PROJECT: Project Dream House (PROPOSED THREE-STOREY RESIDENCE WITH BASEMENT)

LOCATION: Baguio City


OWNER: Gerrimi G. Santos

BILL OF MATERIALS AND COST ESTIMATES

ITEM DESCRIPTION QTY UNITS MATERIALS


UNIT COST
A. GENERAL REQUIREMENTS
Mobilization & Demobilization 1 Lumpsum
Board-up 1 Lot
Layout and Batterboards 1 Lumpsum
SITE AND EARTHWORKS
Excavation 530 cu.m.
Earthfill 270 cu.m.
Soil Poisoning 1 Lumpsum
TEMPORARY FACILITIES
PROJECT: Project Dream House (PROPOSED THREE-STOREY RESIDENCE WITH BASEMENT)
LOCATION: Baguio City
OWNER: Gerrimi G. Santos

BILL OF MATERIALS AND COST ESTIMATES

ITEM DESCRIPTION QTY UNITS MATERIALS


UNIT COST
A. GENERAL REQUIREMENTS
Mobilization & Demobilization 286.4286 Lumpsum
Board-up 324.5357 Lot
Layout and Batterboards 362.6429 Lumpsum
SITE AND EARTHWORKS 400.75
Excavation 438.8571 cu.m.
Earthfill 476.9643 cu.m.
Soil Poisoning 515.0714 Lumpsum
TEMPORARY FACILITIES
PROJECT: Project Dream House (PROPOSED THREE-STOREY RESIDENCE WITH BASEMENT)
LOCATION: Baguio City
OWNER: Gerrimi G. Santos

BILL OF MATERIALS AND COST ESTIMATES


ITEM DESCRIPTION QTY UNITS MATERIALS
UNIT COST
A. GENERAL REQUIREMENTS
Mobilization & Demobilization 553.1786 Lumpsum
Board-up 591.2857 Lot
Layout and Batterboards 629.3929 Lumpsum
SITE AND EARTHWORKS 667.5
Excavation 705.6071 cu.m.
Earthfill 743.7143 cu.m.
Soil Poisoning 781.8214 Lumpsum
TEMPORARY FACILITIES
PROJECT: Project Dream House (PROPOSED THREE-STOREY RESIDENCE WITH BASEMENT)
LOCATION: Baguio City
OWNER: Gerrimi G. Santos

BILL OF MATERIALS AND COST ESTIMATES

ITEM DESCRIPTION QTY UNITS MATERIALS


UNIT COST
A. GENERAL REQUIREMENTS
Mobilization & Demobilization 819.9286 Lumpsum
Board-up 858.0357 Lot
Layout and Batterboards 896.1429 Lumpsum
SITE AND EARTHWORKS 934.25
Excavation 972.3571 cu.m.
Earthfill 1010.464 cu.m.
Soil Poisoning 1048.571 Lumpsum
TEMPORARY FACILITIES
PROJECT: Project Dream House (PROPOSED THREE-STOREY RESIDENCE WITH BASEMENT)
LOCATION: Baguio City
OWNER: Gerrimi G. Santos

BILL OF MATERIALS AND COST ESTIMATES

ITEM DESCRIPTION QTY UNITS MATERIALS


UNIT COST
A. GENERAL REQUIREMENTS
Mobilization & Demobilization 1086.679 Lumpsum
Board-up 1124.786 Lot
Layout and Batterboards 1162.893 Lumpsum
SITE AND EARTHWORKS 1201
Excavation 1239.107 cu.m.
Earthfill 1277.214 cu.m.
Soil Poisoning 1315.321 Lumpsum
TEMPORARY FACILITIES
PROJECT: Project Dream House (PROPOSED THREE-STOREY RESIDENCE WITH BASEMENT)
LOCATION: Baguio City
OWNER: Gerrimi G. Santos

BILL OF MATERIALS AND COST ESTIMATES

ITEM DESCRIPTION QTY UNITS MATERIALS


UNIT COST
A. GENERAL REQUIREMENTS
Mobilization & Demobilization 1353.429 Lumpsum
Board-up 1391.536 Lot
Layout and Batterboards 1429.643 Lumpsum
SITE AND EARTHWORKS 1467.75
Excavation 1505.857 cu.m.
Earthfill 1543.964 cu.m.
Soil Poisoning 1582.071 Lumpsum
TEMPORARY FACILITIES
PROJECT: Project Dream House (PROPOSED THREE-STOREY RESIDENCE WITH BASEMENT)
LOCATION: Baguio City
OWNER: Gerrimi G. Santos

