GLOBAL SUSTAINABILITY ASSESSMENT SYSTEM

GSAS Construction Management 2019 (4th Edition)

[E.2] Energy Management - Plant and Equipment Checklist Issue 1 - October 2019

Project Information Legend Degree of Implementation


Date of Submission 15-01-2019 User Input
Not Appliable (Not weighted)
Project ID Reference Information None = 0
QA000-000122
Calculated Values Low = 0.5
Project Name Project XY
Fixed Values Moderate = 0.75
Stage Stage 1 By GSAS Trust only High = 1

Part A - External Lighting and Electrical Installation


Submitted Awarded (By GSAS Trust)
Index Methods and Measures
Degree of Achieved Degree of Achieved
Weight Impementation Percentage Weight Impementation Percentage

1 Use more efficient lighting fixtures such as compact fluorescent or LED lights 5.3% Moderate 3.9% 0.0% Not Applicable 0.0%

2 Ensure light fixtures are properly oriented to light the required work area/pathways 2.6% Moderate 2.0% 2.5% Moderate 1.9%

Ensure that light fixtures are zoned or are not on a single wiring circuit to control lighting
3 more efficiently allowing the light fixtures to be switched off when not required, for example 3.9% High 3.9% 3.7% High 3.7%
when day light is available or work is not scheduled in that area
Ensure that light fixtures are clean and maintained properly such that the light output is as
4 close as possible to the manufacturer specifications 1.3% High 1.3% 1.2% High 1.2%

5 Consider renewable energy sources for whole or part of site lighting 6.6% High 6.6% 6.2% High 6.2%

6 Ensure that flickering or damaged lights present on site are replaced 1.3% High 1.3% 1.2% High 1.2%

Ensure that generators are not oversized and run at low load conditions. Calculate the
genrator load factor based on the KWh that the generator would have produced at rated
power for the assessment period and the actual KWh reading from the generator energy
meter for the same assessment period.
7 (Effeciency less than 30% = None,
5.3% High 5.3% 4.9% High 4.9%
Effeciency between 30-40% = Low,
Effeciency between 40-50% =Med,
Effeciency above 50% =High)

8 Ensure that generator air intake path is clear of any obstruction 2.6% High 2.6% 2.5% High 2.5%

9 Monitor the overall electricity consumption from the generators 0.0% Not Applicable 0.0% 14.8% High 14.8%

10 Connect to the grid wherever possible 3.9% High 3.9% 3.7% High 3.7%

(Specifiy more methods and measures, if applicable)


0.0% Not Applicable 0.0%

0.0% Not Applicable 0.0%


Part B - Pumps and Fans
Submitted Awarded (By GSAS Trust)
Index Methods and Measures
Weight Degree of Achieved Weight Degree of Achieved
Impementation Percentage Impementation Percentage

Ensure that the dewatering pump flow rate and horsepower are suitable for the required
1 piping length and discharge flow. 6.6% High 6.6% 6.2% High 6.2%

Utilize high efficiency pumps.


(Effeciency less than 40% = None,
2 Effeciency between 40-50% = Low, 6.6% High 6.6% 6.2% High 6.2%
Effeciency between 50-60% =Med,
Effeciency above 60% =High)

3 Ensure that the fans are off when not required for occupational or health reasons. 3.9% High 3.9% 0.0% Not Applicable 0.0%

Utilize high efficiency fans.


(Effeciency less than 40% = None,
4 Effeciency between 40-50% = Low, 3.9% High 3.9% 3.7% Moderate 2.8%
Effeciency between 50-60% =Med,
Effeciency above 60% =High)

(Specifiy more methods and measures, if applicable)


0.0% Not Applicable 0.0%

0.0% Not Applicable 0.0%

Part C - External Construction Equipments


Submitted Awarded (By GSAS Trust)
Index Methods and Measures
Weight Degree of Achieved Weight Degree of Achieved
Impementation Percentage Impementation Percentage

Select electrically operated tower cranes with power optimization and control features. A
1 frequency converter regulating all drives and variable speed hoisting winch make cranes 0.0% Not Applicable 0.0% 0.0% Not Applicable 0.0%
more energy efficient than conventional cranes.
Ensure that air compressor and compressed air hoses are leak free in order to avoid longer
2 run times for the compressor. Air compressor motor with high efficiency rating will conserve 13.2% Moderate 9.9% 12.3% Moderate 9.3%
additional energy.

Utilize high efficiency rating motors for air compressors.


(Effeciency less than 40% = None,
3 Effeciency between 40-50% = Low, 7.9% High 7.9% 7.4% High 7.4%
Effeciency between 50-60% =Med,
Effeciency above 60% =High)

Utilize high efficiency rating water coolers.


(Efficient coolers less than 20% = None,
4 Efficient coolers between 20-40% = Low, 6.6% High 6.6% 6.2% High 6.2%
Efficient coolers between 40-80% =Med,
Efficient coolers above 80% =High)

(Specifiy more methods and measures, if applicable)


0.0% Not Applicable 0.0%

0.0% Not Applicable 0.0%

Part D - Training and Awareness


Submitted Awarded (By GSAS Trust)
Index Methods and Measures
Weight Degree of Achieved Weight Degree of Achieved
Impementation Percentage Impementation Percentage

1 Ensure operators are trained in energy saving practices. 18.4% Moderate 13.8% 17.3% Moderate 13.0%

(Specifiy more methods and measures, if applicable)


0.0% Not Applicable 0.0%

0.0% Not Applicable 0.0%

Submitted 90.1% Awarded 91.0%


Degree of Compliance Degree of Compliance

Results Submitted Awarded


Checklist Compliance Compliant Compliant

Level 3 3
Submittals

1. Photos of the lighting fixtures on site.


2. Specifications of the lighting fixtures.

1. Photos of the lighting fixtures on site.

1. Single line diagrams.


1. Site inspection reports/checklists.

1. Photos of renewable energy systems.


2. Specifications of installed renewable energy systems.

1. Site inspection reports.

1. Calculation showing average load on generators.


2. Signed and stamped logs from generator meters.
3. Generators specifications.
4. Photos of the generators on site.

1. Photos of generators intake.

1. Overall electricty consumption summary calculation.


2. Signed and stamped logs from generator meters.
3. Single line diagram showing the location of meters and generators.

1.Electricity invoices.
2. Single line diagram showing the location of the tie-in point for the utility supplier.
Submittals

1. Pressure drop calculations for pump selection.


2. Pumps specifications and/or photo of the name plate.

1. Pumps specifications and/or photo of the name plate.


2. Calculations showing the average efficiency of the pumps.
3. Photos of the pumps on site.

1. Training slide and/or warning stickers near the fans swithces.

1. Fans specifications and/or photo of the name plate.


2. Calculations showing the average efficiency of the fans.
3. Photos of the fans on site.

Submittals

1. Tower cranes specifications.


1. Site inspection reports/checklists.
2. Compressors specifications.

1. Compressors specifications.
2. Calculations showing the average efficiency of the compressors motors.
3. Photos of the compressors on site.

1. Water coolers specifications.


2. Calculations showing the average efficiency of the water coolers.
3. Photos of the water coolers on site.

Submittals

1. Training content slides.


2. Attendance sheets signed by a significant number of workers.