Professional Documents
Culture Documents
Use the average of the stress for short term loading and stress for long term loading as the
allowable stress, since this calculation is for steel materials for temporary structures.
1.11×10 5
fb2=
(Lb・h)/Af
Use the larger one of the values obtained from the above formula.
However,it must be less than the allowable tensile stress.
81.3
fc =
(λ/120) 2 (λ>120)
1)Penetration depth
2)Cross section
Occurrence
Working Mmax position σb δmax
condition (kN・m) (GL-m) (N/mm2 ) (mm)
1st excavation 19.20 4.157 10.6 9.47
2nd excavation 205.29 4.709 113.0 19.86
3rd excavation 273.02 7.103 150.3 21.66
1st replacement 82.65 3.745 45.5 2.78
2nd replacement -9.01 2.150 5.0 0.19
Max. value 273.02 7.103 150.3 21.66
(fb= 225.0 N/mm2 )
2-2 Waler
1)
Each Lm Ln W M N S
stage (m) (m) (kN/m) (kN・m) (kN) (kN)
1st stage 5.000 0.000 105.58 329.94 0.00 263.95
2nd stage 3.500 0.000 260.54 398.96 0.00 455.95
2-3 Strut
1)
Each Lm Ln W Wd Na Nt M N
stage (m) (m) (kN/m) (kN/m) (kN) (kN) (kN・m) (kN)
1st stage 14.000 7.500 105.58 5.00 791.86 150.00 122.50 941.86
2nd stage 14.000 6.500 260.54 5.00 1693.53 150.00 122.50 1843.53