You are on page 1of 5

Silo – Support Lug Geometry Progress

FEA Simulation
Timeline Review with EMI
engineer

15/04 21/04 22/04 26/04 30/04 04/05

PT EMI-Energia PT EMI-Energia - Start 3D model Estimate Estimate Estimate


1st Meeting 2nd Meeting - 1st Technical Meeting 3D model FEA Calculation Reporting
Finish Finish And Submit to PT EMI
Start FEA
Calculation

Define Boundary
condition
Material Properties

26/04 27/04 TBD

Kick Of Meeting Estimation Finalize


With PT EMI MoM release for Commercial
1st term commercial After submit FEA
Report
Right Analysis , Right Decision
Task 2 . Geometry model Development Core.Tech@energiaindonesia.com
Silo – Support Lug Geometry Progress

2D Reference Silo Assembly Detailed Supporting Lug

Right Analysis , Right Decision


Task 2 . Geometry model Development Core.Tech@energiaindonesia.com
Silo – Support Lug Geometry Progress

Gussets

Ring Plate

Base Ring

Right Analysis , Right Decision


Task 2 . Geometry model Development Core.Tech@energiaindonesia.com
Silo – Support Lug Geometry Progress

Input Parameter
Operation Empty silo 17.02 Ton
Weight
Solid Product 83.16 Ton
Total Weight 101 Ton
Material SS304 MPa
Plate thickness Done refer to
drawing
Wind Parameter N/A
Seismic Horizontal 29909 Kg
Parameter seismic load
Vertical Seismic 2068 Kg
Load
Distance COG 3800 mm
supporting Lug

Right Analysis , Right Decision


Task 2 . Geometry model Development Core.Tech@energiaindonesia.com
Silo – Support Lug Geometry Progress

Issue :
Lateral Force compensation
Request I-Beam Information for reaction force calculation

Right Analysis , Right Decision


Task 2 . Geometry model Development Core.Tech@energiaindonesia.com

You might also like