You are on page 1of 10

KOLEJ WIT IPOH

(TECHNORATI CONSULTANCY (M)SDN.BHD.)


NO.8,JALAN CHARLETON,
OFF JALAN TUN ABDUL RAZAK,
30100 IPOH,PERAK DARUL RIDZUAN.

WORK SHEET

EE-320-3 : 2012 THREE PHASE ELECTRICAL INSTALLATION &


PROGRAM’S CODE & NAME
MAINTENANCE

LEVEL L3

COMPETENCY UNIT NO. AND COCU 5 : THREE PHASE ELECTRICAL APPLIANCES


TITLE MAINTENANCE

1 IDENTIFY ELECTRICAL APPLIANCES MAINTENANCE


REQUIREMENT, SPECIFICATION AND MANUALS
WORK ACTIVITIES NO. AND 2 PREPARE THREE PHASE ELECTRICAL APPLIANCES
STATEMENT MAINTENANCE TOOLS, EQUIPMENT AND MATERIALS
3 CARRY OUT ELECTRICAL APPLIANCES INSPECTION
4 CARRY OUT ELECTRICAL APPLIANCES MAINTENANCE

Page : 1
CODE NO. EE-320-3 : 2012 - C05 / K(1/1)
Of :4

TITLE: MAINTENANCE AND ELECTRICAL EQUIPMENT DAMAGE RESTORATION

OBJECTIVE: There are all kinds of electrical appliances used to facilitate the work
                    home. This includes an electric kettle, electric rice cookers, electric irons and
                    etc.
Page : 2
CODE NO. EE-320-3 : 2012 - C05 / K(1/1)
Of :4

LUKISAN, DATA & JADUAL:

-TIADA-

ARAHAN UMUM:
Anda diminta menyediakan skop kerja anda dan senaraikan kemahiran dan pengetahuan yang perlu dimiliki
bagi melaksanakan tugas tersebut.

PERALATAN, KELENGKAPAN & BAHAN-BAHAN :


1. Kertas
2. Peralatan menulis

EQUIPMENT / EQUIPMENT / MATERIAL:


Bills /
BIL ITEMS
Unit
1. Wiring Hammer 1
2. Cable Cutter 1
3. Screw Driver Set 1
4. Hacksaw 1
5. Combination Plier 1
6. Clips forming Tin 1
7. Long Nose Plier 1
8. Measuring Tape 1
9. Test Pen 1
10. Knife 1
11. Gimlet 1
12. Bag Galas 1

WORK INSTRUCTION:
Page : 3
CODE NO. EE-320-3 : 2012 - C05 / K(1/1)
Of :4

LUKISAN, DATA & JADUAL:

-TIADA-

ARAHAN UMUM:
Anda diminta menyediakan skop kerja anda dan senaraikan kemahiran dan pengetahuan yang perlu dimiliki
bagi melaksanakan tugas tersebut.

PERALATAN, KELENGKAPAN & BAHAN-BAHAN :


1. Kertas
2. Peralatan menulis

1. The trainees were asked to provide materials and equipment for using
hand tools when doing wiring work.
2. Know the work equipment used in electrical wiring work

FIGURE :
Page : 4
CODE NO. EE-320-3 : 2012 - C05 / K(1/1)
Of :4

LUKISAN, DATA & JADUAL:

-TIADA-

ARAHAN UMUM:
Anda diminta menyediakan skop kerja anda dan senaraikan kemahiran dan pengetahuan yang perlu dimiliki
bagi melaksanakan tugas tersebut.

PERALATAN, KELENGKAPAN & BAHAN-BAHAN :


1. Kertas
2. Peralatan menulis

EQUIPMENT / EQUIPMENT / MATERIAL:


Page : 5
CODE NO. EE-320-3 : 2012 - C05 / K(1/1)
Of :4

LUKISAN, DATA & JADUAL:

-TIADA-

ARAHAN UMUM:
Anda diminta menyediakan skop kerja anda dan senaraikan kemahiran dan pengetahuan yang perlu dimiliki
bagi melaksanakan tugas tersebut.

