QUALITY CHECKLIST FOR SITE WORKS

FLOORING/ DADOING
ARCHITECTURAL INTERIOR

FLOORING DADOING SKIRTING EXTERNAL CLADDING


Name of the Customer: Date:
Project Name: Project ID:
Name of the Contractor: Location:
Drawing Ref. No.: Quantity:

1. Ceramic tile 2. Vitrified tile 3. Marble 4. Granite

5. Cement based tile 6. Mosaic 7. Paver block 8. Others

CL : 08
Sl.No. Description YES NO NA
I Prior to Tiling:
1 Check for COMPLETION OF PRECEDING ACTIVITIES like
fixing of Door, Frames, Partitions, etc.
2 A. Check for Provision of Service Conduits, junction Boxes,
plumbing, etc.
3 Is the SAMPLE OF TILES approved?.

4 Check for MORTAR MIX/ ADHESIVE PROPORTION. Is it as


specified?
5 Check for THICKNESS OF MORTAR BED. Is it o.k?

6 Check for PATTERN OF LAYING. Is it ok?

7 Check for TOP LEVEL. Is it o.k?

LAYING PAVER BLOCKS

1 All pipe line/ Conduiting/ Sleeve work completed.

2 Check formation level ie. Bottom of sand bedding

3 Check thickness, shape, colour, pattern of paver blocks.

CORRECTIVE ACTION PROPOSED- Item wise.


If 'No' is marked, please specify reasons and thereafter corrective action proposed.
(Add additional sheets, if necessary)
Comments:

Contractor's Rep.: Client Rep.: Lemcon Rep.: