Title ITP for Soil Filling

Document No. ELT-01-CQ-PC-0103


Revision No. A
Page No. 1 of 7

ITP for Soil Filling

PROJECT NAME : Andres LNG Terminal Expansion Project, Dom Republic


LOCATION : Punta Caucedo, Boca Chica, Dominican Republic
OWNER : Energía Natural Dominicana Enadom S.R.L
CONTRACTOR : POSCO Engineering & Construction CO., Ltd.
DISCIPLINE : Quality Assurance / Quality Control

FOR APPROVAL

A 23 Jul 2021 Issue for Approval Mayo Rivera J M Baek Y J Kim J M Oh

Rev. Issue Date Description Prepared Reviewed Checked Approved


No.
The contents of this document are the sole property of POSCO E&C. Any rights not expressly granted
herein are reserved. Reproduction, transfer or distribution of part or all of the contents in any form
without the prior written permission of POSCO E&C is prohibited.
Document No.: ELT-01-CQ-PC-0103
ITP for Soil Filling Rev. No. :A
Page No. : 2 of 7

Description
INSPECTED BY
No. of Reference Acceptance Frequency Records Remarks
Sub POSC Own
Inspection / Documents Criteria Con. O er
Test

1 Preparing

95% Density for


Subbase Course or
Before
Compaction Soil Filling
1.1 QPP-CR-001 Spreading H R SW
check
100% Density for Soil
Base Course

No garbage or un
Before
Cleaning acceptable gravel
1.2 QPP-CR-001 Spreading H R R
Status size. Reference
Soil
QPP-CR-001.

2 Soil Spreading

Before
Soil Status Acceptable material
2.1 Tecnilab Test Spreading
according to the
Check Result
design submitted Soil
After
Soil Less than 30cm
2.2 QPP-CR-001 layer, smaller than Checking H R R
Spreading
1000 m2 area Soil
Enough moisture for After
2.3 Watering QPP-CR-001 H R R
95% density result. Spreading
Giving Proper
Laboratory
Compaction with After
2.4 Compaction QPP-CR-001 density test H R SW
vibrating, reaching Watering
result.
95% density

3 Next Layer

Clean and
acceptable surface

Before Inspection
3.1 Level & Area QPP-CR-001 H W SW
Conducting Notification
Check Check the level
next layer
difference of filled
area.
Document No.: ELT-01-CQ-PC-0103
ITP for Soil Filling Rev. No. :A
Page No. : 2 of 7

Description
INSPECTED BY
No. of Reference Acceptance Frequency Records Remarks
Sub POSC Own
Inspection / Documents Criteria Con. O er
Test

material acceptance Before


Soil Status Inspection
3.2 Tecnilab Test according to Spreading H W SW
Check Result specification Notification
requirements Soil
ABBREVIATION : S : Surveillance, R : Review, W : Witness Point, H : Hold Point
* NOTE

POSCO E&C FORM No.: 5TR-0003-001(0)


Document No.: ELT-01-CQ-PC-0103
ITP for Soil Filling Rev. No. :A
Page No. : 4 of 7

Inspection Notification No.0001


Project Name Andres LNG Terminal Expansion Project, Dom Republic
Project No. 020-21 Subcontractor Consorcio Remix S.A.
System Soil Filling Notification No./Date 0001 June 01, 2021
Discipline Civil Eng Inspection Date/Time
ITP No. CR-001 Activities Soil Filling.
Reference
DWG.
Inspection
Soil Filling
Items
Detail Description (If Required)

- Inspection for: Soil Filling


- Soil Filling Plan:
CONSORCIO REMIX
POSCO E&C Construction POSCO E&C QA/QC
Subcontractor
Name
Position
Signature
Date
Results of Inspection: Accepts ( ), Rejects( ), Accepts with Comments ( )
Document No.: ELT-01-CQ-PC-0103
ITP for Soil Filling Rev. No. :A
Page No. : 5 of 7

Punch List

INSPECTION NOTIFICATION No.: 0001 PAGE: 1 of 1

DISCIPLINE: Civil SUBCON: Consorcio Remix S.A.

ITP No.: CR-001

DESCRIPTION:
COMPLETED
ITEM DRAWING No. DESCRIPTION
SUBCON. CE/QC
1 Cleaning CONSORCIO REMIX
2 Soil Filling CONSORCIO REMIX
Document No.: ELT-01-CQ-PC-0103
ITP for Soil Filling Rev. No. :A
Page No. : 6 of 7

Line No: Pit No’s:

CHECKLIST STEP CONFORMANCE


This ITP is to be read in accordance with the approved plans and specifications. YES NO N/A
1. Preconstruction completed and conforms
2. Quality of the material used as backfill is acceptable according to project
specifications.
3. Area where the filling will be is clean, with no plastic, papers, wood or any
other organic material.
4. Original soil compacted to project standards.

5. Backfilled with imported granular fill material in 300mm layers compacted to


95% std compaction. ASTM test certificates
attached

6. The compaction equipment was used properly according to material and


layer thickness.

Verified and Signed by CONSORCIO REMIX Superintendent: .................................... Date:

Verified and Signed by POSCO Supervisor: ....................................


Document No.: ELT-01-CQ-PC-0103
ITP for Soil Filling Rev. No. :A
Page No. : 7 of 7