PERALATAN, KELENGKAPAN & BAHAN-BAHAN :


1. Kertas
2. Peralatan menulis

NO ITEM No. / Unit

1.1.1 1.1.2 1.1.3

WIRING HAMMER Kable Cutter Long Nose Plier

1.1.4 1.1.5 1.1.6

Wiring Hammer Pisau Pemotong Test Pen

1.1.7 1.1.8 1.1.9


Page : 6
CODE NO. EE-320-3 : 2012 - C05 / K(1/1)
Of :4

LUKISAN, DATA & JADUAL:

-TIADA-

ARAHAN UMUM:
Anda diminta menyediakan skop kerja anda dan senaraikan kemahiran dan pengetahuan yang perlu dimiliki
bagi melaksanakan tugas tersebut.

PERALATAN, KELENGKAPAN & BAHAN-BAHAN :


1. Kertas
2. Peralatan menulis

Measuring Tape Hacksaw Gimlet

1.1.10 1.1.11 1.1.12

Bag Galas Combination Plier Pembentuk Klip Timah

1. The trainees were asked to provide materials and equipment for using hand tools when doing
wiring work.
2. Know the work equipment used in electrical wiring work
Page : 7
CODE NO. EE-320-3 : 2012 - C05 / K(1/1)
Of :4

LUKISAN, DATA & JADUAL:

-TIADA-

ARAHAN UMUM:
Anda diminta menyediakan skop kerja anda dan senaraikan kemahiran dan pengetahuan yang perlu dimiliki
bagi melaksanakan tugas tersebut.

PERALATAN, KELENGKAPAN & BAHAN-BAHAN :


1. Kertas
2. Peralatan menulis

CHECKLIST
Page : 8
CODE NO. EE-320-3 : 2012 - C05 / K(1/1)
Of :4

LUKISAN, DATA & JADUAL:

-TIADA-

ARAHAN UMUM:
Anda diminta menyediakan skop kerja anda dan senaraikan kemahiran dan pengetahuan yang perlu dimiliki
bagi melaksanakan tugas tersebut.

WORK

a. Have security features


PERALATAN, KELENGKAPAN & BAHAN-BAHAN :
b. Compliance with safety procedures.
1. Kertas
c. Finished drawings, checklists and audit
2. Peralatan menulis
reports.

WORK PROCESS

a. Methods / use of proper equipment

b. Follow the correct procedures.


Not
No. Level
c. Period of the timeoftoAchievement
complete the task. Accepted Remark
Accepted

ATTITUDE
a. Cooperation in groups

b. Responsibility

c. Timely

SAFETYNESS

a. Proper work methods

b. Clean the workplace

c. Adhere to safety procedures.


Page : 9
CODE NO. EE-320-3 : 2012 - C05 / K(1/1)
Of :4

LUKISAN, DATA & JADUAL:

-TIADA-

ARAHAN UMUM:
Anda diminta menyediakan skop kerja anda dan senaraikan kemahiran dan pengetahuan yang perlu dimiliki
bagi melaksanakan tugas tersebut.

PERALATAN, KELENGKAPAN & BAHAN-BAHAN :


1. Kertas
2. Peralatan menulis
Page : 10
CODE NO. EE-320-3 : 2012 - C05 / K(1/1)
Of :4

LUKISAN, DATA & JADUAL:

-TIADA-

ARAHAN UMUM:
Anda diminta menyediakan skop kerja anda dan senaraikan kemahiran dan pengetahuan yang perlu dimiliki
bagi melaksanakan tugas tersebut.

PERALATAN, KELENGKAPAN & BAHAN-BAHAN :


1. Kertas
2. Peralatan menulis

_ ________________
__________________

( SIGNATURE OF CANDIDATE ) ( SIGNATURE OF PP )

DATE DATE

You might also like