BILL OF MATERIALS AND COST ESTIMATES

ITEM DESCRIPTION QTY UNITS MATERIALS


UNIT COST
A. GENERAL REQUIREMENTS
Mobilization & Demobilization 1620.179 Lumpsum
Board-up 1658.286 Lot
Layout and Batterboards 1696.393 Lumpsum
SITE AND EARTHWORKS 1734.5
Excavation 1772.607 cu.m.
Earthfill 1810.714 cu.m.
Soil Poisoning 1848.821 Lumpsum
TEMPORARY FACILITIES
PROJECT: Project Dream House (PROPOSED THREE-STOREY RESIDENCE WITH BASEMENT)
LOCATION: Baguio City
OWNER: Gerrimi G. Santos

BILL OF MATERIALS AND COST ESTIMATES

ITEM DESCRIPTION QTY UNITS MATERIALS


UNIT COST
A. GENERAL REQUIREMENTS
Mobilization & Demobilization 1886.929 Lumpsum
Board-up 1925.036 Lot
Layout and Batterboards 1963.143 Lumpsum
SITE AND EARTHWORKS 2001.25
Excavation 2039.357 cu.m.
Earthfill 2077.464 cu.m.
Soil Poisoning 2115.571 Lumpsum
TEMPORARY FACILITIES
PROJECT: Project Dream House (PROPOSED THREE-STOREY RESIDENCE WITH BASEMENT)
LOCATION: Baguio City
OWNER: Gerrimi G. Santos

BILL OF MATERIALS AND COST ESTIMATES

ITEM DESCRIPTION QTY UNITS MATERIALS


UNIT COST
A. GENERAL REQUIREMENTS
Mobilization & Demobilization 2153.679 Lumpsum
Board-up 2191.786 Lot
Layout and Batterboards 2229.893 Lumpsum
SITE AND EARTHWORKS 2268
Excavation 2306.107 cu.m.
Earthfill 2344.214 cu.m.
Soil Poisoning 2382.321 Lumpsum
TEMPORARY FACILITIES
PROJECT: Project Dream House (PROPOSED THREE-STOREY RESIDENCE WITH BASEMENT)
LOCATION: Baguio City
OWNER: Gerrimi G. Santos

BILL OF MATERIALS AND COST ESTIMATES


ITEM DESCRIPTION QTY UNITS MATERIALS
UNIT COST
A. GENERAL REQUIREMENTS
Mobilization & Demobilization 2420.429 Lumpsum
Board-up 2458.536 Lot
Layout and Batterboards 2496.643 Lumpsum
SITE AND EARTHWORKS 2534.75
Excavation 2572.857 cu.m.
Earthfill 2610.964 cu.m.
Soil Poisoning 2649.071 Lumpsum
TEMPORARY FACILITIES
PROJECT: Project Dream House (PROPOSED THREE-STOREY RESIDENCE WITH BASEMENT)
LOCATION: Baguio City
OWNER: Gerrimi G. Santos

BILL OF MATERIALS AND COST ESTIMATES

ITEM DESCRIPTION QTY UNITS MATERIALS


UNIT COST
A. GENERAL REQUIREMENTS
Mobilization & Demobilization 2687.179 Lumpsum
Board-up 2725.286 Lot
Layout and Batterboards 2763.393 Lumpsum
SITE AND EARTHWORKS 2801.5
Excavation 2839.607 cu.m.
Earthfill 2877.714 cu.m.
Soil Poisoning 2915.821 Lumpsum
TEMPORARY FACILITIES
PROJECT: Project Dream House (PROPOSED THREE-STOREY RESIDENCE WITH BASEMENT)
LOCATION: Baguio City
OWNER: Gerrimi G. Santos

BILL OF MATERIALS AND COST ESTIMATES

ITEM DESCRIPTION QTY UNITS MATERIALS


UNIT COST
A. GENERAL REQUIREMENTS
Mobilization & Demobilization 2953.929 Lumpsum
Board-up 2992.036 Lot
Layout and Batterboards 3030.143 Lumpsum
SITE AND EARTHWORKS 3068.25
Excavation 3106.357 cu.m.
Earthfill 3144.464 cu.m.
Soil Poisoning 3182.571 Lumpsum
TEMPORARY FACILITIES
PROJECT: Project Dream House (PROPOSED THREE-STOREY RESIDENCE WITH BASEMENT)
LOCATION: Baguio City
OWNER: Gerrimi G. Santos

BILL OF MATERIALS AND COST ESTIMATES

ITEM DESCRIPTION QTY UNITS MATERIALS


E WITH BASEMENT)

TOTAL TOTAL
MAT'L. COST AMOUNT

E WITH BASEMENT)

E WITH BASEMENT)
E WITH BASEMENT)

0.00
0.00

You might also like