑐𝑡𝑜𝑟𝐵𝑎𝑠𝑒−𝐿𝑜𝑎𝑑 = = 0.82
70
= 0.75
Example 2
The peak load on a power plant is 60MW. The loads having the
maximum demands of 30MW, 20MW, 10MW, and 14MW are
connected to the plant. The capacity of the power plant is 80MW and
the annual load factor is 0.5
Estimate:
a) Average Load
b) Energy Supplied per year
c) Demand Factor
d) Diversity Factor
Given:
Plant Capacity = 80MW
Peak Load = 60MW
Individual Capacity = 30MW, 20MW, 10MW, 14MW
Load of the substation
Solution:
𝐴𝑣𝑒𝑟𝑎𝑔𝑒 𝐿𝑜𝑎𝑑
a)𝐿𝑜𝑎𝑑 𝐹𝑎𝑐𝑡𝑜𝑟 = = 0.50
𝑃𝑒𝑎𝑘 𝐿𝑜𝑎𝑑
𝑀𝑊 − ℎ𝑟
𝐸𝑛𝑒𝑟𝑔𝑦 𝐺𝑒𝑛𝑒𝑟𝑎𝑡𝑒𝑑 𝑝𝑒𝑟 𝑦𝑒𝑎𝑟 = 262,800
𝑦𝑟
𝑀𝑎𝑥 𝐷𝑒𝑚𝑎𝑛𝑑 20 MW
c) 𝐷𝑒𝑚𝑎𝑛𝑑 𝐹𝑎𝑐𝑡𝑜𝑟 =
𝑇𝑜𝑡𝑎𝑙 𝐶𝑜𝑛𝑛𝑒𝑐𝑡𝑒𝑑 𝐷𝑒𝑚𝑎𝑛𝑑
60 𝑀𝑊
𝐷𝑒𝑚𝑎𝑛𝑑 𝐹𝑎𝑐𝑡𝑜𝑟 = = 0.813
30𝑀𝑊 + 20𝑀𝑊 + 10𝑀𝑊 + 14𝑀𝑊
10 MW
𝐼𝑛𝑑𝑖𝑣𝑖𝑑𝑢𝑎𝑙 𝑀𝑎𝑥 𝐷𝑒𝑚𝑎𝑛𝑑
d) 𝐷𝑖𝑣𝑒𝑟𝑠𝑖𝑡𝑦 𝐹𝑎𝑐𝑡𝑜𝑟 =
𝑇𝑜𝑡𝑎𝑙 𝑆𝑖𝑚𝑢𝑙𝑡𝑎𝑛𝑒𝑜𝑢𝑠 𝐷𝑒𝑚𝑎𝑛𝑑
0 hr 24 hr