This method statement outlines the process for installing hollow core concrete slabs using propping and ERMIB chains at the Waltham Forest BSF Project. The slabs will be lifted into place using the chains and temporarily supported by propping until fully installed. Health and safety managers must approve the plan. It was prepared by the civil works manager and engineering in charge for review by project directors and managers.
This method statement outlines the process for installing hollow core concrete slabs using propping and ERMIB chains at the Waltham Forest BSF Project. The slabs will be lifted into place using the chains and temporarily supported by propping until fully installed. Health and safety managers must approve the plan. It was prepared by the civil works manager and engineering in charge for review by project directors and managers.
This method statement outlines the process for installing hollow core concrete slabs using propping and ERMIB chains at the Waltham Forest BSF Project. The slabs will be lifted into place using the chains and temporarily supported by propping until fully installed. Health and safety managers must approve the plan. It was prepared by the civil works manager and engineering in charge for review by project directors and managers.
Ref: ALL / SL / E0 / ALL / BYG / MS / / A Page 0 of 12
Area Level Trade School Issuer Type Sequence Rev. (By BY-UK)
Title: Method Statement - Waltham Forest
Slab Construction - Hollow Core planks installation (with propping) with use of ERMIB chains
A 5/8/2007 PPO TJU JLE DMR MTR SFR Review
S/C or Civil Superintendant Eng. in Charge Works Project Production Rev. Date Manager H&S Manager System Manager Section Manager Detail Manager Approval Prepared
Distribution : EiC X H&S X Site Manager X PSM X Project Director X
TJU MTR NCO RGO RBR JLE LWE CWM X Superintendant X Supervisors X DMR PPO SRE